LER-1981-013, /03L-0:on 810424,Athens 161 Kv Line Tripped & Cooling Tower Transformer 1 de-energized.Caused by Rolled Current Transformer Leads B & C for Breaker 1928.Lead B in Breaker 1922 Loose.Rolled Leads Corrected |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2591981013R03 - NRC Website |
|
text
9 rO M ass u. S. NUCLEA3 REGULATORY COMMISSION v"
LICENSEE EVENT REPORT CONTROL RLOCK: l l
l l
l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
~
a 6
l0 l 1 l l Al Ll Bl Rl Fl 1l@l0 l0 l-l0 l0 l0 l0 l0 l-l0 l0 l@l 4 l 1l 1l 1l 1l@
l l@
7 8 9 LICENSEE CODE 14 16 LICENSE NUMBEH 2b 16 LICENSE TYPE JO Si GAT $8 CON'T IoIil
'%,"CE [LMl o l 5 10 l 0 10 l 2 l 5 l9 @l Ol 4l 2l 4l 8I 1l@l0 l 5l1 l O' _8l 1l@
S 7
8 60 61 DOCKET NUMB ER 68 69 EVENT DATE 34 75 REPORT DATE 80 EVENT DESCRIPTION AND PROSABLE CONSEQUENCES h 10121 lWhen cooline tower switcheear "D" was transferred to normal feed breaker 1928 for
[
1013] leurrent transformer wsing check as part of investigation for LER number BFRO l 1014 l 1259M1012. Athens l61 kv line tripped and cooling tower transformer 1 deenergized I
l o I S I l bv operation of "B" dif ferential relav (BDD 187 CT).
See T.S. 3.9.B.1.
Diesel l
1oI6I lgenarntors 1A. 1B. 3C. and 3D vere operable. There was no danger to the health or l
l0l7I ianfaty of the oublic.
Previous similar events
BFRO-50-259/8059, 81012.
I I o !R1 l l
7 8 9 80 SYSTEV
CAUSE
CAUSE COMP.
VALVE CODE CODE SU8 CODE COMPONENT CODE SUSCODE SUSCODE lo191 lElAlh W h lZlh IZlZlZIZIZIZlh W h IZlh i
8 9
10 11 12 13 18 19 20 SEQUE NTI A L OCCURRENCE REPORT REVISION LER RO EVENT YEAR REPORT NO.
CODE TYPE N,
@,agg I al ll 1-1 1011131 1/l 10131 lLI l-l L_J 21 22 23 24 26 27 28 29 30 31 32 T K N A ON ON PLANT M
HOURS 22 S8 i FOR S.
SU LE MANLFACTURER lBl@ W @
lZl@
l Zlh l 0 l0 l 0 l 0 l l Yl@
l Nlg
]g l zl 9l 9l 9lg 33 34 J5 36 31 40 di 42 43 44 41 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS l
l i ! o l l "B" phase current transformer lead (lTC2) and "C" phase current transformerlead(1CTO))
l Iiii1 !were found roll'ed for breaker 1928. A "B" phase current transformer connection
[
t iii31 lwas also discovered loose in normal feed breaker 1922 for 4 kv cooling tower switch- ;
y l gear A.
The loose connection was tightened and rolled leads were corrected.
(See l
I i 141 l attachment).
I l
I a 9 80 STI S
% POWER OTHER STA TUS DIS av OISCOVERY OESCRIPTION lt l'> l Wh l 0 l 0 l 0 l@l NA l
fn Ql Operator observed l
Adrne r < o$ rt N T 4
nF LFASCD of HL LE Mi' AMOUN I OF ACTivi rv Los 4 TION oF RELE ASE D.,,j6_J 1 zJ @ La.J@l NA l
l NA l
PERSON ~EL nPOsSES NUMMEM CESCRIPTiON lI i / l l Ol 0l Olh[ TYPE _Z_j@l NA l
NuMN E H O E SCRIP TION li g, j l 0l 0[ 0lgl l
NA 4 1 le 12 go L(fjS OF OR UAMAGE TO FACILITY rYPE DE SCHiP rsoN I i I,I L,.ZJ@l NA i
m g*;*,gg {
E S( HIPTION I e i n1 L. jj@l NA l
ll llllllfIl l l,'
in
.. a in NAYt OF PHEPAHHf PHONE 8105200471
Tennessee Valley Authority Form BF-17 Browns Ferry Nuclear Plant BF 15.2 3/24/81 LER SUPPLEMENTAL INFORMATION BFRO ?59 /, 81013 Technical Specification Involved 3.9.B.1 (U2) (U3)
Reported Under Technical Specification
- 6. 7. 2.b (2)
Date of Occurrence 4/24/81 Ti.ne of Occurrence 1520 Unit 0
Identification and Description of Occurrence:
Returning CT switchgear "D" to service, when ACB 1928 was closed it tripped the Athens 161 kV line.
Conditions Prbr to Occurrence:
r Unit 1 rein.,iing outage.
thit 2 at 99%
thit 3 at 91%
l l
Action specified in the Technical Specification Surveillance Requirements met gue to inoperable equipment. Describe.
Isolated CT transformer switchgear D-U-3 D/G SI's already completed. Unit 1 and 2 diesel generator SI's were not performed (Reference BFRO-50-259/81017).
l l
l ppi arent Cause of Occurrence:
"B" phase current transformer lead (1TC2) and "C" phase transformer lead (ICT03) l were rolled for breaker 1928. The "B" phase current lead in breaker 1922 was l
also loose. Current transformer leads have apparently been rolled since construction.
Analysis of Occurrence:
There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, and no resulting significant chain af events.
l l
Corrective Action
"B" and "C" phase current transformer leads were rs J ed for breaker 1928. The loose "If' phase lead on breaker 1922 was tightened. The correct phasing of current transformer for cooling tower transformer 1 breakers 1922, 1924, and 1928 was verified. This is considered random failure, however, phasing of current trans-formers 1920, 1916, 1918, 1930, 1912 and 1914 will be verified during the next extended unit 2 outage.
Failure Data BFRO-50-259/8059, 81012.
~
- Retention : Period - Lifetime; Responsibility - Document Control Supervisor
~
\\
w--
--,.y,, - -
9
.,s
,-97
,-,w q----
3mv.---
w
.-.~w-y
=g
--y-----
=
w w
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000260/LER-1981-001, Forwards LER 81-001/01T-0 | Forwards LER 81-001/01T-0 | | | 05000260/LER-1981-001-01, /01T-0:on 810102,scram Discharge Vol Level Switch 2-LS-85-45A Found Inoperable & -C & -D Found Offscale.Caused by One Robert Shaw Switch Model SL-305-EI-X Sticking & Setpoint Drift.Stuck Switches Float Chamber Back Flushed | /01T-0:on 810102,scram Discharge Vol Level Switch 2-LS-85-45A Found Inoperable & -C & -D Found Offscale.Caused by One Robert Shaw Switch Model SL-305-EI-X Sticking & Setpoint Drift.Stuck Switches Float Chamber Back Flushed | | | 05000259/LER-1981-001, Forwards LER 81-001/03L-0 | Forwards LER 81-001/03L-0 | | | 05000296/LER-1981-001, Forwards LER 81-001/03L-0 | Forwards LER 81-001/03L-0 | | | 05000296/LER-1981-001-03, /03L-0:on 810106,both Smoke Detectors in Reactor Bldg Fixed Spray Zone Were Inoperable.Caused by Loose Screw in Terminal Block.Screw Replaced | /03L-0:on 810106,both Smoke Detectors in Reactor Bldg Fixed Spray Zone Were Inoperable.Caused by Loose Screw in Terminal Block.Screw Replaced | | | 05000259/LER-1981-001-03, /03L-0:on 810105,core Spray Sparger to Reactor Pressure Vessel D/P Switch 1-PDIS-75-28 Found Set Above Tech Spec Limit.Caused by Barton Model 288 Setpoint Drift.Switch Replaced W/New Switch on 810115 | /03L-0:on 810105,core Spray Sparger to Reactor Pressure Vessel D/P Switch 1-PDIS-75-28 Found Set Above Tech Spec Limit.Caused by Barton Model 288 Setpoint Drift.Switch Replaced W/New Switch on 810115 | | | 05000260/LER-1981-002-03, /03L-0:on 810102,scram Discharge Instrument Vol Rod Block Level Switch 2-LS-85-45E Found Set at 27 Gallons. Alarm Switch 2-LS-85-45F Found Inoperable.Caused by Drift of Robertshaw Model SL-305-EI-X.Switch Recalibr | /03L-0:on 810102,scram Discharge Instrument Vol Rod Block Level Switch 2-LS-85-45E Found Set at 27 Gallons. Alarm Switch 2-LS-85-45F Found Inoperable.Caused by Drift of Robertshaw Model SL-305-EI-X.Switch Recalibr | | | 05000296/LER-1981-002-03, /03L-0:on 810104,excess Flow