LER 79-013/01T-0 on 790131:scram Received on Intermediate Range Monitor hi-hi Trip.Caused by Favorable Conditions During Startup for High Rod Worth Near Criticality
ML19270F559
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/09/1979
From: Thomas Greene
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19270F556 List:
References
LER-79-013-01T, LER-79-13-1T, NUDOCS 7902150440
Download: ML19270F559 (3)


Text

. . . . . . . . . - - . . . . . . . . . . . .......

f t.77)

L!CENSEE EVENT REPORT coNinot otoCx: l l l l l l l (PLEASE PRINT OR TYPE ALL REQU1HED INFOnMATION)

. 1 e@

lo li j l G l A l E lI ["H l1 l@l010 l- 10 l01010 l0 l- 10 l0 l@l4 l1 l1 l1 l1 @l l l@

7 8 9 LICE?.SE E CODE 14 15 LicEbst NUMutH 25 26 LICENSE 1 YPE JO 57 CA T 'A con'T lolil 7 8 5/ $ l 00 L l@l 610 l 5 0COCKET l010131211 NUYGEH 68

}@l00')

ll EVENT 13 IlDATE1719 l@l01210191719 74 75 REPORT DATE l@

80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h FoTTll o At 2135 CST, while approaching criticality with a moderator terroerature of 199.50F i o 3 and with effectively zero Xenon inventory, a scram was received on IRM Hi-Hi Trip. I o 4 l This was the result of a criticality with a period of less than five seconds. The l o 5 l scram occurred at notch 26 of rod 42-15 which was the 39th rod to be withdrawn in the]

o e I sequence. This is being reported under Tech Spec Section 6.9.1.2.a.4.c. I O / I , I o a i I 7 8 9 60 SYSTEM CAUSE CAUSE C O*.1 P. VALVE CODE COCE SUSCODE CCvPONENT CODE SUSCODE SUBCODE 7

O 9 8

lR Bl@ W @ ]Xl@

9 10 11 12 13 ZlZjZlZlZlZl@

16 19 l@ U @ 2J SEQUENTI AL OCCURRENCE REPORT REVISION LER EVEN T YE AR RE POHT NO. CODE TYPE N O.

@ ,g/RO

_ 26

[7 l 9 Jil l-l 23 1011l3l 24 26 l/l 21 l011l 28 29 lT l 30 l-l l0l 31 JJ TA Ef A TO ON PL ANT r _T HOURS 22 SI IT D F R1 LB. S PPLIE MA FA T AEA lXl@lZl@

33 34 I35C l@ lCl@

36 l0l0l1l 3/ 40 l [__j @

41 42 Nl@ lZl@

43 44 Z l 9 [ 9 l 947 l@

CAUSE CESCniPTlCN Afv0 COnaECTIVE ACTIONS h i e 1 Xenon inventory, moderator temnerature and other conditions present durina the start-l L' LiJ l up were favorable for a hich rod worth noar criticality.

__ Reactor conditions wern I i 2 ] altered, i.e. moderator temoerature was increased.and during the subsequent start- l i , l up the control rods near criticality were notched out until the reactor was criti- I i 4 l cal. Analysis on the probable cause is still bein9 conducted and (continued) l 7 8 9 80

$1A S *.POV. E H OTHEHSTATUS blS HY DISCOVEHY DESCRIPTION ltl51lCl@ l01010]@ N/A l [A_j@l Onerational event l A 11VI T Y CO TENT note eEn Or RELE ASE AMOUNT OF ACTIVITY LOCATION OF HELE ASE Wij8 Lt]@

7 9 lLJ@l10 11 N/A 44 l l 45 N/A I 80 PE n".ONNE L E XPOSU5'E" P; U *.'h E n TYPE DESCHIPTION i i 101010j@lZl@l n/A

' r os m. .a '<' ,N ,u',i, E S

  • Nm etn otSciiieTio e@

lilI[0l0lol81 J d 9 11 12 n/A 60 I

L OSS Or Gi1 DA'.' ACE TO F ACILITY Tyre OL Sc h t r :10. .

W21l1J8L_ d 3 n/^ l 7 10 rw B0 IMt t LI M P T if>'d ='-

o

))8 UditSI nA I IIIIIIIii!IiI" 7 9 10 (. B (P) 80 E NAME Of PHEPAnEn rccnc' Su t* P1t* Eng" Ser*

PHONE:

Georgia Power Company Plant E. I. Hatch Baxley, Ga. 31513 Reportable Occurrence Report tio. 50-321/1979-13 Cause Description and Corrective Actions continued:

notch mode will be employed for groups 3 and 4 until the analysis is complete.

An update report will follo'a within 60 days.

4 S

e e

. ) .

NARRATIVE SUM:tARY At 2135 CST, while approaching criticality with a moderator temperature of 199.50F and with ef fectively zero Xenon ir,ventory, a scram was received on IRM Hi-Hi Trip. This was the result of a criticality with a period of less than five sec-onds. The scram occured at notch 26 of rod 42-15 which was the 39th rod to be withdrawn in the sequence. Xenon inventory, moderator temperature, and other conditions present during the startup were favorable for a high rod worth near cri ticali ty.

Reactor conditions were altered, i.e. moderator temperature was increased, and the control rods near the subsequent criticality were notched out until the reactor was critical. Analysis on the probable cause is still being conduct-ed and notch mode will be employed during startup for groups 3 and 4 until the analysis is completed, at which time a final decision will be made. This is being reported under Tech. Spec. Section 6.9.1.z.a.4.c