Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-19-113 November 7, 2019 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Facility Operating License No. NPF-96 NRC Docket No. 50-391
Subject:
Supplement to Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) (EPID L-2019-LLA-0020)
References:
- 1.
TVA Letter to NRC, CNL-19-014, Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07), dated February 7, 2019 (ML19038A483)
- 2.
TVA Letter to NRC, CNL-19-106, Supplement to Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) (EPID L-2019-LLA-0020),
dated October 24, 2019 (ML19297F537)
In Reference 1, Tennessee Valley Authority (TVA) submitted a request for an amendment to the Technical Specifications (TS) for Watts Bar Nuclear Plant (WBN) Unit 2. The proposed amendment revises the WBN Unit 2 TS 3.7.8, Essential Raw Cooling Water (ERCW), on a one-time basis to support performance of maintenance on 6.9 kiloVolt (kV) Shutdown Board (SDBD) 1A-A and associated 480 Volt (V) boards and motor control centers (MCC). In Reference 2, TVA submitted a supplement to the proposed amendment request to reflect a change to Note 1 to the proposed new WBN Unit 2 TS 3.7.8, Condition A.
U.S. Nuclear Regulatory Commission CNL-19-113 Page 2 November?, 2019 In the revised Section 3.2.4 of the enclosure to Reference 2, TVA stated:
"While Figure 1 does show ERCW temperatures exceeding 71°F towards the middle to later periods of May, it should be noted that the planned maintenance of the 6,9 kV SDBD 1A-A and associated 480 V boards and MCCs is planned to be completed within the first two weeks of the U1R16 outage following WBN Unit 1 being defueled (i.e., the planned maintenance is planned to be completed by May 7, 2019)."
The quoted paragraph should have staled May 7, 2020, instead of May 7, 2019.
There are no new regulatory commitments associated with this submittal. Please address any questions regarding this request to Kimberly D. Hulvey at (423) 751-3275.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 7th day of November 2019.
Respectfully, jmesT. Polickoski Director, Nuclear Regulatory Affairs cc: