MONTHYEARNL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 Project stage: Request AEP-NRC-2020-23, Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2020-04-30030 April 2020 Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography Project stage: Request ML20126G4572020-04-30030 April 2020 Request for Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography Project stage: Request AEP-NRC-2020-10, Unit 2, Application to Revise Technical Specification to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2020-04-30030 April 2020 Unit 2, Application to Revise Technical Specification to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position Project stage: Request ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds Project stage: Acceptance Review ML20366A1342021-01-13013 January 2021 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques Project stage: Other 2020-04-30
[Table View] |
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0672, Licensee Guarantees of Payment of Deferred Premiums2023-08-10010 August 2023 Licensee Guarantees of Payment of Deferred Premiums NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0584, Preservice Inspection Program Owner'S Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owner'S Activity Report NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0541, Inservice Inspection Program Owners Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owners Activity Report for Outage 1R24 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0455, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2023-06-12012 June 2023 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0398, Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-05-16016 May 2023 Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0326, Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-1082023-05-0101 May 2023 Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 2024-01-30
[Table view] Category:Report
MONTHYEARML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ML24005A1142024-01-0505 January 2024 Recommendation for 2023-301 Cr/Sim 3 (Emergency Depress the Reactor Using Main Steam Line Drains) ND-23-0025, Compliance with Order EA-12-0492023-08-21021 August 2023 Compliance with Order EA-12-049 ML22348A0932023-07-28028 July 2023 Finding That the Acceptance Criteria in the Combined License Are Met ML22348A0882023-07-25025 July 2023 VEGP Unit 4 - 103g - Basis Document ML23184A0472023-07-0303 July 2023 Dashboard Report 7-3-2023 ML23156A1882023-06-0505 June 2023 Construction Reactor Oversight Process Resources Report June 5, 2023 ML23121A0392023-05-0101 May 2023 Dashboard Report 5-1-2023 ML23003A0412023-01-0303 January 2023 Construction Reactor Oversight Process Resources Report January 3, 2023 ND-22-0817, Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection2022-11-0404 November 2022 Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection ND-22-0831, (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 12022-10-31031 October 2022 (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1 ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22215A0962022-08-0303 August 2022 Construction Reactor Oversight Process Resources Report August 3, 2022 ML22214A0072022-08-0101 August 2022 Archives ML20290A2762022-08-0101 August 2022 10CFR52.103(g) Basis Document NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML22179A1462022-06-15015 June 2022 Tier 1, Revision 10, Updated Through 04/22/2022 ML22159A1712022-06-0808 June 2022 Construction Reactor Oversight Process Resources Report June 8, 2022 ML22131A0502022-05-11011 May 2022 Construction Reactor Oversight Process Resources Report May 11, 2022 ML22089A0412022-03-30030 March 2022 Construction Reactor Oversight Process Resources Report March 30 2022 ND-22-0003, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2022-01-0606 January 2022 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report A000412, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2021-12-0202 December 2021 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application ND-21-1003, Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement2021-11-12012 November 2021 Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement ND-21-0991, Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load2021-11-0505 November 2021 Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load ML21280A3052021-10-0707 October 2021 Q/2020 Performance Summary ML21280A3042021-10-0707 October 2021 Q 2020 Performance Summary ML21277A0762021-10-0404 October 2021 Vog 4 Dashboard 10-4-2021 ND-21-0848, Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised)2021-10-0101 October 2021 Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised) IR 05000424/20210052021-08-25025 August 2021 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2021005 