Check Valves in B3 & B7 Instrument Lines to Panel 25-7 Would Not Restrict Flow Properly.Cause Not Stated.Internals Changed & SI 4.7.D.1.d Successfully Completed | /03L-0:on 810104,excess Flow Check Valves in B3 & B7 Instrument Lines to Panel 25-7 Would Not Restrict Flow Properly.Cause Not Stated.Internals Changed & SI 4.7.D.1.d Successfully Completed | | | 05000259/LER-1981-002, Forwards LER 81-002/03L-0 | Forwards LER 81-002/03L-0 | | | 05000259/LER-1981-002-03, /03L-0:on 810114,smoke Detector in Relay Room Alarmed & Would Not Clear.Caused by Detector Sensitivity Increasing Due to Normal,Natural Aging.Detector Replaced & Tested | /03L-0:on 810114,smoke Detector in Relay Room Alarmed & Would Not Clear.Caused by Detector Sensitivity Increasing Due to Normal,Natural Aging.Detector Replaced & Tested | | | 05000296/LER-1981-002, Forwards LER 81-002/03L-0 | Forwards LER 81-002/03L-0 | | | 05000260/LER-1981-002, Forwards LER 81-002/03L-0 | Forwards LER 81-002/03L-0 | | | 05000260/LER-1981-003-03, /03L-0:on 810112,core Spray Pump Discharge Pressure Switch 2-PS-75-16 Found Outside Tech Spec Limits. Caused by Setpoint Drift.Switch Recalibr & Replaced | /03L-0:on 810112,core Spray Pump Discharge Pressure Switch 2-PS-75-16 Found Outside Tech Spec Limits. Caused by Setpoint Drift.Switch Recalibr & Replaced | | | 05000259/LER-1981-003-01, /01T-0:on 810124,Div of Engineering Notified That 1-inch Vent Line on Unit 1 Scram Discharge Vol Not Seismically Qualified.Caused by Piping Configuration Not Conforming to Design Requirements | /01T-0:on 810124,Div of Engineering Notified That 1-inch Vent Line on Unit 1 Scram Discharge Vol Not Seismically Qualified.Caused by Piping Configuration Not Conforming to Design Requirements | | | 05000259/LER-1981-003, Forwards LER 81-003/01T-0 | Forwards LER 81-003/01T-0 | | | 05000260/LER-1981-003, Forwards LER 81-003/03L-0 | Forwards LER 81-003/03L-0 | | | 05000296/LER-1981-003, Forwards LER 81-003/03L-0 | Forwards LER 81-003/03L-0 | | | 05000296/LER-1981-003-03, /03L-0:on 810107,during Refueling Outage,Fuel Pool Cooling Sys Auto Isolated When Power Was Removed.Fuel Pool Sampling Not Performed on 8-h Schedule.Caused by Personnel Error.Personnel Reinstructed | /03L-0:on 810107,during Refueling Outage,Fuel Pool Cooling Sys Auto Isolated When Power Was Removed.Fuel Pool Sampling Not Performed on 8-h Schedule.Caused by Personnel Error.Personnel Reinstructed | | | 05000260/LER-1981-004-01, /01T-0:on 810119,reactor Water Level Switches LIS-3-203A Switch 1 & LIS-3-A,B,C,D Switch 2 Found Outside Tech Specs.Caused by Drift Due to Air Impact Drilling Next to Switch Panel.Switches Recalibr | /01T-0:on 810119,reactor Water Level Switches LIS-3-203A Switch 1 & LIS-3-A,B,C,D Switch 2 Found Outside Tech Specs.Caused by Drift Due to Air Impact Drilling Next to Switch Panel.Switches Recalibr | | | 05000296/LER-1981-004-03, Diesel Generator 3A & Breaker 1836 Tripped from Generator Overspeed During Testing.Caused by Vs Relay on Speed Sensing Panel Energizing at Less than 870 Rpm,Closing Breaker 1836 | Diesel Generator 3A & Breaker 1836 Tripped from Generator Overspeed During Testing.Caused by Vs Relay on Speed Sensing Panel Energizing at Less than 870 Rpm,Closing Breaker 1836 | | | 05000296/LER-1981-004, Forwards Updated LER 81-004/03X-1 | Forwards Updated LER 81-004/03X-1 | | | 05000259/LER-1981-004, Forwards Updated LER 81-004/03L-1 | Forwards Updated LER 81-004/03L-1 | | | 05000259/LER-1981-004-03, Standby