ND-18-0648, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item E.3.9.05.01.04 (Index Number 852)

From kanterella
(Redirected from ML18131A201)
Jump to navigation Jump to search
Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item E.3.9.05.01.04 (Index Number 852)
ML18131A201
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/09/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ITAAC E.3.9.05.01.04, ND-18-0648
Download: ML18131A201 (6)


Text

Michael J. Yox 7825 River Road Sk. Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 706-848-6459 tel Vogtle 3 & 4 410-474-8587 cell myox @southernco.com MAY 0 9 2018 Docket No.: 52-025 ND-18-0648 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item E.3.9.05.01.04 [Index Number 8521 Ladies and Gentlemen; Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of May 3, 2018, Vogtle Electric Generating Plant (VEGP) Unit 3 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) E.3.9.05.01.04 [Index Number 852] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yo:

Regulatory Affairs Director Vogtle 3 &4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion Plan for Uncompleted ITAAC E.3.9.05.01.04 [Index Number 852]

MJY/LBP/amw

U.S. Nuclear Regulatory Commission ND-18-0648 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Rauckhorst (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Ms. N. C. Coovert Oaiethoroe Power Corporation Mr. R. B. Brinkman

U.S. Nuclear Regulatory Commission ND-18-0648 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. OrlanI (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernlzan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-18-0648 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-18-0648 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion Plan for Uncompleted ITAAC E.3.9.05.01.04 [Index Number 852]

U.S. Nuclear Regulatory Commission ND-18-0648 Enclosure Page 2 of 3 ITAAC Statement Prooram Commitment 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.I]

Insoections/Tests/Analvses 5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.

Acceptance Criteria 5.1.4 The TSC is located within the protected area, and no major security barriers exist between the TSC and the control room.

ITAAC Completion Description Multiple ITAAC are performed to confirm that the licensee has established a technical support center (TSC) and an onsite operationssupport center (OSC). This ITAAC performs an inspection of the TSC location to confirm thatthe as-built TSC is located within the protected area, and no major security barriersexist between the TSC and the Vogtle Electric Generating Plant (VEGP) Unit 3 control room. As described in NUREG-0696, Functional Criteria for Emergency Response Facilities (Reference 1), there should be no major security barriers between the TSC and the control room other than access control stations for the TSC and control room.

An inspection (walkdown) is completed using TSC and protected area approved construction drawings and visual observations to confirm thatthe as-built TSC is located within the protected area; and by performing visual observations of the travel path between the VEGP Unit 3 control room and the TSC to confirm there are no major security barriers between the TSC and the control room other than the access control stations to the TSC and control room.

The inspection results are documented in the Unit 3 Principal Closure Document XXX (Reference 2) supporting the Unit 3 ITAAC E.3.9.05.01.04 Completion Package (Reference 3) and verify that the TSC is located within the protected area, and no major security barriers exist between the TSC and the VEGP Unit 3 control room.

Reference 2 is available for NRC inspection as part of the Unit 3 ITAAC E.3.9.05.01.04 Completion Package (Reference 3).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-18-0648 Enclosure Page 3 of 3 References favailable for NRG Inspection)

1. NUREG-0696, Functional Criteria for Emergency Response Facilities
2. Principal Closure Document XXX
3. E.3.9.05.01.04-U3-CP-Rev 0, ITAAC Completion Package
4. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"