ND-18-0660, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.04.02.1 (Index Number 327)

From kanterella
(Redirected from ML18131A206)
Jump to navigation Jump to search
Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.04.02.1 (Index Number 327)
ML18131A206
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/09/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ITAAC 2.3.04.02.1, ND-18-0660
Download: ML18131A206 (7)


Text

Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Southern Nuclear Vogtle 3 & 4 706-848-6459 tei 410-474-8587 ceii myox@southernco.Gom MAY 0 9 2018 Docket Nos.: 52-025 52-026 ND-18-0660 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.04.02.1 (Index Number 3271 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of May 4, 2018 Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.04.02.1 [Index Number 327] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Companywill, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 & Unit 4 Completion Plan for Uncompleted ITAAC 2.3.04.02.1 [Index Number 327]

MJY/KJD/amw

8r<<K a 0 U.S. Nuclear Regulatory Commission ND-18-0660 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Rauckhorst (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Yox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Ms. N. C. Coovert Oalethoroe Power Corporation Mr. R. B. Brinkman

U.S. Nuclear Regulatory Commission ND-18-0660 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Sen/Ice Commission Ms. 8. W. Kernlzan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch BIngham

U.S. Nuclear Regulatory Commission ND-18-0660 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-18-0660 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 & Unit 4 Completion Plan for Uncompleted ITAAC 2.3.04.02.1 [Index Number 327]

U.S. Nuclear Regulatory Commission ND-18-0660 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

2. The FPS piping shown on Figure 2.3.4-2 remains functional following a safe shutdown earthquake.

Inspections/Tests/Analvses i) Inspection will be performed to verify that the piping shown on Figure 2.3.4-2 is located on the Nuclear Island.

Acceptance Criteria i) The piping shown on Figure 2.3.4-2 is located on the Nuclear Island.

ITAAC Completion Description Multiple ITAAC are performed to demonstrate that the Fire Protection System (FPS) piping shown on Figure 2.3.4-2 of the Combined License (COL) Appendix C remains functional following a safe shutdown earthquake. The subject ITAAC requires an inspection to verify that the piping shown on COL Appendix C, Figure 2.3.4-2 is located on the Nuclear Island, which is a seismic Category I structure.

To assure that the FPS piping shown on COL Appendix C, Figure 2.3.4-2 remains functional following a safe shutdown earthquake, all the pipelines and inline components/valves are designed to be located on the seismic Category I Nuclear Island. In accordance with procedure XYZ (Reference 1), an inspection is conducted ofthe FPS to confirm the satisfactory installation ofthe piping system required to remain functional following a safe shutdown earthquake. The inspection includes verification of the installed piping location (Building and Room).

The inspection results are documented in the Unit 3 and Unit 4 Principal Closure Documents (Reference 2 and 3, respectively) which conclude that the piping shown on COL Appendix C, Figure 2.3.4-2 is located on the Nuclear Island and meets the ITAAC acceptance criteria.

References 1 thru 3 are available for NRC inspection as part of the Unit 3 and Unit4 ITAAC Completion Packages (Reference 4 and 5, respectively).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of allfindings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-18-0660 Enclosure Page 3 of 3 References (available for NRG inspection)

1. Inspection Procedure XYZ
2. Principal Closure Document XXX (Unit 3)
3. Principal Closure Document YYY (Unit 4)
4. 2.3.04.02.i-U3-CP-Rev 0, ITAAC Completion Package
5. 2.3.04.02.i-U4-CP-Rev 0, ITAAC Completion Package
6. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"