GO2-19-129, Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies Buckets
(Redirected from ML19247C581)
Jump to navigation
Jump to search
| ML19247C581 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/03/2019 |
| From: | Dittmer J Energy Northwest |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GO2-19-129 | |
| Download: ML19247C581 (4) | |