ND-18-0292, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.5.05.01 (Index Number 564)
| ML18059A209 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/28/2018 |
| From: | Yox M Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of New Reactors |
| References | |
| ITAAC 2.5.05.01, ND-18-0292 | |
| Download: ML18059A209 (7) | |
Text
Southern Nuclear FEB 2 8 ?ni8 Docket Nos.:
52-025 52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Michael J. Vox Regulatory AffairsDirector Vogtie 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tei 410-474-8587 ceil myox@soutfiernco.com ND-18-0292 10CFR 52.99(c)(3)
Southern Nuclear Operating Company Vogtie ElectricGenerating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.5.05.01 [Index Number 5641 Ladies and Gentlemen:
Pursuantto 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of February26, 2018, Vogtie Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, andAcceptance Criteria (ITAAC) Item 2.5.05.01 [Index Number 564] has not been completed greaterthan 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC thathave not been completed 225-days prior to initial fuel load.'
This notification is informed bythe guidance described in NEI 08-01, Industry Guideline forthe ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, oranalyses have not been performed orhave beenonly partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).
This letter contains no new NRC regulatory commitments.
If there are any questions, please contact Tom Petrak at 706-848-1575.
Respectfully submitted.
Michael J. Vox Regulatory Affairs Director Vogtie 3 &4
U.S. Nuclear Regulatory Commission ND-18-0292 Page 2 of 4
Enclosure:
Vogtle ElectricGenerating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.5.05.01 [Index Number564]
MJY/LBP/amw
U.S. Nuclear Regulatory Commission ND-18-0292 Page 3 of 4 To:
Southern Nuclear Operatina Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)
Mr. M. D. Rauckhorst (w/o enclosures)
Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)
Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. D. Williams Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. 0. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE; VND.LI.L06 File AR.01.02.06 cc:
Nuclear Reoulatorv Commission Mr. W. Jones (w/o enclosures)
Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Oaiethoroe Power Corporation Mr. R. B. Brinkman Municipal Electric Authorltv of Georgia Mr. J. E. Fuller Mr. S. M. Jackson
U.S. Nuclear Regulatory Commission ND-18-0292 Page 4 of 4 Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
Mr. D. 0. Durham (w/o enclosures)
Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.
Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham
U.S. Nuclear Regulatory Commission ND-18-0292 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-18-0292 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.5.05.01 [Index Number 564]
U.S. Nuclear Regulatory Commission ND-18-0292 Enclosure Page 2 of 3 ITA AC Statement Design Commitment
- 1. The functional arrangement of the IIS is as described in the Design Description of this Section 2.5.5.
Inspections/Tests/Analvses Inspection of the as-built system will be performed.
Acceptance Criteria The as-built IIS conforms with the functional arrangement as described in the Design Description of this Section 2.5.5.
ITAAC Completion Description An inspection ofthe as-built In-core Instrumentation System (IIS) is conductedaftercompletion of construction to confirm that the functional arrangement of the IIS is as described in the Design Description of Combined License (COL) Appendix C, Section 2.5.5. This inspection encompasses the structures, systems, and components (SSCs) identified in the COL Appendix C, Section 2.5.5, Design Description.
The inspection (walkdown) is completed in accordance with APP-GW-lTY-004, Functional Arrangement ITAAC Guideline (Reference 1),which requires the preparation ofa detailed inspection plan. This inspection plan includes the use ofdetaileddrawings such as Piping and Instrumentation Drawings (P&IDs) or Single Line Elementary Drawingsto perform visual observations and compare the as-built system to the Design Description.
The inspection results are documented in the Unit 3 and Unit 4 Principal Closure Documents XXX and YYY (References 2 and 3, respectively) supporting the Unit 3 and Unit 4 ITAAC 2.5.05.01 Completion Packages (References 4 and 5, respectively) and verify that the SSCs are physically arranged and locatedto perform the functions described in the Design Description. The inspection results confirm that the as-built IIS conforms with the functional arrangement as described in the COL Appendix C, Section 2.5.5, Design Description.
The Unit 3 and Unit 4 Principal Closure Documents XXX and YYY are available for NRC inspection as part of the Unit 3 and Unit 4 ITAAC 2.5.05.01 Completion Packages.
List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern NuclearOperating Company (SNC) performeda review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.
U.S. Nuclear Regulatory Commission ND-18-0292 Enclosure Page 3 of 3 References favailable for NRG insDection)
- 1. APP-GW-ITY-004, Functional Arrangement Guideline 2.
Principal Closure Document XXX (Unit 3) 3.
Principal Closure Document YYY (Unit4) 4.
ITAAC 2.5.05.01 Completion Package (Unit3) 5.
ITAAC 2.5.05.01 Completion Package (Unit4)