ND-18-0504, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.02.02b (Index Number 594)

From kanterella
(Redirected from ML18107A694)
Jump to navigation Jump to search
Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.02.02b (Index Number 594)
ML18107A694
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/17/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-18-0504
Download: ML18107A694 (7)


Text

Michael J. Yox 7825 River Road

^ Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 WaynestJoro, GA 30830 706-848-6459 tel 410-474-8587 cell myox@southernco.corti APR 1 7 2018 Docket Nos.: 52-025 52-026 ND-18-0504 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.6.02.02b [Index Number 5941 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of April 6, 2018, Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.02.02b [Index Number 594]

has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox' ' /

Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.6.02.02b [Index Number594]

MJY/PGiyamw

U.S. Nuclear Regulatory Commission ND-18-0504 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Rauckhorst (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Ms. N. C. Coovert Oaiethoroe Power Corporation Mr. R. B. Brinkman

U.S. Nuclear Regulatory Commission ND-18-0504 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Batch Bingham

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-18-0504 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.6.02.02b [Index Number 594]

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 2.b) Each EDS load group 1, 2, 3, and 4 battery supplies the corresponding do switchboard bus load for a period of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> without recharging.

Inspections. Tests. Analyses Testing of each as-built battery will be performed by applying a simulated or real load, or a combination of simulated or real loads. The test will be conducted on a battery that has been fully charged and has been connected to a battery charger maintained at 135 +/- 1 Vfor a period of no less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the test.

Acceptance Criteria The battery terminal voltage is greater than or equal to 105 V after a period of no less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, with an equivalent load greater than 850 amps.

ITAAC Completion Description Testing is performed in accordance with Unit 3 and Unit 4 component test package work orders (References 1 and 2, respectively) to verify that each Non-Class 1E direct current (dc) and Uninterruptible PowerSupply System (EDS) load group 1, 2, 3, and 4 battery supplies the corresponding dc switchboard bus load for a period of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> without recharging.

A battery service test, as defined in Institute of Electrical and Electronics Engineers (IEEE)

Standard 450-1995, is performed using a load bank to apply a load on the batterythat results in a discharge current greater than 850 amps. The component test is performed on each fully charged as-built EDS battery that has beenconnected to a charger maintained at 135+/- 1 Vfor a period ofno less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to thetest. The EDS battery is disconnected from the battery charger and a load bank is then connected to the output ofthe battery, adjusted to a discharge current greater than 850 amps. Discharge current and battery terminal voltage at the start ofthe test and upon completion ofthe 2-hour test are recorded on data sheets included in the component test package work orders (References 1 and 2). The EDS battery discharge current and terminal voltage measurements are summarized in Attachment A and demonstrate that each EDS battery meets the acceptance criteria.

The Unit 3 and Unit 4 component test results confirm the battery terminal voltage is greater than orequal to 105 Vafter a period ofno less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with an equivalent load greater than 850 amps.

The Unit 3 and Unit 4 componenttest package work orders (References 1 and 2) are available for NRC inspection as part of the Unit 3 and Unit 4 ITAAC 2.6.02.02b Completion Packages (References 3 and 4).

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 3 of 4 List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

References favaiiabie for NRG inspection)

1. SNC921189, Rev. 0, "EDS Battery Load Test Test - ITAAC: SV3-2.6.02.02b"
2. SNCXXXXXX, Rev. X, "EDS Battery Load Test Test - ITAAC: SV4-2.6.02.02b"
3. 2.6.02.02b-U3-CP-Rev X "Completion Package for Unit 3 ITAAC 2.6.02.02b [Index Number 594]"
4. 2.6.02.02b-U4-CP-Rev X "Completion Package for Unit 4 ITAAC 2.6.02.02b [Index Number 594]"
5. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"

U.S. Nuclear Regulatory Commission ND-18-0504 Enclosure Page 4 of 4 Attachment A System: Non-Class 1E do and Uninterruptible Power Supply System Test Discharge Pre-test Test Discharge Current, Voltage &

Unit Component Name* Tag No.* Voltage Current, Voltage &

Time at End

& Time Time at Start (2+ Hours)

XXXA XXXA XXXV 3 Load Group 1 Battery EDS1-DB-1 YYYV YYYV hh:mm hh:mm hh:mm XXXA XXXA XXXV 3 Load Group 2 Battery EDS2-DB-1 YYYV YYYV hh:mm hh:mm hh:mm XXXA XXXA XXXV 3 Load Group 3 Battery EDS3-DB-1 YYYV YYYV hh:mm hh:mm hh:mm XXXA XXXA XXXV 3 Load Group 4 Battery EDS4-DB-1 YYYV YYYV hh:mm hh:mm hh:mm XXXA XXXA XXXV 4 Load Group 1 Battery EDS1-DB-1 YYYV YYYV hh:mm hh:mm hh:mm XXXA XXXA XXXV 4 Load Group 2 Battery EDS2-DB-1 YYYV YYYV hh:mm hh:mm hh:mm XXXA XXXA XXXV 4 Load Group 3 Battery EDS3-DB-1 YYYV YYYV hh:mm hh:mm hh:mm XXXA XXXA XXXV 4 Load Group 4 Battery EDS4-DB-1 YYYV YYYV hh:mm hh:mm hh:mm Notes:

  • Excerpt from COL Appendix C, Table 2.6.2-2