05000259/LER-1980-010-03, /03L-0:on 800129,during Scheduled Refueling Outage,Found That Various Instrument Sensing Line Hangers in HPCI Pump Room Were Broken.Caused by Water Hammer While Warming HPCI Sys.Hangers Repaired

From kanterella
(Redirected from ML19296D457)
Jump to navigation Jump to search
/03L-0:on 800129,during Scheduled Refueling Outage,Found That Various Instrument Sensing Line Hangers in HPCI Pump Room Were Broken.Caused by Water Hammer While Warming HPCI Sys.Hangers Repaired
ML19296D457
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/27/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19296D453 List:
References
LER-80-010-03L, LER-80-10-3L, NUDOCS 8003040614
Download: ML19296D457 (2)


LER-1980-010, /03L-0:on 800129,during Scheduled Refueling Outage,Found That Various Instrument Sensing Line Hangers in HPCI Pump Room Were Broken.Caused by Water Hammer While Warming HPCI Sys.Hangers Repaired
Event date:
Report date:
2591980010R03 - NRC Website

text

-

w

.4HC FORM 365 (7-77)

U. S. NUCLE AR REogetATORY COMMISSION LICENBEE EVE.Nf REcORT CONTROL BLOCK:

l l

l l

l l

(PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION!

l 6

l Al Ll Bl Rl Fl 1l@l 0 0l-l0l0l0l0l0l-l0l0lgl4l1l1l1l1lgl l

[g o

1 F

8 9 LICENSEE CODE is IS LICENSE NUMBER 25 28 LICENSE TYPE JO SF C A T S$

CON'T 3 URN l Lgl 0l5l0l0l0l2l5l9 gj0l1l2l9l l 0 @l0 l 2 l 2 7 l 8 l0 l@

0 2

7 8

60 61 DOCKET NUMBER 68 69 Eb ENT DATE 14 75 REPORT 0 ATE uo EVENT CESCRIPTION AND PROsAsLE CONSEQUENCES h o

2 l With Unit 1 in a scheduled refueling outage it was discovered in the High l Pressure Coolant Injection Pump Room that various instrument sensing line hangers a

3 l were broken. There was no danger to the health or safety of the public, no g

o I

significant resulting occurrences, and no previous similar occurrences. See o

l Technical Specification 3.6.G and 5.6 g

o s

O 7

l l

o a l I

7 8 9 80

  • $'o'E
  1. ^"o

s'8C$$E sdeEof s"NNE

^'

C Co Co *osENrCocE u

o 9

l Cf Jl@ {@ l Al@ l Z l Z l Z l Z lZ l Z j@ ]@ { @

7 8

9 IS it i2 12 18 19 m

SECUENTI AL OCCURRENCE REPORT R E vlsiCN EVENTVEAR REPORT NO.

COct Tv O

h

  • L E P ROl8l0l l_ _l l0l1l0l jfl l0 l3 l l L'El g

g j$At 21 22 23 2e

6

??

23 29 30 31 J.'

TAKEN A T ON ON PL ANT M T HOURS 27

$8 i FOR 8.

$U E

MAN F CTbRER l D lgl34Z l@

lZ lg g@

l0l0[0l l g g j.Y l g Zlg lZl9l9l9y JJ JS 36 37 40 41 42 A3 4A er CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l While warming the High Pressure Coolant Injection system from an out-of-service i

o i j condition, a water hammer was experienced which may have broken the sensing g

, g line hangers. The hangers are being repaired. Other hangers in Units

,, g 2 and 3 were inspected and found undamaged.

g LL.L*.J l

7 8 9 80

$a $

% POWER ofMER $f ATUS D15 O RY OISCOVERY DESCRiPTtON 37

[ h1@ l 0l 0 0 l@l NA l

l l@l Discovered by Maintenance Pei'!fonnel l

i is co'0 RENT ACrive r y AucuNT or ACTivirY h l toCATioN oa RELEAsf h af tEasEo or RELE AsE l

NA l

NA l

1 6

' etaso,/El rxeoSuSEs oEsCRiericN@

NousER rvet FTTil I o 10 0 l@l 9@l NA l

Easow'tiwu'dits oEsCRiPnoN@

Nuen E R 0l0l0lgl NA l

i a

7 8 9 11 12 80 LO'S OF OR DAMAGE TO F ACILITY I Z l@l NI l

> 9 7

8 9 10 80 tmdEutl81 i

DEsc ' TION 1

IIIiiiiiiiiiI:

80030 4 0 (, / %

NAVE OF PREPARER PHONE-

Tennessee Valley Authority Form BF-17 Browns Ferry Nuclear Plant BP 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION r

i BFRO 259 / 80010 Technical Specification Involved 3.6.G & 5.6' Reported Under Technical Specification 6.7.2.b.2 k

Date of Occurrence 1-29-80 Time of Occurrence 2:00pm Unit 1

{

Identification and Description of Occurrence:

b'hile personnel were working in tne urut room, they noticed broken instrument sensing line hangers.

,~

r -

Conditions ~~ Prior to Occurrence:

Unit 1 - scheduled refueling outage i

r-Unit 2 - 79% steady state power Unit 3 - 100% steady state power Action specified in the Technical Specification Surveillanet. Requirements met due to inoperable equipment. Describe.

None Apparent Cause of Occurrence:

~

The operator experienced a water ha=mer while warming the HPCI system from a out-of-service condition which may have broken the sensing line hangers.

Analysis of Occurrence:

There was no danger to health or safety of the public, no damage to plant or equipment, no release of activity, no resulting significant occurrence.

~

Corrective Action

Hangers were repaired. Other hanger in Unit 2 and 3 were inspected and found to be undamaged.

Failure Data:

NA

  • Retention :

eriod - Lifetime; Responsibility - Administrative Supervisor

  • Revision: W