05000259/LER-1981-045, Forwards LER 81-045/03L-0.Detailed Event Analysis Encl

From kanterella
(Redirected from ML20010G813)
Jump to navigation Jump to search
Forwards LER 81-045/03L-0.Detailed Event Analysis Encl
ML20010G813
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/10/1981
From: Green H
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010G814 List:
References
NUDOCS 8109220545
Download: ML20010G813 (2)


LER-1981-045, Forwards LER 81-045/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
2591981045R00 - NRC Website

text

..

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot i<

1750 Chestnut Street Tower II September 10, 1981 Y

((

b s.

Mr. James P. O'Reilly, Director

.U.S. Nuclear Regulatory Commission

.8) k M

gb > o Office of Inspection and Enforcement i' IO8/w ~

E8 Region II 101 Marietta Street, Suite 3100 h

  • NIsPgmc,,

Atlanta, Georgia 30303 b '.

Dear Mr. O'Reilly:

g' TENNESSEE VALLEY AUTHORITY - BROWNS FERRY NUCLEAR PLANT UNIT 1 - DOCKET NO. 50-259 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT BFRO-50-259/81045 The enclosed report provides details concerning unit 1 which was in a cold shutdown while units 2 and 3 were in the run mode with start bus undervoltage relays out of service for the'lA and IB start buses. This report is submitted in accordance with Browns Ferry unit 1 Technical Specification 6.7.2.b(2).

Very truly yours, TENNESSEE VALLEY A R

A.** d*

H. J. Green Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3)

Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Director (40)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 [h

Mr. Bill Lavallee Nuclear Safety Analysis Center s

Palo Alto, California 94303 Mr. R. F. Sullivan, NRC Inspector, Browns Ferry 8109220545 810910 PDR ADOCK 05000259 S

PDR An Equal Opportunity Employer

gww.B[)?

'Tendessee Valley Authority BF 15.2

- Browns Ferry Nuclear Plant 6/04/81 LER SUPPLEMENTAL, INFORMATION BFR9-50 _259.../ _810.45_.

Technical Specifica: ion.nvolved.29_ nan Reported Under Technical.becification 6_.L1._b(21

  • Date duc NRC:.. 9/18/31__

Date of Occurrence _8/19J8L Time of Occurrence _10L Unit i.na 2 Identification and Dcqcription of Occurrence:

15,1981, unit 1 was in cold shutc'oca and unit 2 and unit 3 were in On AuFust the run mode with start bus undervoltage relays out of service for the 1A and IB start buses.

(Reference T.S. 3.9.B.10)

Conditions Prior to Occurrence:

Unit 1 in cold shutdown.

Unit 2 at 76%.

Unit 3 at 98%.

Action specified in the Technical Specification Surveillance Requirements met due to inoperable equipment.

Describe.

Upon discovery of error, immediately met the requirements of T.S. 3.9.B.10.

Apparent Cause of Occurrence: Personnel error. During preliminary review of modification workplan which contained the removal from service of the 1A start bus undervoltage relays, it was not recognized that technical specification 3.9.B.10 did not permit this activity. Instead, the workplan was apprcved so that this modification and related modification to degraded voltage relays could be worked and tested together. The existing technical specification allowed the degraded voltage modification, but not the start bus undervoltage modification.

Proposed technical specifications would have allowed the start bus work, but were not approved. Also this was not identified in the USQD.

Analysis of Occurrence:

There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, and no resulting significant chain of events.

Corrective Action

1A start bus undervoltage relays were reconnected immediately upon discovery of the error. This is considered a random event and no further recurrence control is required.

t Failure

  • ata:

None Per' d - I.ifetime; Responsibility - Document Control Supervisor Retention :

  • Revision: