05000259/LER-1980-092-03, /03L-0:on 801230,standby Gas Treatment Train C Relative Humidity Heaters Did Not Function Properly.Caused by Open TE-65-60B Switch.Switch Repaired

From kanterella
(Redirected from ML19341B306)
Jump to navigation Jump to search
/03L-0:on 801230,standby Gas Treatment Train C Relative Humidity Heaters Did Not Function Properly.Caused by Open TE-65-60B Switch.Switch Repaired
ML19341B306
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/26/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19341B303 List:
References
LER-80-092-03L, LER-80-92-3L, NUDOCS 8101300629
Download: ML19341B306 (2)


LER-1980-092, /03L-0:on 801230,standby Gas Treatment Train C Relative Humidity Heaters Did Not Function Properly.Caused by Open TE-65-60B Switch.Switch Repaired
Event date:
Report date:
2591980092R03 - NRC Website

text

O.

~ ~ * ' *

  • LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

. C l A ! L l B l R l F l 1 lh 0 l0 l-l 0 ln In ln ln l_ ln ln !@l ! l 1 l 1 l 1l 1 lhl l

l @~

7 8 9 LICENSEE Coot 14 15 LICENSE NUM8tR JS 26 LICENSE TYPE JO Si LAI W CON'T loI1l Sv'R$ l L l@l 0 l 5 l0 l0 l0 l2 l 5 l9 @l Il 21 3 l Ol 810 l@l 0 l 1 l 2 l 6 ] 8 l 1 l@

/

8 60 61 DOCK ET NUM8 ER 68 69 EVENT DATE 14 75 REPORT D ATE Sc EVENT DESCRIPTION AND PROBA8LE CONSEOUENCES h 1 o 121 l During normal operation of unit 1, standby gas treatment (SBCT) train "c" reintiv.

h

,oy3, g umidity heaters did~not function properly.

"C" train was declared inoperable at 2330,

(T.S. 3.7.B.1).

This report is applicable to unit 2 and unit 3 also. Redundant j

l

, treatment trains "A" and "B" were operable. There was no effect on the health or I o 16 l l safety of the public. Redundant events: None. SI 4.7.*-3 was performed on SBGT g gtrains A and B to prove operability.

Iols t I

'Nd[E

"#"N SuBCEE SL8Eo'of SEEE Co CouroNENT CocE 10191 lM lB lh Wh Wh lT lM !< IT 19 Itt Ih Wh W h 8

9 to is 12 13 is 19 20 SE QU ENTI AL oCCU A nE NCE nEPoRT REVtSioN ty n EVENT YEAR R EPoRT No.

CoCE TYPE No.

@,ag,Ao l29810l L _J 101912 l g

i 0l 31 i tl l_l 10 l g

22 2J 24 26 27 28 29 J0 31 32 Aho oN PL NT MET HOURS 22 S8 17 Fo 8.

S PPL E MAN F T Rii-i K N lBjglJ4Zlg Wg W@

l0l0l0l0l y@

lY l@

lL ]@

lF l0 18 l0,

3J JS 36 37 40 4l 42 43 44 CAU!d CESCRIPTION AND CORRECTIVE ACTIONS h I i l o l i Tb65-60B, a Fcnwal switch model 53600-0, was found open.

The switch was repaired ii i,j ; and SI 4.7.B.3 was performed and "C" train was returned to service at 1725 on December 31, 1980. The failure of the component is considered random in nature gi g l and no recurrence control action is planned.

1i141 1 7

8 9 A S

% POWER oTHER STATUS DIS o V

DISCOVERY oESCRIPTION lt 15 l l Elh l0 l 8 l 0 lhl NA l

[A_jhl Observed bv operator ACTI* tiv con TENT REL.ASED oF RELE ASE AMOUNT oF ACTIVITY LOCATION oF RELE ASE l1 l6 l 3 h Whl NA l

l NA 7

8.

10 11 44 4S PERSONNEL EXPOSURES Nt lMflE R TYPE

DESCRIPTION

[TITl ! 0101 O l@W@i NA PER$oNNE'L NJURIES oESCRiPTioNh nuv8E R LLLJ l ol o l o l@l NA l

7 8 9 11 12 TYPE CESCR PT QN LZJ@l NA i,

i 8 9 10 g$$yE DESCRIPTroN LLLo_JLNjhl NA I

lIllIIIIIIII}

F n 9 to Gli 69 NAME OF PREPAPER PHONE:

zh 3 (

bb

+

y n

7

. Tennessee Vallry Author'ty Form BF-17

' Brokns Ferry Nuclear Plant BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION BFRO 259 /

8092 Technical Specification Involved 3.7.B.3 Reported Under Technical Specification 6.7.2.b(2)

Date of Occurrence 12/30/80 Time of Occurrence 2330 Unit.

1 Identification and Description of Occurrence:

Operations personnel observed that,"C" SBGT train relative humidity heaters did not function properly. This report is applicable to unit 2 and 3 also.

Conditions' Prior to Occurrence:

Unit 1 @ 80% power.

Unit 2 @ 100% power

- Unit 3 Refueling Action specified in the Technical Specification Surveillance Requirements met due to inoperable equipment. Describe.

SI 4.7.B.3 was performed on trains "A" and "B".

Apparent Cause of Occurrence-Open switch circuit.

Analysis of Occurrence:

There was no danger to the health or safety of the public, no release of activity, no damage to plant or equipment and no resulting significant chain of events.

Corrective Action

Repaired switch ci'rcuit, performed SI 4.7.B-3 to prove operability of "C" train and returned to service.

Failure Data:

None

  • Retention:

eriod - Lifetime; Responsibility - Administrative Supervisor

  • Revision:

uco