Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20043E0991990-05-31031 May 1990 LER 89-018-01:on 890827,cracking Found in Incoloy Alloy 800 Main Steam Ringheaders & Condition Determined to Have Generic Implications.Caused by Creep Failure.Main Steam Ringheaders repaired.W/900531 Ltr ML20042G4211990-05-10010 May 1990 LER 90-001-00:on 900410,non-essential Bus 5,4160/480-volt Transformer N-9215 Experienced Fault.Caused by Breakdown of Insulation on Secondary Coils of Transformer.Coils of Transformer rewound.W/900510 Ltr ML20011D4641989-12-20020 December 1989 LER 89-014-01:on 890818,four Fire Barrier Penetration Seals in Bldg 10 Did Not Meet Foam Seal Structure Criteria of Seal Spec.Caused by Improper Curing During Installation.Fire Watch Established & Seals repaired.W/891220 Ltr ML20024E0021983-07-29029 July 1983 LER 83-023/03L-0:on 830701 & 02,emergency Feedwater Unavailable to Drive Loop I Helium Circulation Water Turbines.Caused by Normal Wear of Valve PV-21243.Valve Internals Replaced & Valve calibr.W/830729 Ltr ML20024B9861983-07-0101 July 1983 LER 83-020/03L-0:on 830604,emergency Feedwater Header Supply to Loop I Helium Circulator Turbine Water Drive Isolated & Bearing Water Make Up Pump Taken Out of Svc.Caused by Flexitallic Gasket Failure Due to Normal wear.W/830701 Ltr ML20024A8521983-06-22022 June 1983 Updated LER 80-041/03X-2:on 800724,one of 12 Helium Circulator Seal Malfunction Pressure Differential Switches Discovered W/Trip Point Outside Tech Spec Limits.Caused by Dirt Accumulation in Electrical switches.W/830622 Ltr ML20023D9021983-05-26026 May 1983 LER 83-017/01T-0:on 830512,insp Performed Per IE Bulletin 83-03 Identified Six of Eight Check Valves Frozen in mid- Position.Caused by Corrosion & Rusting Valve Internal Parts. Valves Cleaned & Internal Components Replaced ML20028G2831983-01-28028 January 1983 LER 82-053/03L-0:on 821229,fuel Storage Well Pressure Exceeded Atmospheric Pressure While Reactor Was Shut Down. Caused by One Gas Compressor Being Out of Svc for Maint and Other Pumping Less than Capacity.Compressors Repaired ML20028G2711983-01-28028 January 1983 LER 82-054/03L-0:on 821229,outlet Temps Exceeded 120 F Limit When Reactor Became Critical During Isolation of Svc Water Flow to Pcrv Cooling Water Hx.Caused by Lack of Cooling Source.Design Change Initiated ML20028F2401983-01-19019 January 1983 LER 82-051/03L-0:on 821220,during Surveillance Test,One of Six Steam Pipe Rupture & One of 12 Steam Pipe Rupture Channels Identified Inoperable Due to Low Response to Calibr Noise.Caused by Failure of Resistor ML20028F2881983-01-17017 January 1983 LER 83-001/01T-0:on 830101 & 02,reactor Operated W/O Min Number of Operable Moisture Monitor Channels Required Per Table 4.4.1 of Limiting Conditions for Operation.Caused by Personnel Misinterpretation of Tech Specs ML20028A3101982-11-10010 November 1982 LER 82-042/03L-0:on 821013,unplanned Radioactive Gas Release Occurred W/Reactor Shutdown & Depressurized.Caused by High Airborne Activity in Reactor Bldg Due to Leaking Blank Flange.Emergency Procedures Initiated.Flange Repaired ML20028A2861982-11-10010 November 1982 LER 82-041/03L-0:on 821011,during Calibr of Radioactive Liquid Effluent Monitors,Trip Point for RIS-6212 Found to Be Less Conservative than Required.Caused by Instrument Drift. High Voltage & Discriminator Settings Adjusted ML20023A7451982-10-0808 October 1982 LER 82-036/03L-0:on 820908,one of Two Bearing Water Makeup Pumps Removed from Svc.Caused by Need to Rebuild Mechanical Seal Due to Normal Wear.Seal Rebuilt ML20052H9881982-05-12012 May 1982 LER 82-011/03L-0:during 820412-20,plant Operated in Degraded Mode of Limiting Conditions for Operation 4.2.11 Three Times & 4.2.10 Once.Caused by Offgas of Moisture from Core as Plant Returned to Power from Maint Outage ML20052H8751982-05-12012 May 1982 LER 82-013/03L-0:on 820412,separation in Axial Positions of Two Partially Inserted Control Rod Groups Fell Slightly Below Limit of 10 Ft.Cause Not Stated.Control Rods Repositioned ML20052G4151982-05-10010 May 1982 LER 82-012/03L-0:on 820410,at 10% Power,Instrument Air Compressor 1C Temporarily Taken Out of Svc to Repair after- Cooler Leak.Water Leak Caused by Normal Wear of after- Cooler.Air Compressor Returned to Svc After Repairs ML20052A3331982-04-27027 April 1982 LER 81-044 Has Been Cancelled ML20050B2541982-03-19019 March 1982 LER 