ML19354C395

From kanterella
Jump to navigation Jump to search
Forwards LER 80-064/03L-1
ML19354C395
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/01/1980
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19345D332 List:
References
L80-2599, NUDOCS 8012120501
Download: ML19354C395 (1)


Text

~

C ) TOLEDO tra EDISON December 1, 1980 L80-2599 FILE: RR 2 (NP-33-80-74)

Docket No. 50-346 '?' (S r License No. NPF-3 " o S N, .3 Mr. James G. Keppler _] -: Qp; Regional Director, Region III fl g%

Office of Inspection and Enforcement Q,qS 2 g U. S. Nuclear Regulatory Commission gj [ $g N  ::2 Pi 799 Roosevelt Road G A E Glen Ellyn, Illinois 60137 u

Dear Mr. Keppler:

Enclosed are three copies of Licensee Event Report 80-064 and supplemental informa-in tion which has been revised. The revisions to the report are indicated by a "1" the left margin of each page.

Please destroy your previous copies of this T,ER and replace with the attached revision.

Yours truly,

(

I c'^^5 g G o

- a .

- Terry D. Murray .

Station Superintendent Davis-Besse Nuclear Power Station TDM/ljk Enclosure cc: Mr. Victor Stello, Jr., Director Office of Inspection aid Enforcement '

' Enc 1: 30 copies Mr. Norman Haller, Director Office of Management Program Analysis Encl: 3 copies Mr. Luis Reyes NRC Resident Inspector i Encl: 1 copy 6 ,

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE- LEGO OHIO 43652 J - SRL . _ . _ _

. . _ _ _._ .__