MONTHYEARML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066G2882020-02-28028 February 2020 LLC Submittal of Presentation Materials Titled ACRS Full Committee Presentation: NuScale - Steam Generator Design (Closed Session), PM-0220-69053, Revision 0 2023-06-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-0718-60920 July 17, 2018 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Response to NRC Request for Additional Information No.
485 (eRAI No. 9392) on the NuScale Design Certification Application
REFERENCE:
U.S. Nuclear Regulatory Commission, "Request for Additional Information No.
485 (eRAI No. 9392)," dated June 01, 2018 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's response to the following RAI Questions from NRC eRAI No. 9392:
18-48 18-49 18-50 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Carrie Fosaaen at 541-452-7126 or at cfosaaen@nuscalepower.com.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8G9A Samuel Lee, NRC, OWFN-8G9A Prosanta Chowdhury NRC, OWFN-8G9A : NuScale Response to NRC Request for Additional Information eRAI No. 9392 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
RAIO-0718-60920 :
NuScale Response to NRC Request for Additional Information eRAI No. 9392 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9392 Date of RAI Issue: 06/01/2018 NRC Question No.: 18-48 Review Criteria NUREG-1791, Section 10.1.2, Human Performance Measures and Criteria, says, The applicant needs to identify the measures of human performance used to evaluate individual and crew performance of the control personnel in the scenarios In addition to defining the measures of human performance used in validating the staffing plan, the applicant should identify the criteria established to determine the acceptability of the results obtained.
Application and Evaluation NuScale submitted Control Room Staffing Plan Validation Methodology, Revision 3, for staff review with the design certification application. Section 8.0, Analyze Workload, of Control Room Staffing Plan Validation Methodology is labeled proprietary and explains the method used to calculate workload. Section 8.0, Paragraph 2.a discusses an activity to be performed by subject matter experts. The staff would like to understand why subject matter experts performed the activity because typically the personnel discussed in Section 8.0, Paragraph 2.c perform this activity (refer to NASA Task Load Index (TLX) v. 1.0 Manual, available at https://humansystems.arc.nasa.gov/groups/tlx/tlxpaperpencil.php).
Further, Section 8.0, Paragraph 2.b of Control Room Staffing Plan Validation Methodology" says more than one type of calculation will be performed. However, the SPV Results TR, Appendix A, Section A.2, TLX Results; Appendix B, Section B.3, TLX Results; and Appendix C, Section C.3, TLX Results only discuss the results determined by one of the calculations discussed in Section 8.0, Paragraph 2.b of Control Room Staffing Plan Validation Methodology." The staff would like to understand whether there were significant differences in the results provided by the different calculations.
Additional Information Requested
- 1. Please explain why subject matter experts performed the activity discussed in Control Room Staffing Plan Validation Methodology, Section 8.0, Paragraph 2.a instead of the NuScale Nonproprietary
personnel discussed in Section 8.0, Paragraph 2.c.
- 2. Please also explain whether there were significant differences in the results that were obtained using the calculations discussed in Control Room Staffing Plan Validation Methodology, Section 8.0, Paragraph 2.b.
NuScale Response:
The operating crews participating in the staffing plan validation were not available when the task load index weighting was determined. The subject matter experts had the necessary knowledge to complete the task load index weighting. Also, the use of subject matter experts limited operating crew bias that could occur with foreknowledge of the tasks to be included in the staffing plan validation scenarios.
There were no significant differences in the results between weighted and non-weighted workload value.
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9392 Date of RAI Issue: 06/01/2018 NRC Question No.: 18-49 Review Criteria NUREG-1791, Section 10.3.4, Staffing Plan Validation Outcomes, says, The reviewer should confirm that the following criteria have been met, as applicable The staffing plan effectively addressed any identified environmental conditions or staffing practices that could potentially degrade individual or crew performance.
Application and Evaluation NuScale provided technical report Control Room Staffing Plan Validation Results (SPV Results TR), Revision 1, for staff review with the design certification application. Appendix E, Section E.2, Detailed Description, of the SPV Results TR is labeled proprietary and export-controlled information. This section describes a specific scenario event on Page 107. Based on the information in the last paragraph of this page, it is not clear whether any changes in the main control room environment could occur during this event, and if so, whether such changes would be expected to have an impact on the staffing plan.
Additional Information Requested Please explain whether any changes in the main control room environment could occur during the event described on Page 107 of the SPV Results TR, and if so, whether such changes would be expected to have an impact on the staffing plan.