82-006/03L-0:on 820218,primary Coolant Moisture Exceeded Tech Specs.Caused by Contamination W/Moisture During Maint Outage.Reactor Shutdown & Coolant Purification Trains Utilized to Reduce Impurity Levels ML20042B8231982-03-17017 March 1982 LER 82-005/03L-0:on 820215,loop 2 Steam Generator Penetration Rupture Disk 1 Leak Alarm Pressure Switch Found Isolated.Caused by Closed Pressure Switch Isolation Valve.Valve Opened ML20041F5791982-03-0808 March 1982 LER 82-007/01T-0:on 820222,control Rod Pairs for Regions 7 & 28 Did Not Insert Automatically Following Manual Scram. Possibly Caused by Binding or Sticking of Control Rod Drive Mechanism.Control Rods Exercised to Eliminate Sticking ML20041C3231982-02-19019 February 1982 LER 82-002/03L-0:on 820121,during Surveillance Testing, W/Reactor Shut Down,Three Loss of Bearing Water Pressure Differential Switches Found W/Setpoints Less Conservative than Required.Caused by Instrument Drift.Switches Recalibr ML20041C2761982-02-19019 February 1982 LER 82-003/03L-0:on 820122,one Drain Malfunction Pressure Differential Switch on 1C Helium Circulator Found Less Conservative than Tech Specs.Caused by Dirty Contacts. Contacts Cleaned & Switch Recalibr ML20041A9891982-02-16016 February 1982 LER 82-004/01T-0:on 820202,inadvertent Radioactive Liquid Waste Release Occurred from Receiver a During Plant Shutdown for Design Mods to Circulator Auxiliary Sys.Caused by Improper Valve Lineup.Event Reviewed W/Operators ML20040G9511982-02-0505 February 1982 LER 82-001/03L-0:on 820108,18 Snubbers Found Inoperable During Surveillance Testing,Indicating Inoperability During Reactor Operation.Caused by Seal Leakage & Deficiencies in Piston Position & Oil Level.Snubbers Repaired ML20040B8081982-01-13013 January 1982 LER 81-074/03L-0:on 811214,cold Reheat Snubber CRS-219 Found Detached from Pipe Mounting,Rendering Snubber Operable.Caused by Failure of Cotter Pin,Allowing Eyebolt to Be Displaced Out of Pipe & Snubber Rod Mounting ML20040B7911982-01-12012 January 1982 LER 81-075/03L-0:on 811221,two Sample Flow Circuits Found Out of Calibr During Annual Calibr of Primary Coolant Moisture Scram Instrumentation.Caused by Change in Instrument Characteristics.Procedures Being Revised ML20039F4911982-01-0404 January 1982 LER 81-073/03L-0:on 811208,one Helium Circulator Bearing Drain Pressure Low Switch Found to Have Trip Point Outside Required Limits.Caused by Dirt Accumulation in Electrical Switch That Impeded Contact ML20039C6321981-12-17017 December 1981 LER 81-072/03L-0:on 811117,PCRV Rupture Disk M-11701 Setpoint Exceeded Tech Specs Limits.Caused by Belleville Washer Operating Point Drift.Disks Under Evaluation ML20011A6371981-10-22022 October 1981 LER 81-060/03L-0:between 810922-1013,emergency Feedwater to Loop 1 Helium Circulator Water Turbine Drives Was Isolated on Three Occasions.Caused by Leakage Between Seat Ring & Valve Body Pressure Control Valve ML20010H9131981-09-11011 September 1981 LER 81-052/03L-0:on 810812,standby Bearing Water Makeup Pump Removed from Svc.Caused by Need to Repair Bonnet Leak in Valve in Suction Line to Pump.Pump Returned to Svc After Repair Completed ML20010J0141981-09-11011 September 1981 LER 81-050/03L-0:on 810814,total Dissolved Solids in Plant Nonradioactive Liquid Waste Effluent for 810809 Was Discovered to Have Exceeded Tech Specs.Caused by Improper Circulating Water Blowdown Arrangement.Blowdown Adjusted ML20010H8821981-09-0404 September 1981 LER 81-048/03L-0:on 810808 & 25 Loop 1 Prestressed Concrete Reactor Vessel Cooling Water Outlet Temp Exceeded 120 F Due to Failure of Temp Controller.Caused by Cold Solder Joint & Failure of Transistor in Output Circuit,Respectively ML20010H9301981-09-0101 September 1981 LER 81-049/03L-0:during 810802-07,increase Occurred in Offgassing from Core & Core Outlet Temps.Caused by Increased Primary Coolant Moisture & Oxidants from Refueling Shutdown ML20010G2711981-08-26026 August 1981 LER 81-046/03L-0:on 810728,emergency Feedwater Supply to Loop 1 Helium Circular Water Turbines Isolated to Repair Leaking 2-inch Consolidated Safety Relief Valves.Caused by Valve Leakage Downstream of Pressure Control Valve ML20010G1691981-08-26026 August 1981 LER 81-045/03L-0:on 810727,during Normal Startup Operation, Primary Coolant Dewpoint Exceeded Tech Spec Limits.Caused by Contamination Due to Moisture.Contaminants Removed from Primary Coolant