05000259/LER-1981-003-01, /01T-0:on 810124,Div of Engineering Notified That 1-inch Vent Line on Unit 1 Scram Discharge Vol Not Seismically Qualified.Caused by Piping Configuration Not Conforming to Design Requirements

From kanterella
(Redirected from ML20003B202)
Jump to navigation Jump to search
/01T-0:on 810124,Div of Engineering Notified That 1-inch Vent Line on Unit 1 Scram Discharge Vol Not Seismically Qualified.Caused by Piping Configuration Not Conforming to Design Requirements
ML20003B202
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/04/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003B198 List:
References
LER-81-003-01T, LER-81-3-1T, NUDOCS 8102100509
Download: ML20003B202 (2)


LER-1981-003, /01T-0:on 810124,Div of Engineering Notified That 1-inch Vent Line on Unit 1 Scram Discharge Vol Not Seismically Qualified.Caused by Piping Configuration Not Conforming to Design Requirements
Event date:
Report date:
2591981003R01 - NRC Website

text

-

N.RC FO*4M 366 U.S. NUCLEAR REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT 9

CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) i e

[ETil l A l L l B l R l F l 1 l@160 l0 ! - 1010 l 010 l 0 l-l0 l 0 l@l4 Il li l1 l 1 l@l l

l@

7 8 9 UCENSEE CODE 14 UCENSE NUMBER 2$

26 LICENSE TYPE JO 57 CAT 58 corri lol1l 3c[,C l X l@l 0 l 5 l 0 l 0 l0 l 2 l 5 l 9 @l 011 l 2 l4 l 8 l1 hl Ol 2l 0l 4l 8] 1l@

7 8

60 61 DOCKET NUMSER 68 69 EVENT DATE 74 7b REPORT DATE 80 EVENT OESCRIPTION AND PROO A8t F CONSEQUENCES h 10121 lDuring normal operatton the plant received notification from TVA's Divisinn of l

I o i 3 I I Engineering Design that the one inch vent line on unit 1 scram discharne volume was I

10 l 4 ] l not seismically qualified based on analysis resulting from NRC IE Bulletin 79-14 l

loIsI ; 5 Pection data. Reference FSAR Chapter 12.

No significant resulting events. No l

1016 I I danger to health or safety of public. No previous occurrences.

l l0l7ll l

I ioull 80 7

8 3 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SU8 CODE COMPONENT CODE SUSCODE SUSCODE lol9l l R I B l@ l Bl@ lC l@ l Zl Zl Zl Zl Zl Zl@ W@ W @

7 8

9 10 11 12 IJ 18 19 20 SEQU E NTI AL OCCURRENCE REPORT REVISION LE R. R O EVENTVEAR REPORT NO.

CODE TYPE N O.

@,RgOg l218 l 1l l-l l 0l 0l 3l l/l l0l1l lT l

[--J W

22 23 24 26 27 N

a 30 31 32 T As-A ON O PLANT MET MOURS S8 iT FOR S.

SUPPL R MAN FACTURER lF lg]34 Zl@

l Zl@

l Zl@

l0l0l0l0l W@

l N ]@

l Zl@

l Z l 9 l 9 l 9l@

33 36 36 37 40 41 42 43 44 47 CAUSE OESCRIPTION ANO CORRECTIVE ACTIONS lilollThe as-constructed piping configuration did not conform to design requirements.

l [i1,j l Seismic restraints were installed on the one inch vent line. This put the system I

,,,, i j in a " minimum potential for pressure boundary failure" category.

l li l il l I

Ii la i A

4 3 80

's'r"A' Els" OTwERsTATus h NOORv' oiSCOvERv oESCRiPTiON 032 sPOweR NA l

l D lgl Notified by Engineering Design l

I i l'a j l E l@ l 0l 7 l 4 lgl AC TIVI ry CON T E N T nfLEASED N 83ELEASE AMOUNT OF ACTIVITV LOCATION OF RELEASE NA l

l NA l

li !s 1 LzJ @ LZJ@l i

7 8 9 _

10 11 44 45 80 PE8450NNEL f FPOSURES NiWitE R TvPE DESCmPT10N l

117110l0l0l@lZl@l NA l

l PSnsowEi,J,ES oESCniPtioN@

Nimu R li l-1 10 l 010 l@l NA l

4 1

li 12 30 LOW OF CH Da*AAGE To F ACillTV fYPE OESCniPrioN NA l

W Izl@l i

l i

4

'J 79 30 l

  • %Ht ill f Y NRC USE ONLY oE scmPtiON

.,.r y !

l ll!!!!!!!!!

k h

l 7

a

'J sq 68 69 80 $

o NAVE OF PHEPARER PH AN E:

i 8102 LQofQj

i Tenne see Valley Authority smrm DF-17 Brc,wn:, Ferry Nuclear Plant BF 10. 2 1/10/79 LER SUPPLEMENTAL INFORMATION BFitO 259 / 81003 Technical Specification involved Nond - IE Bulletin 79-14 Reported Under Technical Specification

6. 7. 2.a(9)

Date of Occurrence 1/24/81 Time of Occurrence 1500 Unit 1

l Identification and Description of Occurrence:

j The plant received notification from TVA's Division of Engineering Design that the one inch vent line on Unit 1 scram discharge volume was not semismically qualified.

This was based on analysis resulting from NRC IE Bulletin 79-14 inspection data.

Condit_ ions ' Prior to Occurrence:

Unit 1 at 75%

Unit 2 at 95%

Unit 3 at 80%

Action specified in the Technical Specification Surveillance Requirements met due te inoperable equipment. Describe.

NA

, pgrgt Cause of Occurrence:

3 The as-constructed piping configuration did not conform to design requirements.

l Analv.is of Occurrence:

There was no damage to plant equipment. There was no activity release, no personnel exposure or injury and no danger to the health or safety of the public.

Corrective Action

Three additional supports were added to the CRD scram discharge header vent lines putting the system in a " minimum potential for pressure boundary failure" category.

Failure Data:

NA

  • R tention:

Period - Lifetime; Responsibility - Administrative Superviser i

  • Revision: W

.c m