05000259/LER-1980-073, Updated LER 80-073/01T-1:on 800928,river Water Temp Rise Peaked Above Tech Spec Level.Caused by Incorrect Computer Temp Rise Predictions.River Flow Increased

From kanterella
(Redirected from ML19340E316)
Jump to navigation Jump to search
Updated LER 80-073/01T-1:on 800928,river Water Temp Rise Peaked Above Tech Spec Level.Caused by Incorrect Computer Temp Rise Predictions.River Flow Increased
ML19340E316
Person / Time
Site: Browns Ferry 
Issue date: 01/09/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19340E315 List:
References
LER-80-073-01T, LER-80-73-1T, NUDOCS 8101130412
Download: ML19340E316 (2)


LER-1980-073, Updated LER 80-073/01T-1:on 800928,river Water Temp Rise Peaked Above Tech Spec Level.Caused by Incorrect Computer Temp Rise Predictions.River Flow Increased
Event date:
Report date:
2591980073R00 - NRC Website

text

_

~

i$y"*

UPDATE REPORT - PREVIOUS REPORT DATED 10/1f 80*"""''* *"* '"~"~ '

- LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l l

(PLEASE PRINT OR TYPE ALL REOutRED INPORMATIONI i

e j o j t l l Al LI B l R ' F l 1 ]@180 l 01 - 10 l 0 l 0 l 0 l 0 l-l0 l0 l@l4 l1 l1 l1 l1 l@QJ @

7 8 9 LICENSEE CC 1E 14 LICENSE NuwSER 26 26 LICENSE TvrE JJ 4 F L A T Se CON'T lolil sNE I L hl 0l 5 l 0 l 0 f 0 l 21519 @l 0 l 912 l8 l 8 l0 @l 01 1l 019181 11@

7 8

60 61 DOCEET NUwSER 68 69 EVENT DATE 79 REPORTCATE 8'c EVENT DESCalPTION AND PROsABLE CONSEQUENCES h t o 12 l I During ste Ay state operation, the river water temperature rise peaked at 5.1 F d/t.

l 5TF1 l This was a 0.17 d/t violation of technical specification E.T.S.2.1.

The next day,

[

l it was noted that river temperature was rapidly increasing. Unit 3 was placed on j

o 4 l o i s t l cooling tower mode: however, d/t again went 0.1 F over limit. Previous occurrences: _

g l BFR0 259/78011, 78012 and 80054. There was no hazard to the public. This report ITTTl I is applicable to units 2 and 3 also.

I o le i I sv5TEU

CAUSE

CAUSE COMP.

VA LV E CODE CCDE SUSCoJE COMPONENT CODE SueCoDE Sus 000E l o 19_I l Zl Zlh W@ l Al@ l Zl Zl Zl Zl Zl Zl@ g@

Z 7

8 9

to 11 12 13 is is SEQUENTIAL occummENCE REPORT REVistCN g nspo EVENTYEAR REPORT ho.

CODE TYPE Na

@y"(f,g l2i 8l 0l l,_ l l 0l 7l 3l y

l0l1l

]

g g

22 22 24

s 27 a

a w

ai 22

^ SeYiTTE U Fo'R S e

""s'U"E"EI w N[$7UE.

0l0l0@l0lgg Wg gg l Zl 9 l 9 l 9 EN 'A"CDo"E c'NINdT SETT s

t wouRs

%%h dh Wh l7 33 44 35 M

2 40 en 42 43 u

CAUSE CESCRIPT*0N AND CORRECTIVE ACTIONS h l i l o l l Computer temperature rise predictions were incorrect. On first occurrence, the m Iriver flow was increased. Upon second occurrence, unit 3 was placed on cooling i1 i7i l tower cooling. Occurrences appear to be at random requiring no further corrective j

t g l action.

i l i 141 I 7

8 9 5 ANs

% POWER oTHER STATUS sc Hy DISCovtRY DESCRIPTION NA l

J gj Operator observation g gg l0 l9 l7 l@l I

A VITY CO TENT RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE Ii l o I W @D OF RELEASEW@l NA l

l NA PER$CNNEL EXPOSU 'IES NuveER TYPE

DESCRIPTION

101Ol01@ W @l NA i i PER$CNNEL #NJU IES NuveER

DESCRIPTION

li la l l 0l 0 l O jgj 7

8 9 11 12 LOSS OF 04 OAMACE TO FACILITY TYPE DESCR'PtsoN LLLJ LZJ@l "A

I 8 9 to PUBLICITY NRC USE OM Y f55UED@DESCniPTroN W

l Media aformation line.

l lllllll1lllt,'

2 o 68 69 7

8 9 to NAME OF PREPARER PHONE:

-- E 10 u s o#//.2 i

Tennessee Valley Authority Fona BF 17 Browns Ferry Nuclear Plant BF 15.2 1/10/79 1

LER SUPPLEMENTAL INFORMATION BFRO 259 / 8073 Technical Specification Involved 2.1 (Appe'ndix B)

Reported Under Technical Specification 5.6.3.b (Appendix B) i 9/28/80 zuuu Date of Occurrence & 9/29/80 Time of Occurrence & 0615 Unit. 1&3 4

Identification and Description of Occurrence:

River water temperature rise peaked at 5.1 F d/t. Computer. river temperature predictions gave no indication that the 5.0 F d/t limit would be violated.

This report is applicable to units 2 and 3 also.

Conditions'P *sr to Occurrence:

I Unit 1 @ 97% prior to the 9/28/80 occurrence; 82% during 9/29/80 occurrence.

Unit 2 @ refuel outage

~

Unit 3 @ 99% prior to the 9/28/80, occurrence; 100% during the 9/29/80 occurrence.

Action specified in the Technical Specification Surveillance Requirements met i

due to inoperable equipment. Describe.

Reduced was,te heat discharged to the reservoir.

Apparent Cause of Occurrence:

Computer river temperature Pv. dictions were incorrect. A contributing fattor may be the extensive rainfall and the lower than normal ambient tssperatures experienced throughout the valley for the past 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

l Analysis of Occurrence:

j No damage to any plant equipment. No activity was released. No personnel

. exposure or injury and no danger the public health and safety.

I

Corrective Action

~

- Increased river flow requested and unit 3 was placed on cooling tohers.

l

(

Failure Data:

None

  • Retention:

eriod - Lifetime; Responsibility - Administrative Supervisor l