and 05000425/2021005) ML21214A3182021-08-0202 August 2021 301 Comments ND-21-0603, Electrical Construction and Measuring & Test Equipment Control2021-06-25025 June 2021 Electrical Construction and Measuring & Test Equipment Control ML21179A0972021-06-15015 June 2021 to Tier 1 ML21132A0482021-05-12012 May 2021 Construction Reactor Oversight Process Resources Report May 2021 ML21118A1162021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtle Unit 3 ND-21-0342, Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 42021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 4 ML21090A2092021-03-31031 March 2021 Construction Reactor Oversight Process Resources Report March 2021 ML21040A1672021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Westinghouse Non-Proprietary Technical Description of the Flaw Tolerance Evaluation Conducted on the Subject Weldolet Branch Connections ML20358A1822020-12-31031 December 2020 LTR-SDA-20-096-NP, Revision 1, Flaw Tolerance Evaluation to Assess Lack of Inspection Coverage of AP1000 14 X 4 Stainless Steel Weldolets to Pipe Welds NL-20-1295, 10 CFR 71.95 Report on Non-Compliance Involving Radwaste Cask 3-60B2020-12-14014 December 2020 10 CFR 71.95 Report on Non-Compliance Involving Radwaste Cask 3-60B ML20343A0672020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20314A0492020-11-0909 November 2020 Construction Reactor Oversight Process Resources November 2020 ND-20-1220, Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan2020-10-21021 October 2020 Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan ML20287A1862020-10-13013 October 2020 Construction Reactor Oversight Process Resources October 2020 ML20303A1782020-09-29029 September 2020 Submittal of Revision 38 to Updated Final Safety Analysis Report NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20274A2582020-09-10010 September 2020 Wp on Uswc for AP1000_Revised, Reactor Oversight Process Whitepaper - Modification of the Description of Unplanned Scrams with Complications Performance Indicator to Reflect AP1000 Design ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)2020-07-28028 July 2020 Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) 2024-01-08
[Table view] Category:Technical
MONTHYEARML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ND-23-0025, Compliance with Order EA-12-0492023-08-21021 August 2023 Compliance with Order EA-12-049 ML22348A0882023-07-25025 July 2023 VEGP Unit 4 - 103g - Basis Document ML23156A1882023-06-0505 June 2023 Construction Reactor Oversight Process Resources Report June 5, 2023 ML23121A0392023-05-0101 May 2023 Dashboard Report 5-1-2023 ML23003A0412023-01-0303 January 2023 Construction Reactor Oversight Process Resources Report January 3, 2023 ND-22-0817, Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection2022-11-0404 November 2022 Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML20290A2762022-08-0101 August 2022 10CFR52.103(g) Basis Document NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML22179A1462022-06-15015 June 2022 Tier 1, Revision 10, Updated Through 04/22/2022 ML22159A1712022-06-0808 June 2022 Construction Reactor Oversight Process Resources Report June 8, 2022 ML22089A0412022-03-30030 March 2022 Construction Reactor Oversight Process Resources Report March 30 2022 ND-22-0003, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2022-01-0606 January 2022 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report A000412, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2021-12-0202 December 2021 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application ND-21-0848, Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised)2021-10-0101 October 2021 Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised) ML21179A0972021-06-15015 June 2021 to Tier 1 ML21132A0482021-05-12012 May 2021 Construction Reactor Oversight Process Resources Report May 2021 ML21118A1162021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtle Unit 3 ND-21-0342, Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 42021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 4 ML21090A2092021-03-31031 March 2021 Construction Reactor Oversight Process Resources Report March 2021 ML21040A1672021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Westinghouse Non-Proprietary Technical Description of the Flaw Tolerance Evaluation Conducted on the Subject Weldolet Branch Connections ML20358A1822020-12-31031 December 2020 LTR-SDA-20-096-NP, Revision 1, Flaw Tolerance Evaluation to Assess Lack of Inspection Coverage of AP1000 14 X 4 Stainless Steel Weldolets to Pipe Welds NL-20-1295, 10 CFR 71.95 Report on Non-Compliance Involving Radwaste Cask 3-60B2020-12-14014 December 2020 10 CFR 71.95 Report on Non-Compliance Involving Radwaste Cask 3-60B ND-20-1220, Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan2020-10-21021 