ML20010G3371981-08-20020 August 1981 LER 81-051/03L-0:on 810721,Class I Snubbers Removed from Svc for Structural Mods W/Plant Operating at Power.Caused by Seismic Restraint Analysis Program.Snubbers Returned to Svc Following Mods ML20010G3181981-08-14014 August 1981 LER 81-043/03L-0:on 810717 & 0807,reactor Operated at Power W/One Class I Snubber Inoperable.Caused by Empty Oil Reservoirs on BFS-398E & MSS-149 Due to Leaking Fitting on Valve Block & Leaking Piston Seal.Fitting Tightened ML20010A1601981-07-16016 July 1981 LER 81-041/03L-0:on 810616,control Room Exhaust Damper Failed to Close.Caused by Dust Accumulation on Damper Vanes. Damper Operated Properly When Retested.Preventive Maint Program to Be Developed to Inspect & Clean Vanes ML20009E5101981-07-0202 July 1981 LER 81-039/03L-0:on 810602,following Routine Chlorination of Circulating Water Sys,Sample Indicated Excessive Residual Chlorine in Plant Liquid Effluent.Cause Unknown.Subsequent Chlorinations Showed No Abnormalities ML20009E5581981-07-0202 July 1981 LER 81-040/03L-0:between 810604 & 09,eight Hydraulic Shock Suppressors Were Found Out of Oil.Caused by Empty Hydraulic Oil Reservoirs Due to Leaking Seals & O-rings in Snubbers. Reservoirs Cleaned.Seals & O-rings Replaced ML20009E7191981-06-18018 June 1981 Revised LER 81-008/03X-1:on 810120,during Shutdown Maint & Primary Coolant Pressure Scram Calibr,Voltage Outputs of Pressure Transmitter Discovered High.Caused by Instrument Drift.Transmitter Calibr.Surveillance Test Completed ML20009E7011981-06-10010 June 1981 LER 81-035/03L-0:on 810511,w/plant at 70% Thermal Power During a Diesel Generator Set Surveillance Test,B Engine Tripped & Declutched.Caused by Failed Exhaust Temp Switch. Switch Repaired.Test Completed.Generator Returned to Svc ML20009A5501981-06-0505 June 1981 LER 81-038/03L-0:on 810507,two Class I Hydraulic Shock Suppressors Removed from Svc.Caused by Decision to Modify Suppressors to Original Configuration W/Zero Bleed Rate Block Valves ML20009A5341981-06-0303 June 1981 LER 81-034/03L-0:on 810504,equipment Necessary to Terminate Release from Liquid Waste Sys & Reactor Sump Found Not Operating Properly.Caused by Plugged Sense Lines on Flow Element Associated W/Control Valve ML20009A5281981-05-28028 May 1981 LER 81-032/03L-0:on 810428,hot Reheat Snubber HRS-244 Found Inoperable.Caused by Empty Hydraulic Oil Reservoir Due to Leaking Elbow Fitting.Fitting Tightened,Reservoir Refilled & Snubber Returned to Svc ML20004D5781981-05-27027 May 1981 LER 81-036/01T-0:on 810512,liquid Waste Discharge Exceeded Specified Limit for Tritium Concentration.Caused by Design Deficiency.Downstream of Valve HV 6212,150-200 Gallon Dead Leg Released Regardless of Dilution Flow Adequacy ML20004D7171981-05-27027 May 1981 LER 81-031/03L-0:on 810427,during Normal Surveillance Testing,Diesel Engine B Tripped & Declutched on Starting. Caused by Load Imbalance Between Engines a & B Due to Normal Wear of Linkage.Linkage Was Adjusted ML20004D6661981-05-27027 May 1981 LER 81-033/03L-0:on 810427,helium Circulator 1C Speed/Wobble Modifier Malfunctioned Causing Loss of Plant Protective Sys Functions to High Speed Trip Circuits.Caused by Electronic Circuit Unbalance.Spare Speed Element Installed 1993-06-03
[Table view] Category:RO)
MONTHYEARML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20043E0991990-05-31031 May 1990 LER 89-018-01:on 890827,cracking Found in Incoloy Alloy 800 Main Steam Ringheaders & Condition Determined to Have Generic Implications.Caused by Creep Failure.Main Steam Ringheaders repaired.W/900531 Ltr ML20042G4211990-05-10010 May 1990 LER 90-001-00:on 900410,non-essential Bus 5,4160/480-volt Transformer N-9215 Experienced Fault.Caused by Breakdown of Insulation on Secondary Coils of Transformer.Coils of Transformer rewound.W/900510 Ltr ML20011D4641989-12-20020 December 1989 LER 89-014-01:on 890818,four Fire Barrier Penetration Seals in Bldg 10 Did Not Meet Foam Seal Structure Criteria of Seal Spec.Caused by Improper Curing During Installation.Fire Watch Established & Seals repaired.W/891220 Ltr ML20024E0021983-07-29029 July 1983 LER 83-023/03L-0:on 830701 & 02,emergency Feedwater Unavailable to Drive Loop I Helium Circulation Water Turbines.Caused by Normal Wear of Valve PV-21243.Valve Internals Replaced & Valve calibr.W/830729 Ltr ML20024B9861983-07-0101 July 1983 LER 83-020/03L-0:on 