Gas Treatment Sys Train C Relative Humidity Heaters Declared Inoperable.Caused by Dwyer Photohelic Pressure Switch/Gage Circuit Hh & Ite Imperial Relay Contact Block Malfunction | Standby Gas Treatment Sys Train C Relative Humidity Heaters Declared Inoperable.Caused by Dwyer Photohelic Pressure Switch/Gage Circuit Hh & Ite Imperial Relay Contact Block Malfunction | | | 05000260/LER-1981-005-03, /03L-0:on 810119,core Max Fraction of Limiting Power Density Exceeded Limit for One Node in Core.Caused by Operation Close to Limit in Conjunction W/Minor (Normal) Perturbation in Monitored Parameters.Power Reduced Slightly | /03L-0:on 810119,core Max Fraction of Limiting Power Density Exceeded Limit for One Node in Core.Caused by Operation Close to Limit in Conjunction W/Minor (Normal) Perturbation in Monitored Parameters.Power Reduced Slightly | | | 05000259/LER-1981-005-04, /04T-0:on 810131,hydrogen Ion Concentration of Reservoir Near Plant Found in Excess of Allowable Discharge Limit.Probably Caused by Upstream Source.Discharge of Spent Regenerants Stopped & Monitoring Program Established | /04T-0:on 810131,hydrogen Ion Concentration of Reservoir Near Plant Found in Excess of Allowable Discharge Limit.Probably Caused by Upstream Source.Discharge of Spent Regenerants Stopped & Monitoring Program Established | | | 05000296/LER-1981-005-03, /03L-0:on 810127,containment Atmosphere Hydrogen analyzer,3-H2M-76-94,removed from Svc.Caused by Maint on Sensing Line at 3-FIC-76-94,Model 1350,due to Water Collection.Water Removed & Lines Returned to Svc | /03L-0:on 810127,containment Atmosphere Hydrogen analyzer,3-H2M-76-94,removed from Svc.Caused by Maint on Sensing Line at 3-FIC-76-94,Model 1350,due to Water Collection.Water Removed & Lines Returned to Svc | | | 05000296/LER-1981-005, Forwards LER 81-005/03L-0 | Forwards LER 81-005/03L-0 | | | 05000260/LER-1981-005, Forwards LER 81-005/03L-0 | Forwards LER 81-005/03L-0 | | | 05000259/LER-1981-005, Forwards LER 81-005/04T-0 | Forwards LER 81-005/04T-0 | | | 05000259/LER-1981-006, Forwards LER 81-006/03L-0 | Forwards LER 81-006/03L-0 | | | 05000259/LER-1981-006-03, /03L-0:on 810211,while Performing SI 4.2.B-57,RHR Area Cooling Fan Temp Switch 1-TS-64-68 Failed to Operate. Caused by Switch T675A1540 Failure.Switch Replaced,Calibr & 4.2.B-57 Completed | /03L-0:on 810211,while Performing SI 4.2.B-57,RHR Area Cooling Fan Temp Switch 1-TS-64-68 Failed to Operate. Caused by Switch T675A1540 Failure.Switch Replaced,Calibr & 4.2.B-57 Completed | | | 05000296/LER-1981-006-03, /03L-0:on 810128,containment Atmosphere Hydrogen Analyzer Removed from Svc.Caused by Maint on Sensing Lines Due to Effect of Water Accumulation on Model 76-01A625 Timer.Water Removed & Monitor Returned to Svc | /03L-0:on 810128,containment Atmosphere Hydrogen Analyzer Removed from Svc.Caused by Maint on Sensing Lines Due to Effect of Water Accumulation on Model 76-01A625 Timer.Water Removed & Monitor Returned to Svc | | | 05000296/LER-1981-006, Forwards LER 81-006/03L-0 | Forwards LER 81-006/03L-0 | | | 05000260/LER-1981-006-03, /03L-0:on 810121,core Max Fraction of Limiting Power Density Exceeded Limit.Caused by Power Increase in Conjunction W/Inoperable Process Computer.Power Reduced & Control Rod Pattern Adjustment Made on 810123 | /03L-0:on 810121,core Max Fraction of Limiting Power Density Exceeded Limit.Caused by Power Increase in Conjunction W/Inoperable Process Computer.Power Reduced & Control Rod Pattern