October 2020 Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan ML20303A1782020-09-29029 September 2020 Submittal of Revision 38 to Updated Final Safety Analysis Report NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20274A2582020-09-10010 September 2020 Wp on Uswc for AP1000_Revised, Reactor Oversight Process Whitepaper - Modification of the Description of Unplanned Scrams with Complications Performance Indicator to Reflect AP1000 Design ND-20-0561, Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report2020-07-10010 July 2020 Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report ML20189A4292020-07-0707 July 2020 Construction Reactor Oversight Process Resources July 2020 ML20136A4562020-04-30030 April 2020 Updated Flex Plan Nuclear Regulatory Commission Order EA-12-049 Strategies for Beyond Design Basis External Events NL-19-0832, EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections.2019-12-31031 December 2019 EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections. NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. ND-19-0356, Pressurized Thermal Shock (PTS) Evaluation2019-04-10010 April 2019 Pressurized Thermal Shock (PTS) Evaluation ND-19-0665, (VEGP) Units 3 and 4 - WCAP-15927-NP, Design Process for AP1000 Common Q Safety Systems, Revision 7 (Public Version)2019-03-21021 March 2019 (VEGP) Units 3 and 4 - WCAP-15927-NP, Design Process for AP1000 Common Q Safety Systems, Revision 7 (Public Version) ML19038A4632019-02-0707 February 2019 Construction Reactor Oversight Process Resources ML18275A0402018-10-31031 October 2018 Technical Evaluation Report: Use of BADGER and Narwhal to Compute Strainer Failure Probability - Vogtle Units 1 and 2 Nuclear Power Plant NL-18-0684, Fukushima Near-Term Task Force Recommendation 2.1: Seismic Supplemental Information Regarding NEI 12-06. Appendix H. Revision 4. H.4.5 Path 5 Mitigating Strategies Assessment (MSA) Report2018-06-25025 June 2018 Fukushima Near-Term Task Force Recommendation 2.1: Seismic Supplemental Information Regarding NEI 12-06. Appendix H. Revision 4. H.4.5 Path 5 Mitigating Strategies Assessment (MSA) Report NL-18-0282, Enclosure 1: NFPA 805 LAR Transition Report for Edwin I. Hatch2018-04-0404 April 2018 Enclosure 1: NFPA 805 LAR Transition Report for Edwin I. Hatch NL-17-1916, Pressure and Temperature Limits Report2017-11-27027 November 2017 Pressure and Temperature Limits Report ML18012A0582017-10-31031 October 2017 NEDO-33884, Revision 0, Gnf Fecrai ATF Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1. NL-18-0026, NEDO-33884, Revision 0, Gnf Fecrai Atf Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.2017-10-31031 October 2017 NEDO-33884, Revision 0, Gnf Fecrai Atf Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1. NL-18-0026, NEDO-33884, Revision 0, Gnf Fecrai ATF Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.2017-10-31031 October 2017 NEDO-33884, Revision 0, Gnf Fecrai ATF Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1. NL-18-0026, NEDO-33883, Revision 0, Gnf Armor Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.2017-09-30030 September 2017 NEDO-33883, Revision 0, Gnf Armor Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1. NL-17-1255, Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope High Frequency Confirmation Evaluation2017-08-22022 August 2017 Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope High Frequency Confirmation Evaluation NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS NL-16-2466, Fukushima Near-Term Task Force Recommendation 2.1 Expedited Seismic Evaluation Process Report Completion2016-12-15015 December 2016 Fukushima Near-Term Task Force Recommendation 2.1 Expedited Seismic Evaluation Process Report Completion NL-16-1136, Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope Low Frequency Evaluation2016-08-10010 August 2016 Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope Low Frequency Evaluation 2024-01-08
[Table view] |
Text
A Southern Nuclear Cheryl A. Gayheart Regulatory Affairs Director 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5316 tel cagayhea@southernco.com September 30,2019 Docket No.: 50-424 50-348 50-321 NL-19-0674 50-425 50-364 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Units 1&2 Joseph M. Farley Nuclear Plant Units 1&2 Vogtle Electric Generating Plant Units 1&2 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI. Division 1 Ladies and Gentlemen:
Pursuant to 10 CFR 50.55a(z)(1), Southern Nuclear Operating Company (SNC) hereby requests Nuclear Regulatory Commission (NRC) approval of proposed Alternative GEN-ISI-ALT-2019-01. The ASME Section XI Code requires that certain ferritic and austenitic pipe welds be examined using radiographic examination techniques to satisfy nondestructive examination requirements.
