MONTHYEARND-24-0103, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2024-04-26026 April 2024 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-24-0114, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-04-0101 April 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-24-0046, (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance2024-03-18018 March 2024 (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance ND-24-0059, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-03-0404 March 2024 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0693, Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests2024-02-15015 February 2024 Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests ND-23-0690, Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests2024-02-0808 February 2024 Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests ND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) 2024-04-26
[Table view] Category:License-Application for Combined License (COL) (Amend/Renewal) DKT 52
MONTHYEARNL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0128, License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency2024-04-0404 April 2024 License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency NL-23-0742, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications2023-09-20020 September 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) ML23088A1382023-05-0404 May 2023 Enclosure 9 - Attachment to License Amendment No. 189 for COL No. NPF-91 ML23088A1372023-05-0404 May 2023 Enclosure 8 - Attachment to License Amendment No. 124 for COL No. NPF-92 ML23088A1362023-05-0404 May 2023 Enclosure 7 - Attachment to License Amendment No. 181 for COL No. NPF-92 ML23088A1352023-05-0404 May 2023 Enclosure 6 - Attachment to License Amendment No. 166 for COL No. NPF-92 ML23088A1342023-05-0404 May 2023 Enclosure 5 - Attachment to License Amendment No. 188 for COL No. NPF-91 ML23045A1802023-05-0404 May 2023 Enclosure 4 - Attachment to License Amendment No. 147 for COL No. NPF-92 ML23045A1792023-05-0404 May 2023 Enclosure 3 - Attachment to License Amendment No. 148 for COL No. NPF-91 ML23045A1782023-05-0404 May 2023 Enclosure 2 - Attachment to License Amendment No. 117 for COL No. NPF-92 ML23045A1772023-05-0404 May 2023 Enclosure 1 - Attachment to License Amendment No. 118 for COL No. NPF-91 NL-23-0135, License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005)2023-04-17017 April 2023 License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005) NL-23-0132, License Amendment Request: Remove Combined License Appendix C (LAR 23-001)2023-04-0404 April 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-001) NL-23-0193, Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003)2023-03-24024 March 2023 Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) ML23039A1672023-02-0808 February 2023 Draft LAR to Remove Tier 1 and Tier 2 Star Requirements NL-23-0076, Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004)2023-01-31031 January 2023 Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004) NL-23-0020, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality2023-01-12012 January 2023 Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ND-22-0881, License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002)2023-01-0303 January 2023 License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002) ML22332A5372022-11-28028 November 2022 Draft LAR 23-001 for 12-8-22 Public Meeting ML22284A1312022-11-22022 November 2022 LAR-22-003 U4 Electrical ITAAC Consolidation Amendment No. 187 ML22307A0072022-11-0202 November 2022 Draft LAR for TS 3.8.3 Inverters Operating Completion Time Extension ND-22-0709, Request for License Amendment and Exemption Electrical Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Optimization (LAR-22-003)2022-09-0202 September 2022 Request for License Amendment and Exemption Electrical Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Optimization (LAR-22-003) ML22087A0682022-03-31031 March 2022 Draft LAR 22-001, Unit 4 Security ITAAC for 3-31-22 Public Meeting with SNC ND-21-0772, Request for License Amendment and Exemption: Clarification of ITAAC Regarding Invessel Components (LAR-21-001)2021-08-24024 August 2021 Request for License Amendment and Exemption: Clarification of ITAAC Regarding Invessel Components (LAR-21-001) ML21230A0162021-08-19019 August 2021 Invessel As-built ITAAC Draft LAR 21-001 for 210819 Psm ML20196L6762020-08-11011 August 2020 Amendment 183 - Vogtle Electric Generating Plant Unit 3 for LAR 20-002 ML20132A0522020-08-0303 August 2020 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-001) ND-20-0725, Plants Units 3 and 4, Revision to License Amendment