830604,emergency Feedwater Header Supply to Loop I Helium Circulator Turbine Water Drive Isolated & Bearing Water Make Up Pump Taken Out of Svc.Caused by Flexitallic Gasket Failure Due to Normal wear.W/830701 Ltr ML20024A8521983-06-22022 June 1983 Updated LER 80-041/03X-2:on 800724,one of 12 Helium Circulator Seal Malfunction Pressure Differential Switches Discovered W/Trip Point Outside Tech Spec Limits.Caused by Dirt Accumulation in Electrical switches.W/830622 Ltr ML20023D9021983-05-26026 May 1983 LER 83-017/01T-0:on 830512,insp Performed Per IE Bulletin 83-03 Identified Six of Eight Check Valves Frozen in mid- Position.Caused by Corrosion & Rusting Valve Internal Parts. Valves Cleaned & Internal Components Replaced ML20028G2831983-01-28028 January 1983 LER 82-053/03L-0:on 821229,fuel Storage Well Pressure Exceeded Atmospheric Pressure While Reactor Was Shut Down. Caused by One Gas Compressor Being Out of Svc for Maint and Other Pumping Less than Capacity.Compressors Repaired ML20028G2711983-01-28028 January 1983 LER 82-054/03L-0:on 821229,outlet Temps Exceeded 120 F Limit When Reactor Became Critical During Isolation of Svc Water Flow to Pcrv Cooling Water Hx.Caused by Lack of Cooling Source.Design Change Initiated ML20028F2401983-01-19019 January 1983 LER 82-051/03L-0:on 821220,during Surveillance Test,One of Six Steam Pipe Rupture & One of 12 Steam Pipe Rupture Channels Identified Inoperable Due to Low Response to Calibr Noise.Caused by Failure of Resistor ML20028F2881983-01-17017 January 1983 LER 83-001/01T-0:on 830101 & 02,reactor Operated W/O Min Number of Operable Moisture Monitor Channels Required Per Table 4.4.1 of Limiting Conditions for Operation.Caused by Personnel Misinterpretation of Tech Specs ML20028A3101982-11-10010 November 1982 LER 82-042/03L-0:on 821013,unplanned Radioactive Gas Release Occurred W/Reactor Shutdown & Depressurized.Caused by High Airborne Activity in Reactor Bldg Due to Leaking Blank Flange.Emergency Procedures Initiated.Flange Repaired ML20028A2861982-11-10010 November 1982 LER 82-041/03L-0:on 821011,during Calibr of Radioactive Liquid Effluent Monitors,Trip Point for RIS-6212 Found to Be Less Conservative than Required.Caused by Instrument Drift. High Voltage & Discriminator Settings Adjusted ML20023A7451982-10-0808 October 1982 LER 82-036/03L-0:on 820908,one of Two Bearing Water Makeup Pumps Removed from Svc.Caused by Need to Rebuild Mechanical Seal Due to Normal Wear.Seal Rebuilt ML20052H9881982-05-12012 May 1982 LER 82-011/03L-0:during 820412-20,plant Operated in Degraded Mode of Limiting Conditions for Operation 4.2.11 Three Times & 4.2.10 Once.Caused by Offgas of Moisture from Core as Plant Returned to Power from Maint Outage ML20052H8751982-05-12012 May 1982 LER 82-013/03L-0:on 820412,separation in Axial Positions of Two Partially Inserted Control Rod Groups Fell Slightly Below Limit of 10 Ft.Cause Not Stated.Control Rods Repositioned ML20052G4151982-05-10010 May 1982 LER 82-012/03L-0:on 820410,at 10% Power,Instrument Air Compressor 1C Temporarily Taken Out of Svc to Repair after- Cooler Leak.Water Leak Caused by Normal Wear of after- Cooler.Air Compressor Returned to Svc After Repairs ML20052A3331982-04-27027 April 1982 LER 81-044 Has Been Cancelled ML20050B2541982-03-19019 March 1982 LER 82-006/03L-0:on 820218,primary Coolant Moisture Exceeded Tech Specs.Caused by Contamination W/Moisture During Maint Outage.Reactor Shutdown & Coolant Purification Trains Utilized to Reduce Impurity Levels ML20042B8231982-03-17017 March 1982 LER 82-005/03L-0:on 820215,loop 2 Steam Generator Penetration Rupture Disk 1 Leak Alarm Pressure Switch Found Isolated.Caused by Closed Pressure Switch Isolation Valve.Valve Opened ML20041F5791982-03-0808 March 1982 LER 82-007/01T-0:on 820222,control Rod Pairs for Regions 7 & 28 Did Not Insert Automatically Following Manual Scram. Possibly Caused by Binding or Sticking of Control Rod Drive Mechanism.Control Rods Exercised to Eliminate Sticking ML20041C3231982-02-19019 February 1982 LER 82-002/03L-0:on 820121,during Surveillance Testing, W/Reactor Shut Down,Three Loss of Bearing Water Pressure Differential Switches Found W/Setpoints Less Conservative than Required.Caused by Instrument Drift.Switches Recalibr ML20041C2761982-02-19019 February 1982 LER 82-003/03L-0:on 820122,one Drain Malfunction Pressure Differential Switch on 1C Helium Circulator