05000259/LER-1980-078-03, /03L-0:on 801012,Tech Spec Limit of 13.32 Kw/Ft for Linear Heat Generation Rate Exceeded in Two Nodes.Caused by long-term Xenon Transient Following Preconditioning Ramp. Control Rod Insertion Restored Operation

From kanterella
(Redirected from ML20002A762)
Jump to navigation Jump to search
/03L-0:on 801012,Tech Spec Limit of 13.32 Kw/Ft for Linear Heat Generation Rate Exceeded in Two Nodes.Caused by long-term Xenon Transient Following Preconditioning Ramp. Control Rod Insertion Restored Operation
ML20002A762
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/10/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20002A761 List:
References
LER-80-078-03L-01, LER-80-78-3L-1, NUDOCS 8011210485
Download: ML20002A762 (2)


LER-1980-078, /03L-0:on 801012,Tech Spec Limit of 13.32 Kw/Ft for Linear Heat Generation Rate Exceeded in Two Nodes.Caused by long-term Xenon Transient Following Preconditioning Ramp. Control Rod Insertion Restored Operation
Event date:
Report date:
2591980078R03 - NRC Website

text

n~U e.o

.n.

(7 77)

LICENSEE EVENT REPORT coNTHot eLOce l I

l l

I

<PLE AsE ralNT OM TYPE ALL REOutRED INFORMATIONI 1

6 l Al Ll Bl Rl Fl 1 l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l - l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@l s,s.,

g l

l o i ouN. con.

i4 i.

oa Nu No.,.

n o u Ns. n,. 20 CON'f 8

"',T,'."" LLJ@l 01 5101010121 s 19 @l i l o l i l 21 s l o l@li l i li f o l s lo l@

3 60 61 DOCK ET Nuo6tR

.A 6'J LVENT OAfg is 7S HgeoRToATE 80 s

LvENT DESCHIPTION AND PROBABLE CONSEQUENCES h l During preconditioning operations, the technical specification limit of 13.32 Kw/f t

[

o 2 f or linear heat generation rate was exceeded in two nodes (T.S.3.5.J).

The nodes g

gi Previous events: 50-259/8053 and 50-259/8056. There was no j

g g reached 13.52 Kw/ft.

! g g effect on the public health or safety and no resulting significant chain of events.

l 1

0 6 l

I ITTil I I

o e I WO DE C005 SueC E CouroNENT CODE St, CODE 5

DE 12121@ LaJ@ La.JG I 21 zl zl 21 zl zl@ LzJ@ LzJ @

o 9 r

a 9

to is 11 12 in 19 20 S E Out Nil A L.

OCCUR RE NCE REPORT REV858oN

. EVENTvtAR Rt PORT No CODE TvPt No 6 ;g g s, ng3'";;"

_l 810 i L-J 101718 l 1/1 1 01 31 W

L---J W

u n

u v

si v

u n

4 a

AK N A TO GN PL NT IT 0 HQUR$ 22

$8 1T Fo u

SLPet E 4 N FA LRin l X l@[z_j@

W@

[ z,J@

l0 l0 l0 lu l y@

[Njg ]@

lZ l 9 l 9 l9 lt 13 34 35 36 Ji 40 46 42,

43 44 41 cAuSE CESCRIPTION AND CORRECTIVE ACTIONS l i i c ! i Following a preconditioning ramp of 10 MWe/hr., a long term xenon transient caused l

i the LHCR limits to be exceeded in two nodes. Control rod insertion was used to I

1 i

g l restore operation within LHGR limits. The resulting LHGR was measured to be 12.18 i

g l Kw/ft. Recurrence control is being studied.

l l

E, I

a,

$1A '

%PowtR OTHER$TATUS Dis o RY betCovtRY DESCuiPTION NA l

y gl Operator observativa l

J@ l 0 l 9 l 0 l@l i s Aoou~To,Acuvin @ l toCAfiaN o, R uA3 @

AC TIVI T v CO TENT L.LLs ] L.z] @o o,Riuis.Lz.J@l R u Asi NA l

NA l

,e nu.d*t, 4,osh oisCHi.noN @

Nuo.

n, I

E I cl ni ol@L2J@l NA o.sv.~.l' N>c'Rics oisCR. Tion @

~uo o.

I 8, Iniolal@l NA 80 4

'J t1 I?

L OSS OF OR DA AGE TO F Actu rv i dr ut sCRiPisON I

L.:dGI NA

,o

~~ m'v

,m.,',""t','!C,...,,0N @

NA I

II Illilill t i li LtJ81 2 o 68 69 80 ;

i si s ut t

8 OF PmEPAHEH PHON E:

- 80 L't 91 NA

~

.e Tennessee Valley Authority Fonn BF-17 Browns Ferry Nuclear Plant BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION BFRO 259 /

8078 Technical Specification Involved 3.5.J Reported Under Technical Specification

6. 7. 2. b( 2)

Date of Occurrence 10/12/80 Time of Occurrence 0100 Unit 1

Identification and Description of Occurrence:

The technical specification' limit of 13.32 Kw/ft for LHCR was. exceeded for two nodes. The nodes reached 13.52 Kw/ft.

Conditions' Prior to Occurrence:

Unit 1 at 98% power Unit 2 refueling Unit 3 at 99% power Action specified in the Technical Specification Surveillance Requirements met due to inoperable equipment. Describe.

NA Apparent Cause of Occurrence:

A slow long term xenon transient caused by preconditioning flow increase. _

Analysis of Occurrence:

There was no damage to plant equipment. There was*no activity release, no personnel exposure or injury and no. danger to the health.or safecy of the public.

Corrective Action

The rod group closest to the limiting location was inserted from position 1

40 to.36.

~

Failure Data:

50-259/8053 and 50-259/8056.

~

  • Retention:

eriod - Lifetime; Responsibility - Administrative Supervisor

  • Revision:

o.