Request: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation2020-06-22022 June 2020 Plants Units 3 and 4, Revision to License Amendment Request: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation ND-20-0668, Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005)2020-06-19019 June 2020 Request for License Amendment for Vacuum Relief Valve Technical Specification Changes (LAR-20-005) ND-20-0464, Request for License Amendment: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation2020-05-0707 May 2020 Request for License Amendment: Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation ND-20-0504, Transmittal of Section 404 Permit Modification Request2020-05-0404 May 2020 Transmittal of Section 404 Permit Modification Request ND-20-0507, Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR-20-004)2020-04-30030 April 2020 Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR-20-004) ND-20-0289, Transmittal of NPDES Permit Renewal Application2020-03-31031 March 2020 Transmittal of NPDES Permit Renewal Application ND-20-0266, Revised Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019R1)2020-03-20020 March 2020 Revised Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019R1) ND-20-0122, Request for License Amendment: Main Control Room Emergency Habitability System (Ves) Pressure Regulating Valve and Source Range Neutron Flux Doubling Surveillance Changes, and Other Miscellaneous.2020-02-28028 February 2020 Request for License Amendment: Main Control Room Emergency Habitability System (Ves) Pressure Regulating Valve and Source Range Neutron Flux Doubling Surveillance Changes, and Other Miscellaneous. ND-20-0075, Request for License Amendment and Exemption: Unit 3 Auxiliary Building Wall 11 Seismic Gap Requirements (LAR-20-001)2020-02-0707 February 2020 Request for License Amendment and Exemption: Unit 3 Auxiliary Building Wall 11 Seismic Gap Requirements (LAR-20-001) ND-20-0092, Revision to Request for License Amendment: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (LAR-19-017R1)2020-01-31031 January 2020 Revision to Request for License Amendment: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (LAR-19-017R1) ND-19-1388, Preliminary Amendment Request (Par): Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (PAR-19-014)2019-11-13013 November 2019 Preliminary Amendment Request (Par): Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (PAR-19-014) ND-19-1292, Proposed Changes to the Licensing Basis Documents (LAR-19-018)2019-10-31031 October 2019 Proposed Changes to the Licensing Basis Documents (LAR-19-018) ND-19-1313, Revision to Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1)2019-10-25025 October 2019 Revision to Request for License Amendment: Reinforcement Changes for Wall L and Wall 7.3 (LAR-19-016R1) ND-19-1314, Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2)2019-10-25025 October 2019 Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2) ML19262F8562019-10-22022 October 2019 License Amendment - Vogtle Electric Generating Plant, Unit 4 (LAR 19-006) ML19262F8552019-10-22022 October 2019 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment 165 (LAR-19-006) ML19262F8572019-10-22022 October 2019 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 163 (LAR-19-006) ND-19-1142, Request for License Amendment and Exemption: Automatic Depressurization System (ADS) and Core Makeup Tank (Cmt) Design Parameters (LAR-19-009)2019-09-30030 September 2019 Request for License Amendment and Exemption: Automatic Depressurization System (ADS) and Core Makeup Tank (Cmt) Design Parameters (LAR-19-009) ML19247C8572019-09-0909 September 2019 Notice of No Objection for Preliminary Amendment Request for LAR-19-016 2024-07-25
[Table view] |
Text
Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway Birmingham, AL 35243 June 21, 2018 Docket Nos.: 52-025 ND-18-0871 52-026 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Supplement to Request for License Amendment:
Technical Specification Updates for Reactivity Controls and other Miscellaneous Changes (LAR-17-024S3)
Ladies and Gentlemen:
Pursuant to 10 CFR 52.98(c) and in accordance with 10 CFR 50.90, Southern Nuclear Operating Company (SNC) previously requested an amendment to the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 (License Numbers NPF-91 and NPF-92, respectively). The requested amendment proposes to depart from approved COL Appendix A, Technical Specifications.
SNC originally submitted this request by SNC letter ND-17-1279, dated July 28, 2017 [ADAMS Accession No. ML17209A755] and supplemented by SNC letter ND-18-0058, dated January 23, 2018 [ADAMS Accession No. ML18023A440] and by SNC letter ND-18-0364, dated March 23, 2018 [ADAMS Accession No. ML18082B370].
