05000259/LER-1981-026-03, /03L-0:on 810527,w/Units 1 & 2 Shutdown & Unit 3 at 100% Steady State,Wind Direction Channel XR-90-102-2 Failed.Caused by Blown Fuse in Line to Recorder,Due to Electrical Storm.Fuse Replaced & Sys Returned to Svc

From kanterella
(Redirected from ML20005A328)
Jump to navigation Jump to search
/03L-0:on 810527,w/Units 1 & 2 Shutdown & Unit 3 at 100% Steady State,Wind Direction Channel XR-90-102-2 Failed.Caused by Blown Fuse in Line to Recorder,Due to Electrical Storm.Fuse Replaced & Sys Returned to Svc
ML20005A328
Person / Time
Site: Browns Ferry 
Issue date: 06/25/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19257F089 List:
References
LER-81-026-03L-02, LER-81-26-3L-2, NUDOCS 8106300193
Download: ML20005A328 (2)


LER-1981-026, /03L-0:on 810527,w/Units 1 & 2 Shutdown & Unit 3 at 100% Steady State,Wind Direction Channel XR-90-102-2 Failed.Caused by Blown Fuse in Line to Recorder,Due to Electrical Storm.Fuse Replaced & Sys Returned to Svc
Event date:
Report date:
2591981026R03 - NRC Website

text

o 5 Nu q,sn escVLA 8 0H f COMMih500N nc u ai,c, lt //t LICENSEE EVENT REPOli.

L..l.. l..1 1 I

IG

< *5t "a '"' o a ' ^ 'i a c o u' a c o '"' o a "^"o"'

< oN o u n ni <,'

  • s e,

l.d)..'.) { A[L l 8 l R l F l 1 l@l 0 l 0 l-l 0 l 0 l 0 l 010 I lo lo l@l4 11 11 I1 11 l@l l

l@

/

e a

3 H.j pg,p t rf ig 3g 64 18, L eCE P. ;E rduMilE H J5

?f's LICENSE 1YPE JO it C A T 'ill e

[" El

":Jl,;'l,' LL,J@l 0 l 5101010 l 215 19 l@l _01 51 21 71 81 1 )@l 0 l 6 l 21 51 81 1 ]@

...t r i h84 fe'J LVf NT DATE 14 F's (IFPC,fli DA f f H0 8.'s ta l (jf jt'p E T NUMHE "t e on r i or.I HW Hi>N AND PROU AOLE CONSEQUENCES h channal 1 17]Z) [,With,, units 1 and 2 shut down, and unit 3 at 100% steady state _ wind diractinn

{;. g j gXR-90-102-2 (elevation 33 feet) failed. (See T.S. 3.3.I) The wind directiot channel I

l j., pq l is common to units 1, 2,, and 3.

There was no danger to_the health nr safety nf tha I

j,. p ) l public. Redundant systems were available and operable,_Ihere.were_.no previnus I

j. [.; ] l similar events.

I F 19 I __ __..

L3 E l 1.

j, t

s

'e

' h Slf M

CAUSE

f aV54 COMP VALVE

+

COOC COCE LUHCOflE COMPO* DENT CODE SU8 CODE SusCODE lo i I I Il FIO LEJO LA_j @ l I l N l S I T l R l U l@ LRJ@ LZJ @

t la 9

10 ti 12 13 18 l ')

2')

SE QUENil AL OCCUR R ENCE REPORT

'iEvittON

_FvfNTvfAH Hf PO*ti F40 CODE 1 (PE NO

@ l,g g u m,[8l1l

(-_ J l 01461 I/l l 01 3l lLl

[-- J LO_J

_. / I

//

73

/4

/G 2#

28 29 Ju 31 J2

'TA.'If!

'Al'i,','l,',

J! W I

"/# 'l',",?/,"

..,uns @

^s",',S, f !",'

,O,'"?.dn

'T,',,, #

.i?% "!,"A,,

?

