ML19253B059

From kanterella
Jump to navigation Jump to search
LER 79-011/03X-1:on 790214,during Normal Operation,Drywell Atmospheric Sample Isolation Valve 27-SOV-123B Not Indicated Open.Caused by Blown Fuse Due to Shorted Valve Solenoid. Solenoid & Flux Washer Replaced
ML19253B059
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/11/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19253B056 List:
References
LER-79-011-03X, LER-79-11-3X, NUDOCS 7909140433
Download: ML19253B059 (2)


Text

l 1)

LICENSEE EVENT REPORT CONTFOL BLOCK: l l l l l l l PLEASE PRINT OR TYPE ALL REQUIRED INFORMATIONI

. i e pp 8 9 NlYlJlAlFj1 gl0l0l-l0l0l0l0j-l0l0l0 14 l4 jl l1 j l l1 g g i LICENSEE CODE 15 LICENSE NUYdEH h 26 LICENSE syPE JO $1 CAT $8 CON'T 7

o i 8

,{,y Ll@l0l5l0[0l0[3l3l3 g 0l2jll4l7l9 gl0l9[1l1l7l9[g 60 61 DOCKET Nuvt3EH t,d 69 EVENT DATE 14 75 REPORT D ATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o12 l Please See Attachment  ;

O 3 l l o 4 l l l0j5l { l 0 l6 l l 0 7 l j 0 H l 7 8 9 00 SYSTEM CAUSE CAUSE L OY P. VALV*

CODE CCDE SUBCODE OMP NE CO E SU8 CODE SUB OOE O 9 l l l l l l l l l l l l l 7 8 9 10 11 12 13 la 19 20

- SE QUEN TI AL OCCU R P E NCE REFORT REVISION LE A RO EVENT YE AR HEPORT NO. CCCJ T PE N C.

@R af l7 [9 l

_21 22 l__l 23

[0l1l1j 24 46 jfl 21 28 0 ja l 29 30 b l1 l 31 32 TAKE . TO O' PLA T ETH HOURS 22 S B ITT O FOH 9 B $U PLIE MAN FACT RER lBl@lCl@

3J 34 WQ 35 lZl@

36 l 0 l0 l0 ul lY [g 3/ 40 41 l Y[g lA lg 42 43 lA 44 5

l 3 l 5lg 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i o l Flease See Attachment I li lil l I I 2 l 1 3 i A I I 7 8 9 80 F ACILITY , METHOD OF ST TUS *

. PO J E R OTH STATUS DISC VERY I b I"gg'gg'ylON A TIVITY CO TENT RELEASED OF R AYOUN T OF gTIVITY LOCATION OF RELE ASE i c lij (E) ,'J LE ASEl@ l I J 8 9 10 11 44 43 80 PE RSONNE L F XPOSUR E",

NU HE TXPE DESCHiPTION i 7 lo l lglc lgl .

l

~

PERSONNE L INJURIES NA 7 (] / ~' (il l , l 3 l l 0[d"["O [g '5C"#" l l 7 8 9 11 12

^

80 LOSS OF CR DAVAGE TO F ACILITY 7 r (' 1 ( /]'XQ O NO T DE SCniP T ION 6 "^ i j,3j I ! ,+ (C  :

- ll l l! ' ' [ WIN l' l 91 7 8 9 I {El@l to IUl'

-~ -- -

! !! ' ! 1 -

l 80 PUBLICITY '

IS"iED DESCRIPTION NRC USE ONLY

  • NA

!2 loll

_181 I IIiltiliiliIII 1

  • W. Verne Childs II5 142-3840 l NAME OF PREPARER PHONE: "

7 00914 0 t-/8S

POWER AUT110RITY OF Tile STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACilMENT TO LER 79-011/03X-1 Page 1 of 1 During normal operation, Operations Personnel noted that the Drywell Atmospheric Sample Isolation Valve 27-SOV-123B, did not indicate open.

Investigation revealed a blown fuse due to a shorted valve solenoid. The valve fails in the closed position on loss of electric power and in addition the other isolation valve in the same sample line (27-SOV-123A) was placed in closed position and verified shut on a daily basis as required by Tech-nical Cpecification Appendix A, Paragraph 4.7.D.2.

Following replacement of solenoid, the valve operated properly until March 6, 1979 at which time the solenoid again shorted and blew its control power fuse. Again the other isolated valve in the same lina was placed in the closed position and verified closed on a daily basis in accordance with the specification referenced above. Thus, the event does not represent any hazard to the public health and safety.

Since several other drywell atmospheric sample streans are availabic for service, this sampic line remained isolated until the next plant shut down which allowed internal inspection of the valve.

During the plant shutdown for seismic re-analysis, the valve was disassembled, inspected, and the solenoid coil was replaced. Additional investigation and monitoring revealed that the valve's solenoid coil operating current was approx-imately 1.0 amperes compared to approximately 0.6 amperes for similar valve solenoid coils. A new valve was ordered to allow replacement of the entire valve at the next convenient time. On September 2,1979, the valve solenoid coil again shorted and caused the fuse to blow. While preparing to replace the valve, personnel noted that the new valve solenoid assembly included a " Flux Washer" that was not present in the installed solenoid. Re-examination of the appropriate drawings revealed that the flux washer was indicated as part of the assembly. Installation of a new solenoid coil and flux washer reduced the operating current to approximately 0.6 amperes. Since other similar valves have similar operating currents, no additional inspection / disassembly of these components is considered necessary.

NOTE: Revision 1 of this LER is submitted to update the cause description and corrective action section of the LER. The revision also includes the reporting of the September 2,1979 failure in addition to the failures of February 14 and March 6,1979 which were reported on the original issue of the LER.