SNC requests approval to use encoded Phased Array Ultrasonic Examination Techniques (PAUT) in accordance with ASME Section XI Code Case N-831-1, Ultrasonic Examination In Lieu of Radiography for Welds in Ferritic or Austenitic Pipe, as an alternative to radiographic examination. SNC considers the proposed alternative would provide an acceptable level of quality and safety. Enclosure 1 to this letter provides the basis for the proposed alternative.
NRC review and approval of the proposed alternative is respectfully requested by September 30, 2020. This timeline will support anticipated piping repair and replacement activities for the next upcoming refueling outages, currently scheduled to occur during fall 2020.
This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205.992.6611.
U. S. Nuclear Regulatory Commission NL-19-0674 Page 2 Respectfully submitted, art Regulatory Affairs Director CAG/DSP/sm ENCLOSURE: Proposed Alternative GEN-ISI-ALT-2019-01 Cc: Regional Administrator, Region II NRR Project Manager- Farley, Hatch, Vogtle 1 & 2 Senior Resident Inspector- Farley, Hatch, Vogtle 1 & 2 RTYPE: CGA02.001
Edwin I. Hatch Nuclear Plant - Units 1 and 2 Joseph M. Farley Nuclear Plant - Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 Enclosure Proposed Alternative GEN-ISI-ALT-2019-01
Enclosure to NL-19-067 4 Proposed Alternative GEN-ISI-ALT-2019-01 10 CFR 50.55a Request No. GEN-ISI-ALT -2019-01 Implementation of Code Case N-831-1 Farley, Vogtle, and Hatch Nuclear Plants Units 1 and 2 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1)
Acceptable Level in Quality and Safety
- 1. ASME Code Component(s) Affected American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel (B&PV) code,Section XI ferritic and austenitic piping welds requiring radiography during repair/replacement activities.
- 2. Requested Date for Approval Approval is requested by September 30, 2020.
3. Applicable Code Edition and Addenda
The following table identifies the ASME Section XI Code of Record for performing lnservice Inspection (lSI) activities at each applicable Southern Nuclear (SNC) site.
Interval lSI ASME Section XI Interval Plant Interval Edition/Addenda Scheduled Start End Farley Nuclear Plant, 2007 Edition/2008 5 12/01/2017 11/30/2027 Units 1 and 2 Addenda Hatch Nuclear Plant, 2007 Edition/2008 5 01/01/2016 12/31/2025 Units 1 and 2 Addenda Vogtle Nuclear Plant, 2007 Edition/2008 4 05/31/2017 05/30/2027 Units 1 and 2 Addenda
- 4. Applicable ASME Code Requirements The 2007 Edition through the 2008 Addenda of ASME Section XI, paragraph IWA-4221 requires that items used for repair/replacement activities meet the applicable Owner's Requirements and Construction Code requirements when performing repair/replacement activities. IWA-4520 requires that welded joints made for fabrication or installation of items be examined in accordance with the Construction Code identified in the Repair/
Replacement Plan.
5. Reason for Request
Replacement of piping is periodically performed in support of the Flow Accelerated Corrosion (FAC) Program as well as other repair/replacement activities. The use of encoded Phased Array Ultrasonic Examination Techniques (PAUT) in lieu of radiography (RT) to perform the required examinations of fabrication, installation, or repair welds would eliminate the safety risk associated with performing RT, which includes both planned and unplanned radiation exposure to plant workers. PAUT also minimizes the impact on other outage activities normally involved with performing RT such as limited access to work locations. In addition, encoded PAUT is equivalent or superior to the code-required RT E-1
Enclosure to NL-19-0674 Proposed Alternative GEN-ISI-ALT-2019-01 examination for ASME ferritic and austenitic piping repair/replacement welds for detecting and sizing critical (planar) flaws such as cracks and lack of fusion. PAUT provides sizing capabilities for both depth and length dimensions of the flaw, which are required to apply the acceptance criteria of the applicable code case. RT does not provide depth sizing capabilities. This proposed alternative is requested to support both planned and unplanned piping repair and replacement activities.