Found Less Conservative than Tech Specs.Caused by Dirty Contacts. Contacts Cleaned & Switch Recalibr ML20041A9891982-02-16016 February 1982 LER 82-004/01T-0:on 820202,inadvertent Radioactive Liquid Waste Release Occurred from Receiver a During Plant Shutdown for Design Mods to Circulator Auxiliary Sys.Caused by Improper Valve Lineup.Event Reviewed W/Operators ML20040G9511982-02-0505 February 1982 LER 82-001/03L-0:on 820108,18 Snubbers Found Inoperable During Surveillance Testing,Indicating Inoperability During Reactor Operation.Caused by Seal Leakage & Deficiencies in Piston Position & Oil Level.Snubbers Repaired ML20040B8081982-01-13013 January 1982 LER 81-074/03L-0:on 811214,cold Reheat Snubber CRS-219 Found Detached from Pipe Mounting,Rendering Snubber Operable.Caused by Failure of Cotter Pin,Allowing Eyebolt to Be Displaced Out of Pipe & Snubber Rod Mounting ML20040B7911982-01-12012 January 1982 LER 81-075/03L-0:on 811221,two Sample Flow Circuits Found Out of Calibr During Annual Calibr of Primary Coolant Moisture Scram Instrumentation.Caused by Change in Instrument Characteristics.Procedures Being Revised ML20039F4911982-01-0404 January 1982 LER 81-073/03L-0:on 811208,one Helium Circulator Bearing Drain Pressure Low Switch Found to Have Trip Point Outside Required Limits.Caused by Dirt Accumulation in Electrical Switch That Impeded Contact ML20039C6321981-12-17017 December 1981 LER 81-072/03L-0:on 811117,PCRV Rupture Disk M-11701 Setpoint Exceeded Tech Specs Limits.Caused by Belleville Washer Operating Point Drift.Disks Under Evaluation ML20011A6371981-10-22022 October 1981 LER 81-060/03L-0:between 810922-1013,emergency Feedwater to Loop 1 Helium Circulator Water Turbine Drives Was Isolated on Three Occasions.Caused by Leakage Between Seat Ring & Valve Body Pressure Control Valve ML20010H9131981-09-11011 September 1981 LER 81-052/03L-0:on 810812,standby Bearing Water Makeup Pump Removed from Svc.Caused by Need to Repair Bonnet Leak in Valve in Suction Line to Pump.Pump Returned to Svc After Repair Completed ML20010J0141981-09-11011 September 1981 LER 81-050/03L-0:on 810814,total Dissolved Solids in Plant Nonradioactive Liquid Waste Effluent for 810809 Was Discovered to Have Exceeded Tech Specs.Caused by Improper Circulating Water Blowdown Arrangement.Blowdown Adjusted ML20010H8821981-09-0404 September 1981 LER 81-048/03L-0:on 810808 & 25 Loop 1 Prestressed Concrete Reactor Vessel Cooling Water Outlet Temp Exceeded 120 F Due to Failure of Temp Controller.Caused by Cold Solder Joint & Failure of Transistor in Output Circuit,Respectively ML20010H9301981-09-0101 September 1981 LER 81-049/03L-0:during 810802-07,increase Occurred in Offgassing from Core & Core Outlet Temps.Caused by Increased Primary Coolant Moisture & Oxidants from Refueling Shutdown ML20010G2711981-08-26026 August 1981 LER 81-046/03L-0:on 810728,emergency Feedwater Supply to Loop 1 Helium Circular Water Turbines Isolated to Repair Leaking 2-inch Consolidated Safety Relief Valves.Caused by Valve Leakage Downstream of Pressure Control Valve ML20010G1691981-08-26026 August 1981 LER 81-045/03L-0:on 810727,during Normal Startup Operation, Primary Coolant Dewpoint Exceeded Tech Spec Limits.Caused by Contamination Due to Moisture.Contaminants Removed from Primary Coolant ML20010G3371981-08-20020 August 1981 LER 81-051/03L-0:on 810721,Class I Snubbers Removed from Svc for Structural Mods W/Plant Operating at Power.Caused by Seismic Restraint Analysis Program.Snubbers Returned to Svc Following Mods ML20010G3181981-08-14014 August 1981 LER 81-043/03L-0:on 810717 & 0807,reactor Operated at Power W/One Class I Snubber Inoperable.Caused by Empty Oil Reservoirs on BFS-398E & MSS-149 Due to Leaking Fitting on Valve Block & Leaking Piston Seal.Fitting Tightened ML20010A1601981-07-16016 July 1981 LER 81-041/03L-0:on 810616,control Room Exhaust Damper Failed to Close.Caused by Dust Accumulation on Damper Vanes. Damper Operated Properly When Retested.Preventive Maint Program to Be Developed to Inspect & Clean Vanes ML20009E5101981-07-0202 July 1981 LER 81-039/03L-0:on 810602,following Routine Chlorination of Circulating Water Sys,Sample Indicated Excessive Residual Chlorine in Plant Liquid Effluent.Cause Unknown.Subsequent Chlorinations Showed No Abnormalities ML20009E5581981-07-0202 July 1981 LER 81-040/03L-0:between 810604 & 09,eight Hydraulic Shock