05000346/LER-1980-091-01, /01X-8:on 801223,analysis Per IE Bulletin 80-11 Determined That During Seismic Event,Wall Between Control Room & Stairway AB-1,walls 3307,2047,3167,2337,4806,4817, 4826,4831,4847,4857,4647 & 4016 Would Be Overstressed
From kanterella
(Redirected from ML20009C591)
Redirect page
Jump to navigation
Jump to search