Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.02.02a (Index Number 593)
ML18107A723
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/17/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ITAAC 2.6.02.02a, ND-18-0490
Download: ML18107A723 (7)


Text

Michael J. Yox 7825 River Road Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 706-848-6459 tei Vogtie 3 & 4 410-474-8587 ceil myox@southernco.com APR 1 7 2018 Docket Nos.: 52-025 52-026 ND-18-0490 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.6.02.02a [Index Number 5931 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of April 1, 2018, Vogtie Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.02.02a [Index Number 593]

has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtie 3 &4

Enclosure:

Vogtie Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.6.02.02a [Index Number 593]

MJY/PGL/amw 7

U.S. Nuclear Regulatory Commission ND-18-0490 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Rauckhorst (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Ms. N. C. Coovert Oalethoroe Power Corporation Mr. R. B. Brinkman

U.S. Nuclear Regulatory Commission ND-18-0490 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-18-0490 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-18-0490 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.6.02.02a [Index Number 593]

U.S. Nuclear Regulatory Commission ND-18-0490 Enclosure Page 2 of 4 ITAAC Statement Desian Commitment 2.a) Each EDS load group 1, 2, 3, and 4 battery charger supplies the corresponding dc switchboard bus load while maintaining the corresponding battery charged.

Inspections. Tests. Analyses Testing of each as-built battery charger will be performed by applying a simulated or real load, or a combination of simulated or real loads.

Acceptance Criteria Each battery charger provides an output current of at least 900 amps with an output voltage in the range 105 to 140 V.

ITAAC Completion Descriptfon Testing is performed in accordance with Unit 3 and Unit 4 component test package work orders (References 1 and 2) to demonstrate that each Non-Class 1E direct current (dc) and Uninterruptible Power Supply System (EDS) load group 1, 2, 3, and 4 battery charger identified in the Combined License (COL) Appendix C, Table 2.6.2-2 (Attachment A) supplies the corresponding dc switchboard bus load while maintaining the corresponding battery charged.

The component test utilizes a load bank to simulate the most limiting loads on each EDS load group battery charger, totaling the value of a fully discharged battery and a full load from the dc switchboard. The EDS battery bank and dc switchboard are disconnected from the battery charger and a load bank is then connected to the output of the battery charger. The EDS battery charger output current and output voltage is measured using the load bank instrumentation and recorded on data sheets included in the component test package work orders (References 1 and 2). The current and output voltage are verified to remain within the acceptance criteria for each EDS battery charger. The current and voltage values are tabulated in Attachment A and demonstrate the EDS battery chargers meet the acceptance criteria.

The Unit 3 and Unit 4 component test results confirm that each EDS battery charger provides an output current of at least 900 amps with an output voltage in the range 105 to 140 V.

The Unit 3 and Unit 4 component test package work orders (References 1 and 2) are available for NRC inspection as part of the Unit 3 and Unit4 ITAAC 2.6.02.02a Completion Packages (References 3 and 4).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-18-0490 Enclosure Page 3 of 4 References ^available for NRG inspection)

1. SNC919925, Rev. 0, "EDS Battery Charger Current and Voltage Test - ITAAC: SV3-2.6.02.02a"
2. SNCXXXXXX, Rev 0, "EDS Battery Charger Current and Voltage Test - ITAAC: SV4-2.6.02.02a"
3. 2.6.02.02a-U3-CP-Rev X "Completion Package for Unit3 ITAAC 2.6.02.02a [Index Number 593]"
4. 2.6.02.02a-U4-CP-Rev X "Completion Package for Unit4 ITAAC 2.6.02.02a [Index Number 593]"
5. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"

U.S. Nuclear Regulatory Commission ND-18-0490 Enclosure Page 4 of 4 Attachment A System: Non-Class 1E do and Uninterruptible Power Supply System Load Bank Unit ^Component Name *Tag No.

Current & Voltage Load Group 1 Battery XXXA 3 EDS1-DC-1 Charger YYYV Load Group 2 Battery XXXA 3 EDS2-DC-1 Charger YYYV Load Group 3 Battery XXXA 3 EDS3-DC-1 Charger YYYV Load Group 4 Battery XXXA 3 EDS4-DC-1 Charger YYYV Load Group 1 Battery XXXA 4 EDS1-DC-1 Charger YYYV Load Group 2 Battery XXXA 4 EDS2-DC-1 Charger YYYV Load Group 3 Battery XXXA 4 EDS3-DC-1 Charger YYYV Load Group 4 Battery XXXA 4 EDS4-DC-1 Charger YYYV Notes:

Excerpt from COL Appendix C, Table 2.6.2-2