AECM-80-220, Final Deficiency Rept Re Design Nomographs Used in Sizing & Selection of Hydramotor Electrohydraulic Actuators Supplied by Itt General Controls.Condition Determined Not Reportable Under 10CFR50.55(e)
| ML19338D665 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/15/1980 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML19338D666 | List:
|
| References | |
| 10CFR-050.55E, 10CFR-50.55E, AECM-80-220, NUDOCS 8009230627 | |
| Download: ML19338D665 (2) | |
Text
_ ___ __ __
U k% %
/~
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi
=
Emihiedslang P. O. B O X 16 4 0. J A C K S O N. MI S SI S SIP PI 3 9 2 0 5
"$%%%%8-September 15, 1980-Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Mariotta Street, N.W.
Suite 3100 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Director
Dear Mr. O'Reilly:
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/12, Final Report, Design Nomographs Related to ITT General Controls Hydramotor Electrohydraulic Actuators AECM-80/220
References:
- 1) AECM-80/87, 4/25/80
- 2) AECM-80/158, 7/21/80 On March 28, 1980, Mississippi Power & Light Company notified Mr. M. J. Gouge of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS). The deficieuey con =
cerns design nomographs used in the sizing and selection of hydra-motor electrohydraulic actuators.
The nomographs and actuators are supplied by ITT General Controls.
We have completed our review of this condition, and our conclu-sion is that it is not reportable under 10C7R50.55(e). Details are provided in the attached letter, transmitted to your office as a response to IE Bulletin 80-09.
Yours truly, Y
bM H
g J. P. McGaughy, Jr.
Assistant Vice President, Nuclear Production WDH:st Attachment (go!1 C009230 fos 7 Mambac Midd'. South utiiities System 8
'a,'
s
-MISSISSIPPI POWER O LIGHT CCMPANY Mr. J. P. O'Reilly.
- AECM-80/220-
- NRC Page 2 Mr. s. L.' Stampley-r y..
. cc:
Mr. R. B.~McGehee
--Mr. T. B.' Conner Mr. Victor' Stallo, Director Division of' Inspection & Enforcement-U. S. Nuclear Regulatory Commission
~
Washington, D.C.
.20555-4 I
9 9
i i
t 9
.:~.
'