mv 1 n onen In Reply Refer To:
Docket: 50-602/89-02 l
'
.
University of Texas College of Engineering
,
Department of Mechanical Engineering
!
Nuclear Engineering Program
'
ATTN: Dale E. Klein, Director Nuclear Engineering Laboratory Austin, Texas 78712 Gentlenien:
This refers to the inspection conducted by Messrs. M. E. Murphy and R. V. Azua of this office during the period April 27-28, 1989, of activities authorized by
' NRC Construction Permit ~ CPRR-123 for the University of Texas, and to the discussion of our findings with Dr. T. L. Bauer at the conclusion of the inspection.
'
Areas examined during the inspection included mechanical equipment, piping and electrical systems installation; construction progress; and schedule update.
Within these areas, the inspection consisted of selective examination of representative records, interviews with personnel, and observations by the NRC inspectors. The inspection findings are documented in the enclosed inspection report, Within the scope of the inspection, no violations or deviations were identified.
Should'you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, gg Signeu BY J. Callan L. J. Callan, Director Division of Reactor Projects q
Enclosure:
Appendix - NRC Inspection Report 50-602/89-02 j
cc w/ enclosure:
(see next page)
[
RIV:TPS v
RI:TPS C:TPS D DR f
D:DRP
!
MEMurphy/twl RVAzua WCSeidle p Mil oan LJ3allan
o 5 /c r/89 e c /c r/89 c(/cs/89 1 f/ /89 y 6/89
'
8905190024 890510 PDR ADOCK 05000602 I
l Q
-
,.
,___ _;-____
_
,
_
-[{(
A
'T
j
.
4.,
<
.
no
..:
~
,
.
,
'
..
University of Texas-2-
,
,
..
,
c
.
cc w/ enclosure:
University of Texas -
- Collegeuof Engineering Department of Mechanical Engineering n
Nuclear--Engineering Program F-~
'y ATTN: Tom L. Bauer, Supervisor Reactor. 0perations
!
,
?. Nuclear Reactor Laboratories
!
L'
!
'Texcs Radiation Control Director
'
?
bec w/ enclosure:i.
i p.'
bec:to.DMB(IE-01)l bec distrib.,by'RIV:
E
. R. D. Martin
- Inspector
..
,
- C:RPB-DRSS A.- Adams, NRR Project Manager.
- DRP..
- Lisa Shea, RM/ALF
- RIV' File
.* MIS Coordinator
- RSTS Operator-
.*DRS
- R. Hall-DRSS
. *C:FRPS A. B. Beach DRSS
- RPB-DRSS G. F. Sanborn, E0
- W. C. Seidle
'*M. E.-Murphy
- R. V. Azua
"s
~
'*w/766
.- ( e
r
- .I p.
'
.
)
..
v
,
i
.
s k.
.
- - - - -
- - - - - - - - - - - - -. -
-
_ _ - - - - - - - - - - - - - - - _ _ - - - - - - - - - - - - - - - - - - - - - - - -