ND-19-1365, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05b (Index Number 645)

From kanterella
(Redirected from ML19330E167)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 2.6.09.05b (Index Number 645)
ML19330E167
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/26/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-19-1365
Download: ML19330E167 (6)


Text

Michael J. Vox 7825 River Road

^Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tel NOV 2 6 2019 Docket Nos.: 52-025 ND-19-1365 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05b [Index Number 6451 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.09.05b [Index Number 645]

for confirming the central and secondary alarm stations are located inside the protected area and the interior of each alarm station is not visible from the perimeter of the protected area. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

haelJ. Vox ^ V Michael Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.6.09.05b [Index Number 645]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-19-1365 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKlnney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Mr. W.Jones (w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Mr. C. Santos Oalethoroe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-19-1365 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Orlani (w/o enclosures)

Mr. D.0. Durham (w/o enclosures)

Mr. M. M. CorlettI Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham

U.S. Nuclear Regulatory Commission ND-19-1365 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1365 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.6.09.05b [Index Number 645]

U.S. Nuclear Regulatory Commission ND-19-1365 Enclosure Page 2 of 3 ITAAC Statement Desian Commitment 5.b) The central and secondary alarm stations are located inside the protected area and the interior of each alarm station is not visible from the perimeter of the protected area.

Insoections/Tests/Analvses Inspections of the central and secondary alarm stations will be performed.

Acceptance Criteria The central and secondary alarm stations are located inside the protected area and the interior of each alarm station is not visible from the perimeter of the protected area.

ITAAC Determination Basis Inspections of the central and secondary alarm stations were performed to confirm the Vogtle Electric Generating Plant(VEGP) Unit 3 central and secondary alarm stations are located inside the protected area and the interior of each alarm station is not visible from the perimeter of the protected area and satisfy the applicable alarm station location requirements of the VEGP Unit 3 and Unit 4 Physical Security Plan associated with 10 CFR Part 73.55(i)(4). The VEGP Unit 3 Plant Security System ITAACs only cover the Unit 3 plant security system design commitment scope.

An inspection (walkdown) was completed using protected area, central alarm station, and secondary alarm station approved construction drawings, and visual observations, to confirm that the as-built locations of the central alarm station and the secondary alarm station are within the protected area perimeter. The inspection also included photographs taken from the outside of the building that contains the central alarm station and the building that contains the secondary alarm station, to confirm that the interior of each alarm station is not visible from the exterior of the building the alarm station is located in. The buildings that contain the central alarm station and secondary alarm station are located inside the protected area perimeter, therefore, the photographs confirmed that the interior of each alarm station is not visible from the perimeter of the protected area.

The inspection results are documented in Principal Closure Document SV3-SES-ITR-800645 (Reference 1) and confirm that the Unit 3 central and secondary alarm stations are located inside the protected area and the interior of each alarm station is not visible from the perimeter of the protected area.

Reference 1 is available for NRG inspection as part of the Unit 3 ITAAC Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC

U.S. Nuclear Regulatory Commission ND-19-1365 Enclosure Page 3 of 3 Completion Package for ITAAC 2.6.09.05b (Reference 2) and is available for NRC review.

ITAAC Completion Statement Based on the above Information, SNC hereby notifies the NRC that ITAAC 2.6.09.05b was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained In their as-designed, ITAAC compliant condition In accordance with approved plant programs and procedures.

References favailable for NRC inspection)

1. SV3-SES-ITR-800645, Rev. 0,"Unit 3 ITAAC 645 Walkdown Inspection; ITAAC 2.6.09.05b"
2. 2.6.09.05b-U3-CP-Rev0, ITAAC Completion Package