- 6. Proposed Alternative The use of encoded PAUT is proposed in lieu of the code-required RT examination for ASME ferritic and austenitic piping repair/replacement welds. Similar techniques are being used throughout the nuclear industry for examination of dissimilar metal welds, overlaid welds, as well as other applications including 831.1 piping replacements. This proposed alternative request includes requirements that provide an acceptable level of quality and safety that satisfies the requirements of 10 CFR 50.55a(z)( 1). The capability of the alternative technique is comparable to the examination methods documented in the ASME Code Sections Ill, VIII, and IX, and associated code cases (References 9.1, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 9.10, 9.11, 9.12, and 9.13) using ultrasonic examination techniques for weld acceptance. The examinations will be performed using procedures, equipment, and qualified personnel as defined in ASME Code Case N-831-1. The RMS Grading equation, as shown in the 2007 Edition through the 2008 Addenda of ASME Section XI, Article Vlll-3120(d), will be utilized in lieu of the incorrect equation in Section 7(d) of N-831-1.
II
~ (111; - f;)~ll/2 RMS =
[ 1
-'=- - - -
where m; = measured flaw size f; = true flaw size n = number of flaws measured 6.1 Basis for Use The basis for this proposed alternative is that PAUT is equivalent or superior toRT for detecting and sizing critical (planar) flaws. In this regard, the basis for the proposed alternative was developed from numerous codes, code cases, associated industry experience, articles, and the results of RT and encoded PAUT examinations. The examination procedure and personnel performing examinations are qualified using representative piping conditions and flaws that demonstrate the ability to detect and size flaws that are both acceptable and unacceptable to the defined acceptance standards.
The demonstrated ability of the examination procedure and personnel to appropriately detect and size flaws provides an acceptable level of quality and safety alternative as allowed by 10 CFR 50.55a(z)(1 ).
It should also be noted that Code Case N-831 (Revision 0), which provides rules for performing ultrasonic examination of welds in ferritic piping in lieu of RT, is listed in Table 2, "Conditionally Accepted Section XI Code Cases," of Draft Regulatory Guide DG-1342. As stated in the Proposed Rule published in Vol. 83, No. 159 of the Federal Register, dated E-2
Enclosure to NL-19-0674 Proposed Alternative GEN-ISI-ALT-2019-01 Thursday, August 16, 2018, The NRC finds the Code Case acceptable with the condition that it is prohibited for use in new reactor construction."
- 7. Duration of Proposed Alternative Use of the proposed alternative is requested for the duration of the lSI intervals identified in Section 3.
- 8. Precedents 8.1 Palo Verde Nuclear Generating Station Relief Request 48, dated August 1, 2012 (ML12229A046). NRC approval dated April12, 2013 (ML13091A177).
8.2 Millstone Power Station Unit 2 Alternative Request RR-04-16, dated August 1, 2013 (ML13220A019). NRC approval dated April4, 2014 (ML14091A973).
8.3 Millstone Power Station Unit 2 Alternative Request RR-04-21, dated October 6, 2014 (ML14283A128). NRC approval dated September 21, 201S (ML 1S2S7ADOS).
8.4 Millstone Power Station Unit 3 Alternative Request IR-3-2S, dated October 6, 2014 (ML14283A128). NRC approval dated September 21, 201S (ML 1S2S7ADOS).
8.5 Millstone Power Station Unit 2 Alternative Request RR-04-023, dated April 11, 2016 (ML 161 06A 1OS). NRC approval dated January 23, 2017 (ML16363A089).
8.6 Millstone Power Station Unit 3 Alternative Request IR-3-28, dated April 11, 2016 (ML 16106A10S). NRC approval dated January 23, 2017 (ML16363A089).
8.7 Millstone Power Station, Units 2 and 3; North Anna Power Station, Units 1 and 2; and Surry Power Station, Units 1 and 2; Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination, dated June 29, 2017 (ML17188A379). NRC approval dated January 24, 2018 (ML 18019A 19S).
