ND-18-0504, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.02.02b (Index Number 594)

From kanterella
(Redirected from ML18107A694)
Jump to navigation Jump to search
Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.02.02b (Index Number 594)
ML18107A694
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/17/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-18-0504
Download: ML18107A694 (7)


Text

^

Southern Nuclear APR 1 7 2018 Docket Nos.:

52-025 52-026 Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road WaynestJoro, GA30830 706-848-6459 tel 410-474-8587 cell myox@southernco.corti ND-18-0504 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.6.02.02b [Index Number 5941 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern NuclearOperating Company hereby notifies the NRC that as ofApril 6, 2018,Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.02.02b [Index Number 594]

has not been completedgreater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed bythe guidance described in NEI 08-01, Industry Guideline forthe ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, oranalyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox'

/

Regulatory Affairs Director Vogtle 3 &4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.6.02.02b [Index Number594]

MJY/PGiyamw

U.S. Nuclear Regulatory Commission ND-18-0504 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Rauckhorst (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Ms. N. C. Coovert Oaiethoroe Power Corporation Mr. R. B. Brinkman

U.S. Nuclear Regulatory Commission ND-18-0504 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia PublicService Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Batch Bingham

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-18-0504 Enclosure Vogtle Electric Generating Plant (VEGP) Unit3 and Unit4 Completion Plan for Uncompleted ITAAC 2.6.02.02b [Index Number 594]

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 2.b) Each EDS load group 1, 2, 3, and 4 battery supplies the corresponding do switchboard bus load for a period of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> without recharging.

Inspections. Tests. Analyses Testing of each as-built battery will be performed by applying a simulated or real load, or a combination of simulated or real loads. The test will be conducted on a battery that has been fully charged and has been connected to a battery charger maintained at 135 +/- 1 Vfor a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test.

Acceptance Criteria The batteryterminal voltage is greater than or equal to 105 V after a period of no less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, with an equivalent load greater than 850 amps.

ITAAC Completion Description Testing is performed in accordancewith Unit 3 and Unit 4 component test packagework orders (References 1 and 2, respectively) to verify that each Non-Class 1Edirect current (dc) and Uninterruptible PowerSupply System (EDS) loadgroup 1, 2, 3, and 4 battery suppliesthe corresponding dc switchboard bus loadfora period of2 hours without recharging.

Abattery service test, as defined in Institute of Electrical and Electronics Engineers (IEEE)

Standard450-1995, is performed using a load bankto apply a loadon the batterythat results in a discharge current greaterthan 850 amps.The component test is performed on each fully charged as-built EDS battery thathas beenconnected to a charger maintained at 135+/- 1Vfor a period ofno lessthan 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior tothetest. The EDS battery isdisconnected from the battery charger anda load bank isthenconnected totheoutput ofthe battery, adjusted to a discharge current greater than850 amps. Discharge current and battery terminal voltage at the start ofthe test and upon completion ofthe 2-hour test are recorded on data sheets included in the component test packagework orders (References 1 and 2). The EDS battery discharge currentand terminal voltage measurements are summarizedinAttachment A and demonstrate that each EDS battery meets the acceptance criteria.

The Unit 3 and Unit 4 componenttest results confirm the batteryterminal voltage is greater than orequal to 105 Vafter a period ofnoless than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with an equivalent load greater than 850 amps.

The Unit 3 and Unit 4 componenttest package work orders (References 1 and 2) are available for NRC inspection as part ofthe Unit 3 and Unit 4 ITAAC 2.6.02.02b Completion Packages (References 3 and 4).

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 3 of 4 List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAACfindings associated with this ITAAC.

References favaiiabie for NRG inspection)

1. SNC921189, Rev. 0, "EDS Battery Load Test Test - ITAAC: SV3-2.6.02.02b"
2. SNCXXXXXX, Rev. X, "EDS Battery LoadTest Test - ITAAC: SV4-2.6.02.02b"
3. 2.6.02.02b-U3-CP-Rev X"Completion Package for Unit 3 ITAAC 2.6.02.02b [Index Number 594]"
4. 2.6.02.02b-U4-CP-Rev X"Completion Package for Unit 4 ITAAC 2.6.02.02b[Index Number 594]"
5. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10CFR Part52"

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 4 of 4 Attachment A System: Non-Class 1E do and Uninterruptible Power Supply System Unit Component Name*

Tag No.*

Pre-test Voltage

& Time Test Discharge Current, Voltage &

Time at Start Test Discharge Current, Voltage &

Time at End (2+ Hours) 3 Load Group 1 Battery EDS1-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm 3

Load Group 2 Battery EDS2-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm 3

Load Group 3 Battery EDS3-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm 3

Load Group 4 Battery EDS4-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm 4

Load Group 1 Battery EDS1-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm 4

Load Group 2 Battery EDS2-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm 4

Load Group 3 Battery EDS3-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm 4

Load Group 4 Battery EDS4-DB-1 XXXV hh:mm XXXA YYYV hh:mm XXXA YYYV hh:mm Notes:

  • Excerpt from COL Appendix C, Table 2.6.2-2