Enclosures 1 through 3 were provided with the original License Amendment Request (LAR),
Enclosures 4 and 5 were provided with the first LAR supplement, and Enclosures 6, 7, and 8 were provided with the second LAR supplement. provides a revised description of change and technical evaluation for Change L07 in the original LAR based upon discussions held with the NRC staff on May 31, 2018 and June 14, 2018. 0 provides the applicable revised markups depicting the requested change to the licensing basis documents requiring NRC staff approval. 1 provides the applicable revised conforming Technical Specifications Bases changes for information only.
The information provided in this LAR supplement does not expand the scope of the request, or alter the conclusions of the Significant Hazards Consideration Determination or Environmental Considerations submitted in LAR-17-024.
U.S. Nuclear Regulatory Commission ND-18-0871 Page 2 of 5 This letter contains no regulatory commttments. This letter has been reviewed and determined not to contain security-related information.
SNC now requests NRC staff approval of this license amendment by July 20, 2018 to support Operator training updates. Delayed approval of this license amendment could result in a delay in Operator training updates. SNC expects to implement the proposed amendment within thirty days of approval.
In accordance with 10 CFR 50.91 , SNC is notifying the State of Georgia of this LAR supplement by transmitting a copy of this letter and its enclosure to the designated State Official.
Should you have any questions, please contact Mr. Ryan Henderson at (205) 992-6426.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 21st of June 2018.
Respectfully submitted, Amy G. Aughtman Director, Licensing Southern Nuclear Operating Company
U.S. Nuclear Regulatory Commission ND-18-0871 Page 3 of 5
Enclosures:
- 1) - 3) (previously submitted with the original LAR, LAR-17-024, in SNC letter ND-17-1279)
- 4) - 5) (previously submitted as supplemental information with LAR-17-024S1 in SNC letter ND-18-0058)
- 6) - 8) (previously submitted as supplemental information with LAR-17-024S2 in SNC letter ND-18-0364)
- 9) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and other Miscellaneous Changes (LAR-17-024S3)
- 10) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Supplement to Proposed Changes to Licensing Basis Documents (LAR-17-024S3)
- 11) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Supplement to Conforming Technical Specifications Bases Changes (For Information Only) (LAR-17-024S3)
U.S. Nuclear Regulatory Commission ND-18-0871 Page 4 of 5 cc:
Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosures)
Mr. D. G. Bost (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. D. H. Jones (w/o enclosures)
Mr. J. B. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o enclosures)
Mr. T. W. Yelverton (w/o enclosures)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Yox Mr. J. Tupik Mr. W. A. Sparkman Ms. A. C. Chamberlain Ms. A. L. Pugh Mr. F. J. Redwanz Document Services RTYPE: VND.LI.L00 File AR.01.02.06 Nuclear Regulatory Commission Mr. W. Jones (w/o enclosures)
Ms. J. Dixon-Herrity Mr. C. Patel Ms. J. M. Heisserer Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. T.E. Chandler Ms. P. Braxton Mr. T. Brimfield Mr. C. J. Even Mr. A. Lerch State of Georgia Mr. R. Dunn
U.S. Nuclear Regulatory Commission ND-18-0871 Page 5 of 5 Oglethorpe Power Corporation Mr. M. W. Price Mr. K. T. Haynes Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Mr. L. Oriani (w/o enclosures)
Mr. G. Koucheravy (w/o enclosures)
Mr. M. Corletti Mr. M. L. Clyde Ms. L. Iller Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham Mr. R. Grumbir, APOG NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light
Southern Nuclear Operating Company ND-18-0871 Enclosure 9 Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Supplement to Request for License Amendment:
Technical Specification Updates for Reactivity Controls and other Miscellaneous Changes (LAR-17-024S3)
Insertions Denoted by Blue Underline and Deletions by Red Strikethrough Omitted text is identified by three asterisks (* * *)
(This Enclosure consists of 3 pages, including this cover page)
ND-18-0871 Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and other Miscellaneous Changes (LAR-17-024S3)
Vogtle Electric Generating Plant (VEGP) Units 3 and 4 submitted License Amendment Request LAR-17-024 via Southern Nuclear Operating Company (SNC) letter ND-17-1279 on July 28, 2017. The portion of the LAR identified as change L07 on Page 11 of 39 and Page 34 of 39 of proposed a change to Technical Specification (TS) Table 3.3.5-1. This change included:
- 1. Change the Table 3.3.5-1 Function 1, Manual Reactor Trip Required Channels from 2 to 2 switches.