IA__JS Lzje t_a @

L_a@

l Of of 01. 01 L_Il@

LnJO LLJ@

l xi 919I ol(

if El le s 6,

14, 41 of 43 44 47 t:Ali: F [3('.CtHP floN AND COttitECTIVE ACitoN*, h eel lin line fuse in the Esterline Anous recorder blew _during an electrical <:tnrm Tha I

Thie 4e 1

'{~QT) (fuse was replaced and the system was returned to service within 7a hnnre I

[g [ considered a random failure and no recurrence control is reautred.

I U.2 I I

U I $J l RO I

ft

't 1 A l t #"

. Pf)WE fl QTHEH $f A10$

01 COv v OtsCOVEftY DESCRiPT80N

{_j!j@ l 0l 0l 0l@l NA l

l Al@l Operator observed l

i '

As I!vs t y t,. a Ifqt 6ef i l A*.f t e AMa si fPa l sig AC 14 94 t Y L(XA f t()N OF HE LE ASE [LL' J [z_l O'69 II( Lt A'sLz_J@l NA l

l NA l

HG t

6e t

10 lI 44 4%

Pt Il'.e se taf 1 e a e*, }',us t[*;

e

  • p FAnt it 1YPF OF5(fiiPflON l

lo lo lo l@Lz.j@l NA i i

.l.s,,~,,",,,,o',io nrsCn,in,~@

,.o...,6,,

I 10 10 10181 NA i

MO is

't 11 17 t f r.% f af Ot t il AP.tAf.E 10 F Af.lll f V fVPf I sl. '.CillP TH)N I

[',Lij {Z_J@l NA Z

.o m..

I'l 8' I l' 3 l Y ff[.((* (J${ QQg y FF-I L., t1J8l'8 'Pf HJf4 ao,

)

.NA I

I I I I I I I I I I I I l :-

i.o# o PHONE:

P4 AW DI 6'Itt.P Aittit

T4.nnessee Valley Authority Form ILF 17 Itrowns Ferry Nuclear Plant BF 15.2 6/04/81 I,F.it SUPPLEMENTAL INFORMATION BHtO y3;/ 81.026 T.. lutical Specification invo!ved 3.3.I lieported Under Technical Specification 6]7.2.b, (2)

  • Date due NRC: 6/26/81 _

Date nf Occurrence _5/2Z/81 Time of Occurrence 0430 Unit 1, 2, and 3 Identification and Description of Occurrence:

Wind direction channel at 33 feet faileT(YR70-102-2).

Conditions Prior to Occurrence:

Unit I refueling outage Unit 2 modification outage Unit 3 at 100%

/etion specified in the Technical Specification Surveiuance Requirements met

.!ue to-in_ operable equipment. Describe.

Noae 3pparent Cause of Occurrence:

Wind direction channel at 33 feet - fuse blew in line to recorder during an electrical stonn.

Analypis_ of_ Qecurrence.

There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, had no resulting significant chain of events.

, Corrective Action:

Replaced fuse and the channel returned to service within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This is considered a random event and no recurrence control is required.

Failure Data:

None Hetention :

Per' d - 1.ifetime; Responsibility - Document Control Supervisor

/

  • ltevision :

P00R ORIGINAL.

l I

u. s. nun t,gn pEGULAIOH f COMM6hS40N Nn i OnM 34 6 v ril.

LICENSEE EVENT REPOl<.

consia,i ni orx L,..L.L.1._1 1

1@

ir'e^55 aa'ar oa 'vas ^u acou'ato '"'oa"^no">

l".bj {.Al L l B l R I F l 1 l@l 0 l o l-1010101010 l 1010 l@l4 h h 11 11 l@l I

l@

8 1 L N l.d'.t t ( f if)(

f4 f t, llCE NSE adt#MtstH JS 2ft gaCENSE TYPE Jo

$7 CAT se IF[.il

".'.'",;',' uj@l 0 l 510 I n 10 l215 I9 IGL'ol 512171 ai 11@l 016I 215i 8 I il@

et80'l fet d.J 6,V f N T Q ATE

4 Ps nFPonT DATE 85 0 E.81 ta l ist)CKg T Nygt
(sq or.rHIPHON AND PRotIAllLE CONI.[OtJENCES h nia I

170)) [,With, units 1 and 2 shut down, and unit 3 at 100% steady state. wind directinn channat

[,rg [ XR-90-102-2 (elevation 33 feet) failed. (See T.S. 3.3.II The wind direction channel I

I l hF'l l s common to_ units 1, _2_, and 3.