8.8 Millstone Power Station, Units 2 and 3; Proposed Alternative Requests RR-04-27 and IR-3-38, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography, dated February 28, 2018 (ML 18066AS22). NRC approval dated September 17,2018 (ML182S2A003).
8.9 Surry Power Station, Units 1 and 2; Proposed Alternative Requests S1-1S-ISI-04 and S2-1S-ISI-04, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography, dated April 11, 2018 (ML 181 DBA 123). NRC approval dated September 26, 2018 (ML18236A236).
8.10 South Texas Project, Units 1 and 2; Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography; Relief Request RR-ENG-3-22, dated December 12, 2017 (ML173468279). NRC approval dated July 24, 2018 (ML18187A149).
8.11 Exelon Generation Company, LLC, "Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques In Lieu of Radiography," dated November 2, 2016 and amended by letter dated March 13, 2017 (ML 16307A2S3 and ML 17072A38S respectively). NRC approval dated June S, 2017 (ML 171SOA091 ).
E-3
Enclosure to NL-19-0674 Proposed Alternative GEN-ISI-ALT-2019-01
- 9. References 9.1 ASME Section Ill Code Case N-659-2, "Use of Ultrasonic Examination in Lieu of Radiography for Weld Examination Section Ill, Divisions 1 and 3," dated June 9, 2008.
9.2 Pacific Northwest National Laboratory Report PNNL-19086, "Replacement of Radiography with Ultrasonics for the Nondestructive Inspection of Welds- Evaluation of Technical Gaps- An Interim Report," dated April 2010.
9.3 ASME B31.1, Case 168, "Use of Ultrasonic Examination in Lieu of Radiography for B31.
1 Application," dated June 1997.
9.4 ASME Section Ill, Code Case N-818, "Use of Analytical Evaluation approach for Acceptance of Full Penetration Butt Welds in Lieu of Weld Repair," dated December 6, 2011.
9.5 ASME Code Case 2235-9; "Use of Ultrasonic Examination in Lieu of Radiography Section I,Section VIII, Divisions 1 and 2, and Section XII," dated October 11, 2005.
9.6 Journal of Pressure Vessel Technology, Technical Basis for ASME Section VIII Code Case 2235 on Ultrasonic Examination of Welds in Lieu of Radiography;" Rana, Hedden, Cowfer and Boyce, Volume 123, dated August 2001.
9.7 ASME Code Case 2326, "Ultrasonic Examination in Lieu of Radiographic Examination for Welder Qualification Test CouponsSection IX," dated January 20, 2000.
9.8 ASME Code Case 2541 , "Use of Manual Phased Array Ultrasonic Examination Section V," dated January 19, 2006.
9.9 ASME Code Case 2558, "Use of Manual Phased Array E-Scan Ultrasonic Examination Per Article 4 Section V, dated December 30, 2006.
9.10 ASME Code Case 2599, "Use of Linear Phased Array E-Scan Ultrasonic Examination Per Article 4 Section V," dated January 29, 2008.
9.11 ASME Code Case 2600, "Use of Linear Phased Array S-Scan Ultrasonic Examination Per Article 4 Section V," dated January 29, 2008.
9.12 ASME Section XI, Code Case N-713, "Ultrasonic Examination in Lieu of Radiography,"
dated November 10, 2008.
9.13 ASME Section XI, Code Case N-831, "Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic Pipe," dated October 20, 2016.
9.14 ASME Section XI, Code Case N-831-1, "Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe," dated July 25, 2018.
9.15 US NRC, NUREG/CR-7204, "Applying Ultrasonic Testing in Lieu of Radiography for Volumetric Examination of Carbon Steel Piping" (ML15253A674).
9.16 Technical Basis for Substituting Ultrasonic Testing for Radiographic Testing for New, Repaired, and Replacement Welds for ASME Section XI, Division 1, Stainless Steel Piping. EPRI, Palo Alto, CA: 2017. 3002010297 E-4