ML19345C806

From kanterella
Jump to navigation Jump to search
Forwards LER 80-082/03L-1
ML19345C806
Person / Time
Site: Pilgrim
Issue date: 12/01/1980
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19345C807 List:
References
80-300, NUDOCS 8012080409
Download: ML19345C806 (1)


Text

.

s. .m m lu 3 *
  • uC:.2AJ F~ C . / ; a E n ,L:.

p <.a_ . ._ _: . , r. , ; ; a ., ;

December 1, 1980

".2 '

>m. BEco Ltr. #80-300

?

~2 Director, Region 1 gj

'3 Of fice of Inspection and Enforcement ,

U. S. Nuclear Regulatory Commission i;;

l, 631 Park Avenue King of Prussia, PA 19406 ,

a q

Licensee Event Report 80-08e/03L-1 s

[]

Docket Number 50-293 []

License DPR-35 Gentlemen:

The attached Licensee Event Report 80-082/03L-1, "480V Bus-B15", is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power S tation Technical Specification 6.9.B.2.b .

Revision zero of this LER dealt with the operation of Valve 1001-34 B .

Shnagement review indicated that automatic operation of 10 1001-34B was not impaired therefore this report was superfluous. This LER on operation of 480V BUS-B15 utilizes the original reports sequential designation and replaces the original report.

If there are any questions on this subject, please contact us.

Res-' efully submit ed, R. D. Mac. n Nuclear Operations Manager 711 grim Station MTM:ep

Enclosures:

(3 copies)

LER 80-082/03L-1 cc: Director (40 copies)

Of fite of Management Information and Program Control U. S . Nuclear lagulatory Commission Washington, D.G. 20555 0022080