There was no dancer to the_ health nr tafoty nf tha i

j. p ] [public. Redundant. systems _wer.e,a.vajlabite. an_d_ operable There _Were_no_Dreyinu<:

I 1

j. [;.1 I similar events.

1 EG L__. --

1 [5G l. __ _. _.

suTETOE s"en M"

'i'A'#

J,"&

COoPo~E~r COoE [n t ".I I Il Fl@ W@ l A l@ l I l N I S I T l R IU_J.O L,,R_j@ [J.j @

,o a

'4 Ev tsiOPe

$E QUEN TI AL OCCURRENCE REroni f VFN7 YE AH Rf rOHY NO.

COOE fvPE NO

  • j i 01 21 61 1/1 1 01 31 lLI l-1 1 01 9 l,ii u att, L8111

'l,l;p,',

t-

/t

//

2J

/4 16 27 28 29 30 31 J2

()N A's f I frfts utjt tet s SLMi f) 8 0f

.Uli St PPttin M ANUF ACTt FtF u [a

(A__J@Lzfe 1 21 @

l_;)@

l of Ol of of LyJ@

LnJO LLJO I xi al al alG A,ff pn. I 8f 18 t*,

14 e ti dit 45 af 43 44 4p cAu:.F otr.tPtle flON AND COf tttECTIVE ACIBONS

)

durinn an plactrical <: t n rm. Tha I

[]~Jjij [In line fuse in the Esterline Anaus recorder blew Th4e 4e 1

[QT] Ifuse was replaced and the system was returned to servica within n hnnr<

1 y iconsidered a random failure and no recurrence control is reouired.

I L'.LLI I I

Iilil I Si t t l'i

'. Pf wE n OraEH 5 8 A tu':

i Ov HV DISCOVEnv DESCHiPTION It l'I W @ l Q 01 0l @ l NA l

l Al@l Operator observed I

",,nNi n. Acuvie v @ l tocA noN or HEtt Asc @

Al.'nvo v... 'r'! : r N

~'

l Au ni t m.i n... n tr.vr NA l

NA h,j[Z_j@11@!

PinnN,A"..ns'l.<s nrstnPriON@

I youni n tyPr 101010l@LZj@l NA

' i P,,,en,,,.. ". n !. fit s ne seniP ne,N@

W l0 10 lOl@l NA maan ansasts a I l

no...o o 6"d-e PUUK UMihilut.

l 8 L..ZJ @ l NA

,o

]

NA i

1111liittiil15 g

,t sj g 6ttg* f H Pd 8 LN_jh),64 G8 69 40 i i

se

's 18e PHONE.

NAMI: Of Pf tLi'Af tEli

3

,a Tt nnessee Valley Authority Form itF 17 hiowns 1/erry Nuclear Plant BF 15.2 6/04/81 1.F.it SUI'PLF. MENTAL, INI'Of!M ATIOd hHto-50 _259. / 81.026 Tc. hnical Specifica i. n invoNed 3.3.I 6/26/81

- Heported Under Technical Specification 6 L2.b, (2)
  • l) ate due NRC:

Date of Occurrence _5/2Z/81 Time of Occurrence 0430 Unit 1, 2, and 3 Wind direction channef al. ption of Occurrence-33 feet' fillet (XR90-102-2).

Identification and Descri Conditions Prior to Occurrence:

Unit 1 refueling ou*. age Unit 2 modification outage Unit 3 at 1001, Action specified ' n the Technical Specification SurveiUance Requirements met u

.!ae to inopgable equipment.

Describe.

None

, Apparent Cause of Occurrence:

Wind direction channel at 33 feet - fuse blew in line to recorder during an electrical stonn.

Analyt.is_ of Qecurrencq.

There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, and no resulting significant chain of events.

Co,rrective Action:

This is Replaced fuse and the channel returned to service within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

considered a random event and no recurrence control is required.

F_ailure Data:

None Hetentio.n :

Per' d - I.ifetime; Responsibility - Document Control Supervisor

  • Revision :

P00R ORIGINAL