05000259/LER-1981-048-03, /03L-0:on 810828,recirculation Pump Trip Reactor High Pressure Switch 1-PS-3-204B Was Found Above Tech Spec Limit.Caused by Setpoint Drift.Switch Reset

From kanterella
(Redirected from ML20010H266)
Jump to navigation Jump to search
/03L-0:on 810828,recirculation Pump Trip Reactor High Pressure Switch 1-PS-3-204B Was Found Above Tech Spec Limit.Caused by Setpoint Drift.Switch Reset
ML20010H266
Person / Time
Site: Browns Ferry 
Issue date: 09/22/1981
From: Holder G
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010H264 List:
References
LER-81-048-03L-01, LER-81-48-3L-1, NUDOCS 8109240281
Download: ML20010H266 (2)


LER-1981-048, /03L-0:on 810828,recirculation Pump Trip Reactor High Pressure Switch 1-PS-3-204B Was Found Above Tech Spec Limit.Caused by Setpoint Drift.Switch Reset
Event date:
Report date:
2591981048R03 - NRC Website

text

, _

l HR'CFORM U. S. NUCLE AR REGULATORY COMMIS$10N LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l Ih (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 j o I i l l A l L l B l R j F l1 lgl50l0l-l0l0l0l0l0l-l0l0lgl4l1l1l1l1lgl l

lg 7

8 9 LICENSEE CODE 14 1

LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT b8 CON'T l 0 l 1]

$7,,$ l L @l 0 l 5 l 0 l 0 l 0 l 2 l 5 l 9 l@l 0 l 8 l 2 l 8 l 8 l 1 l@l0 l9 l2 l 2 l8 l1 l@

1 8

60 61 DOCKET NUMBER 68 69 EVENT D ATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES l o l 2 [ l During refueling outage, while perf ing SI 4.2.B-69, recirculation pump trip reactop high pressure switch (1-PS-3-204B) was found 0.5 percent above the limit of T.S.

,g;3, g ya; q gTable 3.2.B.

There was no danger to the health or safety of the public. Pedundant

Previous similar events

BFRO-50-260/78023, yois,; systems were available and operable.

80030.

Io is i 1 10171l i

10191I l

C DE CODE SUBC E COMPONENT CODE SUBC DE SU E

l o l '31

[_Tj_Aj@ W@ W@ l IlN lS lT lR lU l@ ]@ W @

F s

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REvlS8CN LER PO EVENT YEAR REPORT NO.

CODE TYPE N O.

hRE l 8l 1l l-l l 0l 4l 8l l/l l0 l3 l lLl g

J u

_ 21 22 23 24 26 27 28 29 30 31 32 K r ATO ON PL NT MET HOURS SB ITT FOR US.

SUPP IE MAN F A TURER (JJ@[_y j@

W@

[Z_j@

l010l0l0l W@

l Nl@

l Ll@

l Sl 3l 8l 2]g J3 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h ji joilSetpoint drift. Reset 1-PS-3-204B to proper setpoint and successfully completed l SI 4.2.B-69.

DCR 1398 will replace this switch with an analog transmitter and i i

,,,.,il bistable switch.

1 i 131 l l

li ta l I i

1 8 9 80 STA

% POWER OTHER STATUS ISCO R DISCOVERY DESCRIPYlON NA l

l B lgl Surveillance testing l

l 1 l', l [_Hj@ l 0 l 0 l 0 l@l

' ACHVITY 0

CO TENT A

RELE ACED CF RELE ASE AMOUNT OF ACTIVITY LOCA flON OF RELE ASE lijcl d @ W @l NA l

l NA l

1 8 9 30 11 44 45 80 Pgr4SONNEL FRPOSURES

'JUP/ tl E R TYPE

DESCRIPTION

l t l 7 l l 0l 0l OJ@l Zl@l NA l

unsOmd',muLS a0 oEsCmPnON@

Nu m R

(

lijall0lOlOl@l g

NA l

1 8

')

It 12 LO% OF OH DA*JAGE TO F ACILITY TYPE DE$CRIPTION l l9llj @l NA l

t b 3 10 go NHC USE ONLY ISSU D

HiPTION 121"l LSE8] E NA l

l[llll[llllll}

a 9 10 68 69 80 ;;

ne Homer

@M NM g

8109240281 810922 1ER pggyg PDR ADOCK 05000259 O

PDR

4' Tennessee Valley :\\uthority Forrn RF M P.rawns Ferry Nucle:u Plant BF 15.2 G/04/81

1. Ell SUl'PLEMENTA1, INI/Ol(M ATION 81048

2hl" 3*2.B Bi 110-50 _259 j T. bit M Syr.fi, a'i in In. <-d s* d 9/27/81 lleported Under Technical Specu'ication __6.7.2.b(2)

Date of Occurrence _8]28L81 Time of Occurrence 0940 Unit 1

!dentification and Description of Occurrence:

During performance of SI 4.2.B-69 recirculation pump trip reactor high pressure switch (1-PS-3-204B) was found 0.5 percent above the limit of T.S. Table 3.2.B.

Conditions Prior to Occurrence:

Unit 1 in refueling outage.

Unit 2 at 99%.

Unit 3 at 98%.

Action specified in the Technical Specification Surveillance Requirements met

.f m to inoperable etp;ipment.

De.;c rib e.

None Apparent Cause vi occurrence:

Setpoint drift.

At.alysis o!' Occur rem e.

There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, and no resulting significant chain of events.

Corrective Action

Reset 1-PS-3-204B to proper setpoint and successfully completed SI 4.2.B-69.

DCP 1398 will replace this switch with an analog transmitter and bistable switch.

Failure Data:

BFRO-50-260/78023, 80030.

It e ten tion :

Peryd - I.ifetime; ltesponsibility - Document Control Supervisor thevision :