- 2. Change the Table 3.3.5-1 Function 2, Safeguards Actuation Input from Engineered Safety Feature Actuation System - Manual Required Channels from 2 to 2 switches.
- 3. Change the Table 3.3.5-1 Function 4, Core Makeup Tank Actuation Input from Engineered Safety Feature Actuation System - Manual Required Channels from 2 switch sets to 2 switches.
Based on discussion with the NRC staff in the public meetings on May 31, 2018 and June 14, 2018, SNC is withdrawing the proposed changes to Function 1 and Function 2 and is proposing to revise the change to Function 4 in order to improve the presentation of the requirement. There are no changes to the design or operation of the functions. The updated proposed change continues to reflect an editorial presentation preference only.
The revision to the original LAR reflects an improvement to the LAR and does not expand the scope of the request, or alter the conclusions of the Significant Hazards Consideration Determination or Environmental Considerations submitted in LAR-17-024.
Changes to Original LAR-17-024:
Changes to Enclosure 1 Revise Page 11 of 39 of Enclosure 1 to ND-17-1279 as indicated below:
L07 Detailed Description 3.3.5-3 1. Change the Table 3.3.5-1 Function 1, Manual Reactor Trip Required Channels from 2 to 2 switches.
LR
- 2. Change the Table 3.3.5-1, Function 2, Safeguards Actuation Input from Engineered Safety Feature Actuation System - Manual Required Channels from 2 to 2 switches.
- 3. Change the Table 3.3.5-1, Function 4, Core Makeup Tank Actuation Input from Engineered Safety Feature Actuation System - Manual Required Channels from to 2 switch sets to 2 switches.
Technical Evaluation A manual actuation switch set refers to a pair of redundant switches on the Primary Dedicated Safety Panel (PDSP), and for some protective functions, one switch on the Secondary Dedicated Safety Panel (SDSP). The second set of redundant switches is located on the SDSP for the actuation of all Page 2 of 3
ND-18-0871 Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and other Miscellaneous Changes (LAR-17-024S3) safety functions that cause the operation of components with onerous consequences. In order to initiate the protective function of switch sets that have both a PDSP switch and associated SDSP switch, they must be actuated simultaneously. For Reactor Trip and Engineered Safety Features Actuation System (ESFAS) functions with manual actuation switches located only on the PDSP, the term switch set does not apply.
Table 3.3.5-1, Functions 1 and 2 states 2 channels, and Function 4, states 2 switch sets for the manual actuation reactor trip function under the Required Channels column. The Protection and Safety Monitoring System (PMS) design of the manual actuation reactor trip provides two redundant switches controls on the PDSP, with no corresponding switches controls on the SDSP. This is consistent with the description of the manual actuation of Function 4 in UFSAR (plant-specific DCD) Subsection 7.2.1.1.8 and Figure 7.2-1 Sheet 12. For this configuration, the term switch set does not reflect the design. Operation of either control will result in a CMT actuation signal and also will result in a reactor trip signal. For this configuration, the term switches for Functions 1, 2 and 4, manual reactor trip is applicable for this proposed change. There is no change in manual actuation reactor trip functions with these this changes, or any change in PMS function. The proposed changes to the Reactor Trip and ESFAS manual actuation is being made for consistency with the design.