Adjustment Made on 810123 | | | 05000260/LER-1981-006, Forwards LER 81-006/03L-0 | Forwards LER 81-006/03L-0 | | | 05000260/LER-1981-007-03, /03L-0:on 810129,during Power Increases,Tech Spec Limit of 13.33 Kw/Ft for Linear Heat Generation Rate Exceeded in One Node.Node Reached 13.77 Kw/Ft.Caused by Xenon Transient Resulting from Increased Core Power | /03L-0:on 810129,during Power Increases,Tech Spec Limit of 13.33 Kw/Ft for Linear Heat Generation Rate Exceeded in One Node.Node Reached 13.77 Kw/Ft.Caused by Xenon Transient Resulting from Increased Core Power | | | 05000260/LER-1981-007, Forwards LER 81-007/03L-0 | Forwards LER 81-007/03L-0 | | | 05000259/LER-1981-007, Forwards LER 81-007/03L-0 | Forwards LER 81-007/03L-0 | | | 05000259/LER-1981-007-03, /03L-0:on 810210,during Fire Door Insp,Fire Door Damper (Door 472) Not Closed.Caused by Paint Buildup in Operating Mechanism.Damper Closed & Other Dampers Inspected. Procedure for Insp & Preventive Maint Will Be Written | /03L-0:on 810210,during Fire Door Insp,Fire Door Damper (Door 472) Not Closed.Caused by Paint Buildup in Operating Mechanism.Damper Closed & Other Dampers Inspected. Procedure for Insp & Preventive Maint Will Be Written | | | 05000296/LER-1981-007-03, /03L-0:on 810202,setpoint for 3-PS-1-76 Below Tech Specs Limit.Caused by B2TA12SS Setpoint Drift.Switch Recalibr & Verified.Switch to Be Replaced W/Analog Trip Sys by DCR 1398 | /03L-0:on 810202,setpoint for 3-PS-1-76 Below Tech Specs Limit.Caused by B2TA12SS Setpoint Drift.Switch Recalibr & Verified.Switch to Be Replaced W/Analog Trip Sys by DCR 1398 | | | 05000296/LER-1981-007, Forwards LER 81-007/03L-0 | Forwards LER 81-007/03L-0 | | | 05000260/LER-1981-008-03, /03L-0:on 810220,reactor Core Isolation Cooler Turbine Trip & Throttle Valve Closed & Would Not Reopen. Caused by Overload Heater Relay.Relay Replaced | /03L-0:on 810220,reactor Core Isolation Cooler Turbine Trip & Throttle Valve Closed & Would Not Reopen. Caused by Overload Heater Relay.Relay Replaced | | | 05000259/LER-1981-008-01, /01T-0:on 810226,secondary Containment Integrity Lost When Exterior Equipment Access Door 229 & Interior Personnel Door 228 Opened Simultaneously.Caused by Lack of Interlocks Between Doors.Interlocks to Be Installed | /01T-0:on 810226,secondary Containment Integrity Lost When Exterior Equipment Access Door 229 & Interior Personnel Door 228 Opened Simultaneously.Caused by Lack of Interlocks Between Doors.Interlocks to Be Installed | | | 05000296/LER-1981-008-03, /03L-0:on 810202,RHR Pump Found Inoperable.Caused by Loose Pump 3D Breaker Trip Adjustment Nut & Adjustment Change,Causing Breaker to Trip Free on Attempting to Close. Breaker Replaced.Adjustment Locknut Tightness Checks Add | /03L-0:on 810202,RHR Pump Found Inoperable.Caused by Loose Pump 3D Breaker Trip Adjustment Nut & Adjustment Change,Causing Breaker to Trip Free on Attempting to Close. Breaker Replaced.Adjustment Locknut Tightness Checks Added | | | 05000296/LER-1981-008, Forwards LER 81-008/03L-0 | Forwards LER 81-008/03L-0 | | | 05000259/LER-1981-008, Forwards LER 81-008/01T-0 | Forwards LER 81-008/01T-0 | | | 05000260/LER-1981-008, Forwards LER 81-008/03L-0 | Forwards LER 81-008/03L-0 | | | 05000296/LER-1981-009, Forwards LER 81-009/03L-0 | Forwards LER 81-009/03L-0 | | | 05000259/LER-1981-009, Forwards LER 81-009/01T-0 | Forwards LER 81-009/01T-0 | | | 05000260/LER-1981-009, Forwards LER 81-009/03L-0 | Forwards LER 81-009/03L-0 | |
|