ML19246B397

From kanterella
Jump to navigation Jump to search
LER 78-093/03X-1 on 781202:while Inserting Control Rods to Decrease Reactor Power,Operator Observed That Position Indication for Notch 18 & 28 Was Inoperable for Rod 2-23. Caused by Grounding on Switch 48.Switch Covered W/Tape
ML19246B397
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/09/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19246B395 List:
References
LER-78-093-03X, LER-78-93-3X, NUDOCS 7907130363
Download: ML19246B397 (1)


Text