A SCANA COMPANY George A. Lippard Vice President, Nuclear Operations 803-345-4810 June 29, 2018 RC-18-0079 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO CORRECT AN ADMINISTRATIVE ERROR
References:
- 1.
NUREG-0932 Virgil C. Summer Nuclear Station Unit No. 1 Technical Specifications issued August 1982 (ADAMS ML041000447)
- 2.
Proposed Guidance for Correction of Technical Specification Typographical Errors, SECY-96-238, dated November 19, 1996 (ADAMS Legacy Library Accession No. 9611250030)
This letter requests Nuclear Regulatory Commission's (NRC) approval of a correction to an error in Virgil C. Summer Nuclear Station (VCSNS) Technical Specifications (TS). This error was inadvertently introduced during original issuance of the station's TS.
This error was neither addressed in the notice to the public, nor reviewed by the NRC, and thus falls within the scope of the guidance provided by SECY-96-238 (Reference 2) for corrections.
Attachment I describes the error and corrections. Attachment II provides the requested correction noted. Attachment III contains the corrected page.
This document contains no new commitments.
V. C. Summer Nuclear Station
- P. 0. Box 88
- Jenkinsville, South Carolina
- 29065
- F (803) 941-9776
- www.sceg.com
Document Control Desk RC-18-0079 CR-18-00486 Page 2 of 2 If you have any questions about this submittal, please contact Mr. Michael S. Moore at (803) 345-4752.
I certify under penalty of perjury that the foregoing is correct and true.
RLP/GAL/jrb Attachments:
Attachment I - Description of Technical Specification Error Attachment II-Marked Up Technical Specification Page Attachment III-Clean Technical Specification Page c:
S. A. Williams NSRC RTS (CR-18-00486)
File (813.20)
PRSF (RC-18-0079)
Executed on
Document Control Desk Attachment I RC-18-0079 CR-18-00486 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 Attachment I Description of Technical Specification Error
Document Control Desk Attachment I RC-18-0079 CR-18-00486 Page 2 of 2 Requested Action Consistent with the information contained in SECY-96-238, Proposed Guidance for Correction of Technical Specification Typographical Errors, South Carolina Electric & Gas (SCE&G) is requesting a correction of an error that was inadvertently introduced into the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Technical Specifications (TS).
- 1. Typographical Error The error was introduced into the VCSNS TS during original issuance. The specification of the error and proposed corrections are described below:
Review of TS 3.1.2.6 - Borated Water Sources - Operating and TS 3.5.4 - Refueling Water Storage Tank revealed an error within the time to Mode 3 for inoperable Refueling Water Storage Tank (RWST). The discrepancy is TS 3.1.2.6 allows for 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to Mode 3, while TS 3.5.4 only allows 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to Mode 3. A total of 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to Mode 3 requirement should apply to both action statements.
TS 3.1.2.6 Action B states:
"With the refueling water storage tank inoperable, restore the tank to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />."
TS 3.5.4 Action states:
"With the refueling water storage tank inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />."
TS 3.5.4 Action should state "restore the tank to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />". The words "the next" need to be added after "within" to TS 3.5.4. This addition will provide the correct total of 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to the Mode 3 requirement. The marked-up TS can be found in Attachment II.
- 2. Correction to Affected Pages SECY-96-238 (Reference 2) provides guidance to correct inadvertent errors in the Technical Specifications. This error described above was neither posted in the public notices nor was it reviewed by NRC as part of the license amendment process. Therefore, it may be corrected without a license amendment.
Accordingly, upon approval from the NRC, a corrected TS Page 3/4 5-9 will be issued to all holders of controlled TS.
Document Control Desk Attachment II RC-18-0079 CR-18-00486 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 Attachment II Marked Up Technical Specification Page
EMERGENCY CORE COOLING SYSTEMS 3/4.5.4 REFUELING WATER STORAGE TANK LIMITING CONDITION FOR OPERATION 3.5.4 The refueling water storage tank (RWST) shall be OPERABLE with:
- a.
A minimum contained borated water volume of 453,800 gallons,
- b.
A boron concentration of between 2300 and 2500 ppm of boron, and
- c.
A minimum water temperature of 40°F.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
With the refueling water storage tank inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
the next
/
SURVEILLANCE REQUIREMENTS 4.5.4 The RWST shall be demonstrated OPERABLE:
- a.
At least once per 7 days by:
- 1.
Verifying the contained borated water volume in the tank, and
- 2.
Verifying the boron concentration of the water.
- b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when the outside air temperature is less than 40°F.
SUMMER-UNIT 1 3/4 5-9 Amendment No. 44, 56, 61,192, 207
Document Control Desk Attachment III RC-18-0079 CR-18-00486 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 Attachment III Clean Technical Specification Page
EMERGENCY CORE COOLING SYSTEMS 3/4.5.4 REFUELING WATER STORAGE TANK LIMITING CONDITION FOR OPERATION 3.5.4 The refueling water storage tank (RWST) shall be OPERABLE with:
- a.
A minimum contained borated water volume of 453,800 gallons,
- b.
A boron concentration of between 2300 and 2500 ppm of boron, and
- c.
A minimum water temperature of 40°F.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
With the refueling water storage tank inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.4 The RWST shall be demonstrated OPERABLE:
- a.
At least once per 7 days by:
- 1.
Verifying the contained borated water volume in the tank, and
- 2.
Verifying the boron concentration of the water.
- b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when the outside air temperature is less than 40°F.
SUMMER-UNIT 1 3/4 5-9 Amendment No. 44, 56, 61,192, 207