Suppressors Were Found Out of Oil.Caused by Empty Hydraulic Oil Reservoirs Due to Leaking Seals & O-rings in Snubbers. Reservoirs Cleaned.Seals & O-rings Replaced ML20009E7191981-06-18018 June 1981 Revised LER 81-008/03X-1:on 810120,during Shutdown Maint & Primary Coolant Pressure Scram Calibr,Voltage Outputs of Pressure Transmitter Discovered High.Caused by Instrument Drift.Transmitter Calibr.Surveillance Test Completed ML20009E7011981-06-10010 June 1981 LER 81-035/03L-0:on 810511,w/plant at 70% Thermal Power During a Diesel Generator Set Surveillance Test,B Engine Tripped & Declutched.Caused by Failed Exhaust Temp Switch. Switch Repaired.Test Completed.Generator Returned to Svc ML20009A5501981-06-0505 June 1981 LER 81-038/03L-0:on 810507,two Class I Hydraulic Shock Suppressors Removed from Svc.Caused by Decision to Modify Suppressors to Original Configuration W/Zero Bleed Rate Block Valves ML20009A5341981-06-0303 June 1981 LER 81-034/03L-0:on 810504,equipment Necessary to Terminate Release from Liquid Waste Sys & Reactor Sump Found Not Operating Properly.Caused by Plugged Sense Lines on Flow Element Associated W/Control Valve ML20009A5281981-05-28028 May 1981 LER 81-032/03L-0:on 810428,hot Reheat Snubber HRS-244 Found Inoperable.Caused by Empty Hydraulic Oil Reservoir Due to Leaking Elbow Fitting.Fitting Tightened,Reservoir Refilled & Snubber Returned to Svc ML20004D5781981-05-27027 May 1981 LER 81-036/01T-0:on 810512,liquid Waste Discharge Exceeded Specified Limit for Tritium Concentration.Caused by Design Deficiency.Downstream of Valve HV 6212,150-200 Gallon Dead Leg Released Regardless of Dilution Flow Adequacy ML20004D7171981-05-27027 May 1981 LER 81-031/03L-0:on 810427,during Normal Surveillance Testing,Diesel Engine B Tripped & Declutched on Starting. Caused by Load Imbalance Between Engines a & B Due to Normal Wear of Linkage.Linkage Was Adjusted ML20004D6661981-05-27027 May 1981 LER 81-033/03L-0:on 810427,helium Circulator 1C Speed/Wobble Modifier Malfunctioned Causing Loss of Plant Protective Sys Functions to High Speed Trip Circuits.Caused by Electronic Circuit Unbalance.Spare Speed Element Installed 1993-06-03
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20196G6731997-07-0101 July 1997 Informs Commission That Decommissioning Process Has Been Completed at PSC of Colorado Fsvngs,Unit 1 Located in Town of Platteville in Weld County,Co ML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20140E1121997-04-10010 April 1997 Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20134D1661997-01-30030 January 1997 Rev 1,Vol 6 to Final Survey Rept,Final Survey of Group E (Book 2A of 2) ML20137S6111996-12-31031 December 1996 Annual Rept Pursuant to Section 13 or 15(d) of Securities Exchange Act 1934, for Fy Ended Dec 1996 ML20134G6401996-10-29029 October 1996 Rev 0,Volume 6,Books 1 & 2 of 2 to Final Survey of Group E ML20134G6171996-10-29029 October 1996 Rev 2,Volume 1,Books 1 & 2 of 2 to Final Survey Description & Results ML20134G7271996-10-29029 October 1996 Rev 0,Volume 11,Book 1 of 1 to Final Survey of Group J ML20134G6861996-10-29029 October 1996 Rev 0,Volume 8,Books 1 & 2 of 2 to, Final Survey of Group G ML20134G6321996-10-26026 October 1996 Rev 1,Volume 5,Books 2 & 3 of 3 to Final Survey of Group D ML20133D7831996-10-22022 October 1996 Preliminary Rept - Orise Support of NRC License Insp at Fsv on 960930-1003 ML20116A4661996-07-19019 July 1996 Fsv Final Survey Exposure Rate Measurements ML20112J6861996-05-31031 May 1996 June 1996 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning.Rept Covers Period of 960216-0531 ML20112C1531996-05-17017 May 1996 Fsv Final Survey Exposure Rate Measurements ML20101G5521996-03-21021 March 1996 Confirmatory Survey Activities for Fsv Nuclear Station PSC Platteville,Co, Final Rept ML20097E3201996-01-31031 January 1996 Nonproprietary Fort St Vrain Technical Basis Documents for Piping Survey Instrumentation ML20095K4131995-12-26026 December 1995 Rev 3 to Decommissioning Plan ML20095H7211995-12-20020 December 1995 Revs to Fort St Vrain Decommissioning Fire Protection Plan Update ML20095K9751995-12-15015 December 1995 Fort St Vrain Project Update Presentation to NRC, on 951207 & 15 ML20096C1671995-12-13013 December 1995 Rev 4 to Decommissioning Fire Protection Plan ML20094M1651995-11-30030 November 1995 Nonproprietary Fsv Technical Basis Documents for Piping