NuScale Response:
For the scenario described, the environment would not change since the deenergized electrical buses were re-powered from backup diesels.
The NuScale design provides for multiple backup power supplies including two diesel generators, an alternate AC power supply (e.g., gas turbine) and/or a unit operating in "island mode." Loss of offsite AC would not be expected to have an effect on the control room NuScale Nonproprietary
environment and therefore would not impact the staffing plan. FSAR reference 20.1-10, NuScale Power LLC, Mitigation Strategies for Extended Loss of AC Power Event, TR-0816-50797, section 6.7.2, Control Room Habitability, describes the control room environment on an extended loss of AC power. Analysis shows that, in the unlikely event of an extended loss of all AC power, main control room environment conditions remain well below the wet bulb globe termperature limit of 90 degrees F and would not impact the staffing plan.
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9392 Date of RAI Issue: 06/01/2018 NRC Question No.: 18-50 Review Criteria NUREG-0711, Section 11.4.3, "Integrated System Validation," contains guidance for the integrated system validation (ISV) test. Review Criterion 11.4.3.2(1) says, "The applicant should develop detailed test objectives to provide evidence that the integrated system adequately supports plant personnel in safely operating the plant, to include the following considerations:
Validate the acceptability of the shift staffing level(s), the assignment of tasks to crew members, and crew coordination within the control room, between the control room and local control stations and support centers, and with individuals performing tasks locally. This should encompass validating minimum shift staffing levels, nominal levels, maximum levels, and shift turnover."
Application and Evaluation Part 7, Section 6.1.3, "Requested Action," of the NuScale Design Certification Application (DCA) states, "NuScale Power, LLC requests that minimum licensed operator staffing requirements specific to the NuScale Power Plant design be adopted as requirements applicable to licensees referencing the NuScale Power Plant design certification, in lieu of the requirements stated in 10 CFR 50.54(m)." The proposed rulemaking language in the Part 7, Section 6.1.3 says that three operators and three senior operators shall be on site when one or more units are operating.
Additionally, the proposed rulemaking language in the Part 7, Section 6.1.3 says at least one senior operator shall be in the control room at all times, and one operator shall be at the controls at all times.
The staff is reviewing the proposed minimum licensed operator staffing requirements specific to the NuScale Power Plant design using the guidance in NUREG-0711. The staff understands that the three operators and the three senior operators who will be required to be on site each shift when one or more units are operating may not necessarily be at their designated consoles in the control room or even in the control room all of the time. For example, operators may need to participate in meetings or field activities outside of the control room while on shift, and it's expected they will need to leave the control room for normal activities such as eating a meal during a multi-hour long shift. It's possible that only one operator and one senior operator may be NuScale Nonproprietary
in the control room at any given time during the operation of one or more units.
Based on the response to RAI 9123, Question 18-12 (ADAMS Accession No. ML18002A554),
the staff understands NuScale plans to conduct (ISV) testing later in 2018. NuScale provided the "Human Factor Verification and Validation Implementation Plan" (V&V IP), Revision 4, for staff review. The staff also reviewed NuScale's "ISV Test Plan" and ISV scenario basis documents during an audit as described in the audit plan dated July 25, 2017 (ADAMS Accession No. ML17205A465). The staff did not find information about whether and how the ISV testing will simulate the minimum control room staffing level that could occur during the operation of the facility. The staff requests the information to inform the review of the proposed minimum licensed operator staffing requirements specific to the NuScale Power Plant design that will be applicable to licensees referencing the NuScale Power Plant design certification.
Additional Information Requested Please explain how the ISV testing will simulate the minimum control room staffing level that could occur during the operation of the facility.
NuScale Response:
Several scenarios include reduced licensed operator staffing of one or two operators. The operators are outside the control room and can be recalled via the plant page. Because of the highly automated design and limited dependency on operator actions, reduced manning has had little or no impact on scenario performance during pilot testing. Full control room staffing is anticipated to be established within 5-10 minutes of a recall page, therefore, reduced staffing during the integrated system validation will only verify that a plant page can be made and plant control can be maintained for 5-10 minutes. The NuScale design does not require operator actions within this time frame to maintain nuclear safety. Therefore, further reduction in manning level has not been added into the integrated system validation scenarios.
Impact on DCA:
There are no impacts to the DCA as a result of this response.