05000259/LER-1980-016-01, /01T-0:on 800210,w/Unit 1 in Scheduled Refueling Outage & Units 2 & 3 at Steady Power,Div of Engineering Design Advised Degradation of Primary Sys Integrity Could Result from Line Break Followed by Sys Drainage

From kanterella
(Redirected from ML19294B158)
Jump to navigation Jump to search
/01T-0:on 800210,w/Unit 1 in Scheduled Refueling Outage & Units 2 & 3 at Steady Power,Div of Engineering Design Advised Degradation of Primary Sys Integrity Could Result from Line Break Followed by Sys Drainage
ML19294B158
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/22/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19294B154 List:
References
LER-80-016-01T, LER-80-16-1T, NUDOCS 8002270364
Download: ML19294B158 (1)


LER-1980-016, /01T-0:on 800210,w/Unit 1 in Scheduled Refueling Outage & Units 2 & 3 at Steady Power,Div of Engineering Design Advised Degradation of Primary Sys Integrity Could Result from Line Break Followed by Sys Drainage
Event date:
Report date:
2591980016R01 - NRC Website

text

=

't.'ennessee Valle. Authority Form BF-17 Browns Ferry Nuclear Plant BF 15. 2 1/10/79 LER StIPPLEMENTAI, INFORMATION h F RO 259 / 5016 Technical Specification Involved 3.7.A.2 Iteported Under Technical S,ecification T. S. 6.7.2.A.9 t

Date of Occurrence 2/10/80 Time of Occurrence 1900 Unit 1, 2, 3 Irkntification and Description of Occurrence TVA Division of Engineering Design notified BFNP that design problems existed whereby, should a recirc line break be followed by a RBCCW line break, the RBCCW system could drain and thereby degrade Primary Containment integrity.

Conditions Prior to Occurrence:

Unit 1 - scheduled refueling outage.

Unit 2 - 1087 MWe steady state.

Unit 3 - 1100 MWe steady state.

Acti;n specified in the Technical Specification Surveillance Requirements met due to inoperable _equigment. Describe.

None.

Apn.tr<;nt Cause.,f Occurronce:

Design deficiency.

Analysis of Occurrence No danger to health or safety of the public, no release of activity, no damage to plant or equipment, no resulting significant occurrence.

Mrective Action :

Procedure change being implemented to isolate RBCCW lines to avoid degradation of Primary Containment integrity in the event of a break in a Recirculation system line of twelve inch or larger.

Failure Data:

NA

  1. D"t en. tion :

Period - Lifetime. H e s po n s ibilit.y - Administrative Supervisor

  • R evision :

\\/

8002270 13 6 9 b