Survey Implementation ML20092F3461995-09-14014 September 1995 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning, Covering Period of 950516-0815.W/ ML20137H3531994-12-31031 December 1994 Partially Withheld, Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, App D,Comments by Mkf & Westinghouse Team & Responses ML20137S2331994-12-31031 December 1994 Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994 ML20029C6031993-12-31031 December 1993 1993 Annual Rept Public Svc Co of Colorado. W/940405 Ltr ML20058Q3791993-12-21021 December 1993 Rev 1 to Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20045B3641993-06-30030 June 1993 June 1993 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning. ML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20077D1631993-05-10010 May 1993 Enforcement Conference, in Arlington,Tx ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20127F5691992-11-0303 November 1992 Informs Commission of Intent to Issue Order Approving Plant Decommissioning Plan & Corresponding Amend to License DPR-34 ML20101E5761992-05-31031 May 1992 Monthly Defueling Operations Rept for May 1992 for Fort St Vrain ML20096E8221992-04-30030 April 1992 Monthly Operating Rept for Apr 1992 for Fort St Vrain.W/ ML20095E9601992-04-17017 April 1992 Rev to Fort St Vrain Proposed Decommissioning Plan ML20100R7431992-03-31031 March 1992 Monthly Operating Rept for Mar 1992 for Fort St Vrain.W/ ML20090L0621992-02-29029 February 1992 Monthly Operating Rept for Feb 1992 for Fort St Vrain Unit 1 ML20092D0081992-01-31031 January 1992 Monthly Operating Rept for Jan 1992 for Fort St Vrain Nuclear Generating Station ML20102B2241992-01-22022 January 1992 Fort St Vrain Station Annual Rept of Changes,Tests & Experiments Not Requiring Prior Commission Approval Per 10CFR50.59, for Period 910123-920122 ML20094N6701991-12-31031 December 1991 Public Svc Co Annual Financial Rept for 1991 ML20091J6251991-12-31031 December 1991 Monthly Operating Rept for Dec 1991 for Fort St Vrain.W/ ML20094D6711991-11-30030 November 1991 Monthly Operating Rept for Nov 1991 for Fort St Vrain Unit 1 ML20090M1871991-11-20020 November 1991 FOSAVEX-91 Scenario for 1991 Plant Exercise of Defueling Emergency Response Plan ML20086D6891991-11-15015 November 1991 Proposed Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20085N1451991-11-0505 November 1991 Revised Ro:Operability Date of 910830 for Electric Motor Driven Fire Water Pump P-4501 Not Met.Pump Not Actually Declared Operable Until 911025.Caused by Unforseen Matl & Testing Problems.Equivalent Pump Available ML20086C5451991-10-31031 October 1991 Monthly Operating Rept for Oct 1991 for Fort St Vrain.W/ ML20085H6611991-10-10010 October 1991 Assessment of Mgt Modes for Graphite from Reactor Decommissioning ML20091D7671991-10-0101 October 1991 Rev B to Engineering Evaluation of Prestressed Concrete Reactor Vessel & Core Support Floor Structures for Proposed Sys 46 Temp Change ML20085D9861991-09-30030 September 1991 Monthly Operating Rept for Sept 1991 for Fort St Vrain.W/ 1997-07-01
[Table view] |
Text
, NRC FOIM 366 U. S. NUCLEAft REGULATO%Y COMMIL40N LICENSEE EVENT REPORT CONTROL 8 LOCK: l i
l l ! ] I Ih e
(PLEASE PRINT OR TYPE ALL REQUtRED INFORMATION) l I l@ !
lo !il8 I9 C 10 7
I r I S Iv 11 f@l010 l- 1010101010 l-loIc_J@lsi LICENSEE COOg to il LIC E NsI %,V8E R 25 2ti 11 1121 L4C&N$E Typeol@l JJ $7 C A T bd l CON'T loitj " '
3c ,"c il @l0 l 5 l0 l01012 l6 !7 @l 1 11 10 l5lglol@l0ll *E*CRT COCK ET N64s g R en 69 Eb EN'.* Q 4TE 74 7S l0 l9 l8 l1 l@
O ATE is0 l
7 6 60 61 EVENT DESCRIPTION AND PROS A8LE CONSEQUENCES h l3!2l lDuring nor=al operation, while verifying hydraulic snubber bleed rate, five Class 1 l
,g,3, ydraulic snubbers were removed f rom service when the reactor was not in the shutdown l gg,,, ;cr refueling condition. This censtitutes operation in a degraded mode allowable by l
,g 3, ;LCO 4.3.10 and is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)2. ,
There was no ef f ec t on the health or safety of the public.
,,g, ; Similar report RO 80-61. ;
la67l l The five snubbers removed f or test were VSS-101, VSS-104, VSS-107. VSS-110 and I i;,,, ;VSS-111. .0 I
W *^W Co sLE!!E Cou.c~ENTCoot sL.C7ef sMcE lai+1 l x l x l@ Lx_J@ LLj @ LSJ u l P l o i n l T I@ W@ I z i @ ;>
a 9 10 11 12 13 18 19 SEQUENTIAL oCCuRnENCE REPORT mEVislCN E% ENT YEAR RE, ORT No. COCE TYPE No.
LEm ao
- @ ggar l8l0l l-l l 0l 6l 5l l/l lol3l lXl l-l l 1l
_i :: 22 24 26 :7 :s :s 2a ai 22 TA N AC C C PL NT VE C WQURS : 8 I FoR 8. SLP*L E MANUFAC RER lX l@l34 Zl@ lZ l@ l36Zl@ l 010l 0l 01 l Yl@ lNl@ l43Al@ l44I l 2 l 0 l 747l@
3J ;5 3/ 40 ei 42 CAUSE CESCRIPTION AND CO ARECTIVE ACTIONS h i i i o ; ]Non-bleeding hydraulic vent stack saubbers were reolaced bv snubbers with bleed caea- l l- lij gbility. Engineerinz evaluation decet nined that the bleed rate should be zero and the 1 I
l g,;7i (snubbers were adiusted to zero blaed rate in olace. Five stubbers were renoved.
g,;3, l tested, and replaced to verify that the actual bleed rate was zero. !
l l'IAIl 80 ae discovery CEsCRnPTION
'sTIb % POWER CTh ER sTATLS Dis O RY l
Ii 15 l l E [@ l 0] 5 l 6l@l N/A l l C l@l Seismic Evaluation ACTiv Tv CNTENT REuAsta c. REMAsE LOCATION CF REMAst @
li is I lju @ LzJ@l '
N/A AMoVNT OF" ACTIVITY I N/A @I "
I
,ERseNNdExpos&s
~uv.ER rv,E etsCRi,Tio~ @ . d.
I
, li l 71101010 l@W@l N/A "
i ,ERscNN A'.Nau'4Es l Nuo.ER =EsCRimeN@ -
I li li ia 3l lo 7 3 10101@l12N/A11 80 Loss C8 CR DAMAGE To FACILITY TveE OEsCRIPTION l
li 191 d 9 l Z l@ltoN/A 80 issVE DEsCR TION ,
12 i ci I N U@l N/A . , .
J ll11111111Illi PHONE:
3 3) 785-2224 NAME OF PREPARER 8.10114 o up /'
u REPORT DATE: _
Januarv 6, 1981 REPORTABLE OCCURRENCE 80-65 ISSUE 1 OCCURRENCE DATE: _
November 9, 1980 Page 1 of 3 FORT ST. VRAIN NUCLEAR GENERATIm STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO 80651 REPORT NO. 50-267 /80-65 /03-X-1 Revised Final IDENTIFICATION OF OCCURRENCE:
During November,1980, five Class I hydraulic shock suppressors were removed from service, one at a time, for test. Each event constitutes operation in a degraded mode allowed by LCO 4.3.10 and is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)2.
EVENT DESCRIPTION:
On five occasions, while the reactor was at power, operable Class 1 shock suppressors (snubbers) were removed from service for test:
VSS-110 - out of service from 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br /> to 1235 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.699175e-4 months <br /> on November 5, 1980 VSS-101 - out of service from 1305 hours0.0151 days <br />0.363 hours <br />0.00216 weeks <br />4.965525e-4 months <br /> on November 5,1980, to 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> on November 6,1980 VSS-104 - out of service from 1007 hours0.0117 days <br />0.28 hours <br />0.00167 weeks <br />3.831635e-4 months <br /> to 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on November 6, 1980 VSS-111 - out of service from 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> on November 6,1980, to ,
1745 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.639725e-4 months <br /> on November 7,1980 Technical Specificaciou LCO 4.3.10 states that all shock suppressors on i
Class 1 piping systems shall be operable if the reactor is not shutdown or refueling. The LCO further statas that continued power operation af ter a snubber is determined to be inoperable is permissible only during the suc-ceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> unless the snubber is made operable sooner or replaced.
. The five vent stack snubbers removed for test were returned to service with-l in the allowed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in all cases.
w
6,,
REPORTABLE OCCURRENCE 80-65 ISSUE 1 Page 2 of 3 CAUSE DESCRIPTION:
During performance of the hydraulic snubber functional test required each refueling by the Fort St. Vrain Technical Specifications, it was found that the 16 vent stack snubbers did not have bleed capability. This was reported as part of Reportable Occurrence 79-13.
The 16 non-bleeding hydraulic snubbers were modified or replaced so that bleed capability was available.
During the evaluation of seismic restraints in accordance with I & E Bul-letin 79-14, it was determined that the bleed rate on these 16 snubbers shou'.d be zero.
The blsed rate of the 16 vent stack snubbers was adjusted to zero with the snt.bbers in place. In order to verify that the bleed rate is in f act zero, each snubber is being removed, cesced, and replaced. During November, 1980, five snubbers were removed from service for test, resulting in five events of operation in a degraded mode allowed by LCO 4.3.10.
CORRECTIVE ACTION:
Each of the five snubbers were returned to service af ter testing was com-ple ted .
No further corrective action is anticipated or required for the f ;ve vent stack snubbers noted in this report.
i i.
________._____.____5
O 4
REPORTABLE OCCURRENCE 80-65 ISSUE 1 Page 3 of 3 Prepared By: T. W i Richard R. Frost Technical Services Technician Reviewed By: c-Tec a Services Supervisor Reviewed By: \
Frank M. Mathie Operations Manager
,, Approved By: W,o M Don Warembourg /
Manager, Nuclear Production