Revise the description of change L07 on Page 34 of 39 to match the above discussion as follows:
L07 SNC proposes to amend TS, Section 3.3.5, "Reactor Trip System Manual Actuation," Table 3.3.5-1 Reactor Trip System Manual Actuation, Functions 1. Manual Reactor Trip, 2. Safeguards Actuation Input from Engineered Safety Feature Actuation System - Manual and 4., Core Makeup Tank Actuation Input from Engineered Safety Feature Actuation System - Manual for Required Channels to 2 (delete switch sets) switches.
Page 3 of 3
Southern Nuclear Operating Company ND-18-0871 Enclosure 10 Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Supplement to Proposed Changes to Licensing Basis Documents (LAR-17-024S3)
Insertions Denoted by Blue Underline and Deletions by Red Strikethrough Omitted text is identified by three asterisks (* * *)
Withdrawal of added text Denoted by Blue Strikethrough with Yellow Highlight (This Enclosure consists of 2 pages, including this cover page)
ND-18-0871 0 Supplement to Proposed Changes to Licensing Basis Documents (LAR-17-024S3)
On Page 8 of 9 of Enclosure 2 of SNC letter ND-17-1279, replace change L07 with the following:
Revised COL Appendix A (Technical Specifications), TS 3.3.5, RTS Manual Actuation, as follows (L07):
APPLICABLE MODES OR OTHER SPECIFIED FUNCTION CONDITIONS REQUIRED CHANNELS
- 1. Manual Reactor Trip * *
- 2. Safeguards Actuation Input from Engineered
- 2 switches Safety Feature Actuation System - Manual
- 3. ADS Stages 1, 2, and 3 Actuation Input from 2 switch sets Engineered Safety Feature Actuation System - * *
- 4. Core Makeup Tank Actuation Input from 2 switchesswitch sets Engineered Safety Feature Actuation System - * *
Southern Nuclear Operating Company ND-18-0871 Enclosure 11 Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Supplement to Conforming Technical Specifications Bases Changes (For Information Only)
(LAR-17-024S3)
Insertions Denoted by Blue Underline and Deletions by Red Strikethrough Omitted text is identified by three asterisks (* * *)
Withdrawal of inserted text Denoted by Blue Strikethrough with Yellow Highlight Withdrawal of change to existing text Denoted by Black with Yellow Highlight (This Enclosure consists of 3 pages, including this cover page)
ND-18-0871 1 Supplement to Conforming Technical Specifications Bases Changes (For Information Only)
(LAR-17-024S3)
On Page 10 and 11 of 12 of Enclosure 3 to SNC letter ND-17-1279, replace change L07 with the following:
Revised Technical Specification Bases, Section B 3.3.5, RTS Manual Actuation, as follows (L07):
APPLICABLE * *
- SAFETY ANALYSES, LCOs, 1. Manual Reactor Trip and APPLICABILITY The LCO requires two Manual Reactor Trip actuation channelsswitches to be OPERABLE in MODES 1 and 2, and in MODES 3, 4, and 5 when the Plant Control System (PLS) is capable of rod withdrawal, or one or more rods are not fully inserted. Two independent actuation channelsswitches are required to be OPERABLE so that no single random failure will disable the Manual Reactor Trip Function.
- 2. Safeguards Actuation Input from Engineered Safety Feature Actuation System - Manual The LCO requires two manual channelsswitches of Safeguards Actuation Input from ESFAS to be OPERABLE in MODES 1 and 2.
Page 2 of 3
ND-18-0871 1 Supplement to Conforming Technical Specifications Bases Changes (For Information Only)
(LAR-17-024S3)
- 4. Core Makeup Tank (CMT) Actuation Input from Engineered Safety Feature Actuation System - Manual The LCO requires two manual actuation switch setsswitcheschannels for the CMT Actuation Input from Engineered Safety Feature Actuation System to be OPERABLE.
Two OPERABLE manual actuation switch setsswitcheschannels are provided to ensure that random failure of a single logic channel will not prevent reactor trip.