ND-19-1187, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item E.3.9.06.00.04 (Index Number 862)

From kanterella
(Redirected from ML19275G263)
Jump to navigation Jump to search
Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item E.3.9.06.00.04 (Index Number 862)
ML19275G263
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/02/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-19-1187
Download: ML19275G263 (6)


Text

IWichael J. Yox 7825 River Road Regulatory Affairs Director Sk. Southern Nuclear Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tel OCT 0 2 Z019 Docket Nos.: 52-026 ND-19-1187 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 Notice of Uncompieted ITAAC 225-davs Prior to Initial Fuel Load Item E.3.9.06.00.04 [Index Number 8621 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of September 30, 2019, Vogtle Electric Generating Plant(VEGP) Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item E.3.9.06.00.04 [Index Number 862] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox {/

Regulatory Affairs Difector Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 4 Completion Plan for Uncompleted ITAAC E.3.9.06.00.04 [Index Number 862]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-19-1187 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. P. P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Requlatorv Commission Mr. W. Jones(w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. 8. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authorltv of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

U.S. Nuclear Regulatory Commission ND-19-1187 Page 3 of 3 Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Orlani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernlzan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-19-1187 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-1187 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 4 Completion Plan for Uncompleted ITAAC E.3.9.06.00.04[Index Number 862]

U.S. Nuclear Regulatory Commission ND-19-1187 Enclosure Page 2 of 3 ITAAC Statement Program Commitment 6.4 The means exists to acquire and evaluate meteorological Information. [1.5]

Inspectlons/Tests/Analvses 6.4 A test will be performed to verify the ability to access meteorological Information In the TSC and control room.

Acceptance Criteria 6.4 The following parameters are displayed In the TSC and control room:

  • Wind speed (at 10 and 60 meters)
  • Wind direction (at 10 and 60 meters)
  • Standard deviation of horizontal wind direction (at 10 meters)
  • Vertical temperature difference (between 10 and 60 meters)
  • Ambient temperature (at 10 meters)
  • Dew-point temperature (at 10 meters)
  • Precipitation (at the tower base)

ITAAC Completion Description A test Is performed to demonstrate that the means exists to acquire and evaluate meteorological Information by verifying the ability to access meteorological Information In the Technical Support Center(TSC) and the VEGP Unit 4 control room.

The test Is performed using Procedure XXX, Meteorological Information Verification,(Reference

1) and verifies the following parameters are displayed In the TSC and the VEGP Unit 4 control room:

Wind speed (at 10 and 60 meters)

Wind direction (at 10 and 60 meters)

Standard deviation of horizontal wind direction (at 10 meters)

Vertical temperature difference (between 10 and 60 meters)

Ambient temperature (at 10 meters)

Dew-point temperature (at 10 meters)

Precipitation (at the tower base)

The results of the test are documented In Reference 1 and confirm that the following parameters are displayed In the TSC and the VEGP Unit 4 control room:

U.S. Nuclear Regulatory Commission ND-19-1187 Enclosure Page 3 of 3 Wind speed (at 10 and 60 meters)

Wind direction (at 10 and 60 meters)

Standard deviation of horizontal wind direction (at 10 meters)

Vertical temperature difference (between 10 and 60 meters)

Ambient temperature (at 10 meters)

Dew-point temperature (at 10 meters)

Precipitation (at the tower base)

Reference 1 is available for NRG inspection as part of the Unit 4 ITAAC E.3.9.06.00.04 Completion Package (Reference 2).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

References(available for NRG inspection)

1. Procedure XXX, Meteorological Information Verification
2. E.3.9.06.00.04-U4-CP-Rev0, ITAAC Completion Package
3. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"