PY-CEI-NRR-1070, Forwards Reactor Containment Bldg Integrated Leak Rate Test. Special Rept Summarizes Results of Periodic Test Conducted 890705-09 During First Refueling Outage
| ML19327A744 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 10/12/1989 |
| From: | Kaplan A CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19327A745 | List: |
| References | |
| PY-CEI-NRR-1070, NUDOCS 8910180034 | |
| Download: ML19327A744 (1) | |
Text
w m
.". v 1
s 1
THEl CLEVELAND ELECTRIC ILLUMINATING COMPANY I.
P.O. DOX 97 - 5. PERRY. OH60 44001 5 ' TELEPHONE (tit) 9963737 A
ADDRESS 10 CENTER MOAD f
[.
FMOW CLEVELAND: 341 1960 Serving The Best location in the Nation l
Al Kaplan PERRY NUCLEAR POWER PLANT -
, vet E sotm NUCLEAft 08tOUP 5
Octo'oer 12, 1989 PY-CEI/NRR-3070'L f
U.S. Nuclear Regulatory Commission f
Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 l
Reactor Containment Building i
Integrated Leak Rate Test Dear Sir Attached is a Special Report entitled " Reactor Containment Building Integrated l
Leak Rate Test" which summarizes the results of the periodic test conducted July 5 through July 9, 1989 during our first refueling outage.- This report satisfies the requirements of 10CFR50, Appendix J, Section V(B).
.If you have any questions, please feel free to call.
I Very truly yours,
,ss > -
l
, ('
MdhNtv%-
4 Al ap an Vice President Nuclear Group AKa nj c i
ces: 'T. Colburn P. Hiland USNRC Region III j
i k
.G910180034 891012 PDR ADOCK 05000440 P
FDC
^