U-601541, Forwards Rev 1 to Updated FSAR for Clinton Power Station & 10CFR50.59 Repts of Changes for Jan-Mar 1989.Updated FSAR Reflects Changes Through Mar 1989

From kanterella
(Redirected from ML19325C383)
Jump to navigation Jump to search
Forwards Rev 1 to Updated FSAR for Clinton Power Station & 10CFR50.59 Repts of Changes for Jan-Mar 1989.Updated FSAR Reflects Changes Through Mar 1989
ML19325C383
Person / Time
Site: Clinton 
Issue date: 09/27/1989
From: Hall D
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19325C384 List:
References
DPH-0578-89, DPH-578-89, GL-81-06, GL-81-6, U-601541, NUDOCS 8910160149
Download: ML19325C383 (3)


Text

--

3D Ye a

U-601541 -

L4 8-89 (09 - 27) -LP i

en

-1A.120 i

s. ' ' '

I /LLINO/8 POWER COMPANY jp CLINTON POWER STATiO4. P.O. BOX 678. CLINTON, ILLINOIS 6)727 j

' ' +

i i

E DPH-0578-89 September 27, 1989' D

10CFR50.71(a)

+

'o f

-Docket'No. 50-461

&c.

i

?-

d',

JU.S.1 Nuclear Regulatory Commission i

Document ~ Control Desk f

Washington, D.C.

20555 t

S Clinton Power. Station L

Subject:

L

~

Submittal ~of the Updated Safety Analysis Report, L

Revision 1-l

Dear Sir:

b

Pursuant to 10CFR50.71(e), Illinois Power company (IP)-

L hereby submits one signed original and-ten copies of Revi* ion 1?to the Clinton Power Station Updated Safety Analysis Report (USAR).

V

. In. accordance with' 10CFR50.71(e) (2) (ii), the attached Clinton Power Station 10CFR50.59. Report 1for implemented changes affecting the USAR for the period.of January 1989 i

through March'1989, includes all safety. evaluations

. performed by IP.under the provisions of 10CFR50.59 which B'

No Ewere-not previously submitted to the Nuclear Regulatory Commission-(NRC).. Identification of changes made from March 29, 1988=through. December 31, 1988, were submitted to the

-NRC in IP letter U-601386.

'Th'e: revision to the USAR has been prepared considering the, additional guidance provided by Generic Letter 81-06,

' " Periodic Updating of Final Safety Analysis Reports

- (FSARs)'" dated February 26, 1981.

The attached revised pages are annotated with Revision 1, September 1989, and revision bars.

This USAR revision reflects changes made through March 1989.

Subsequent' revisions of the USAR will be submitted

. annually and will reflect all changes up to a maximum of six months. prior to the date of filing.

/f@[i 8910160149 870927 ADOCK0500gggi sfpl FDR K

l l

r-s b

. As required by 10CFR50.71(e) (2) (i), _ the attached.

affidavit certifies that the'information given in the m.:

l attached USAR accurately presents changes made since the previous submittal; (Revision 0 of the USAR.), necessary t o i

reflect information and analyses submitted to the Commission-or prepared pursuant to commission requirement.

~

+

Sincerely _yours, f

in D.

P. Hall Senior Vice President 1

SFB/kra

[

Attach'ments cc:

NRC Region III, Regional Administrator NRC Clinton--Licensing Project Manager NRC Resident Office.

-Illinois-Department of Nuclear Safety a

L l

t J

J v

~

q e

, y'..

p, to U-601541 ll -

t.

STATE-OF-ILLINOIS COUNTY OF;DEWITT' 1

r.

i k

-D.~ P. Hall, being first' duly sworn,: deposes'and says:

That ho ic Senior Vice President of Illinois Power Company, that the.information provided in Revision 1 cf the Updated Safety Analysis Report has been prepared under his supervision and direction; that he'knows the contents

-thereof; and thac to-the best of his knowledge and belief said request-and the facts colitained therein are true and Correct.

This M day of September 1989 DATED:'

Signed:-

/

D.

P. Hall Subscribedandsworntobeforemethis[f day of September 1989.

o c:::::::::::::::::::::::,

"0FFICIAL SEAL" d

)

Notary Public Notary Put : Sta e o Illinois

- My Commission Expires 9/1/92

{

\\