Exelon Generation January 10, 2018 RS-18-008 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001 Byron Station, Unit 2 Renewed Facility Operating License No. NPF-66 NRG Docket No. STN 50-455 4300 Winfield Road Warrenville, IL60555 630 657 2000 Office 10 CFR 50.55a
Subject:
Correction to lnservice Inspection Program Third Interval Relief Request l3R-15
References:
- 1) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to NRG, "lnservice Inspection Program Third Interval Relief Requests l3R-12 and 13R-15," dated June 29, 2017
- 2) Email from Joe Wiebe (NRG) to J. A. Bauer (Exelon Generation Company, LLC), "Preliminary Request for Additional Information Regarding Byron Station Relief Request 13R-15 (CAC/EPID No.
000976/05000455/L-2017-LLR-0056)," dated December 21, 2017 In Reference 1, Exelon Generation Company, LLC (EGG) requested NRG approval of Relief Requests 13R-12 and 13R-15 in accordance with 10 CFR 50.55a, "Codes and standards,"
paragraph (g)(5)(iii) due to impracticality of satisfying the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components." Reference 1 noted that the subject relief requests are associated with the third interval for Units 1 and 2, which ended July 15, 2016; and that Relief Request 13R-12 is applicable to Units 1 and 2 whereas Relief Request 13R-15 is applicable to Unit 2 only. Note that since Relief Request 13R-12 is applicable to both Unit 1 and Unit 2, Reference 1 was submitted on both the Byron Station Unit 1 and Unit 2 dockets.
As noted in Reference 2, during review of the subject relief requests, the NRC identified that Relief Request 13R-15, Section 1.0, "ASME Code Components Affected," only lists components for Byron Station, Unit 2 (as intended); whereas the subsequent Section 7.0, "Duration of Proposed Alternative," requests relief for Byron Station, Units 1 and 2. The NRC requested that EGC clarify of the applicability of Relief Request 13R-15.
January 1 O, 2018 U. S. Nuclear Regulatory Commission Page2 EGC is confirming that Relief Request 13R-15 is only applicable to Byron Station Unit 2. The original verbiage in Relief Request 13R-15, Section 7.0 stated the following:
Relief is requested for the Third Ten-Year lnservice Inspection (/SI) Interval for Byron Station, Units 1 and 2. For the examination categories applicable to this relief, the Third Interval for Byron Station Units 1 and 2 began on January 16, 2006 and concluded on July 15, 2016.
This section was intended to state:
Relief is requested for the Third Ten-Year lnservice Inspection (/SI) Interval for Byron Station, Unit 2. For the examination categories applicable to this relief, the Third Interval for Byron Station Unit 2 began on January 16, 2006 and concluded on July 15, 2016.
There are no regulatory commitments contained within this letter. Should you have any questions concerning this submittal, please contact Joseph A. Bauer at 630 657-2804.
Respectfully,
~~
David M. Gullatt Manager - Licensing Exelon Generation Company, LLC cc:
NRG Regional Administrator-Region Ill NRG Senior Resident Inspector-Byron Station NRC Project Manager, NRR - Byron Station Illinois Emergency Management Agency - Division of Nuclear Safety