L-98-092, Forwards FPL Summary Rept on Changes,Tests & Experiments Made Without Prior Commission Approval, for Period from 960408-971013 & Reload SE Summaries for Unit 3 Cycle 16, & Unit 4 Cycle 17,dtd 971022
| ML17354A883 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/10/1998 |
| From: | Hovey R FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17354A884 | List: |
| References | |
| L-98-092, L-98-92, NUDOCS 9804160404 | |
| Download: ML17354A883 (4) | |
Text
DA.J NLBUKX J.
REGUL INFORMATION DISTRIBUTI SYSTEM (RIDS)
CCESSION NBR:9804160404 DOC.DATE: 98/04/10 NOTARIZED: NO DOCKET FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power.and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and L'ight C 05000251 AUTH.NAME AUTHOR AFFILIATION HOVEY,R.J.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION ky~v'~
Document Control Branch (Document Control Desk)
SUBJECT:
Forwards FPL summary rept on "Changes, Tests
& experiments Made Without Prior Commission Approval," for period from 960408-971013,attached.
DISTRIBUTION CODE: IE47D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 50.59 Annual Report of Changes, Tests or Experiments Made W/out NOTES'.
Approv E
RECIPIENT
~ 'D CODE/NAME P
D INTERNAL:
ILE CENTE
" EXTERNAL: NOAC COPIES LTTR ENCL 1
0 1
1 1
1 RECIPIENT XD CODE/NAME JABBOUR,K RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1.
1 1
1 1
1 0
D E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 6
ENCL 5
ApR 10 1998 L-98-092 10 CFR 550.59 U.
S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 IP Re:
Turkey Point Units 3
4 Docket Nos.
50-250 and 50-251 10 CFR 50.59 Re ort Florida Power and Light Company's summary report on "Changes, Tests and Experiments Made Without Prior Commission Approval, "
for the period from April 8, 1996 through October 13, 1997, is attached.'It also contains a summary of the Power Operated Relief Valve actuations, and the results of the Units 3 and 4 steam generator tube inspections, which occurred during that time. This report also includes the reload safety evaluation summaries for Unit 3 Cycle 16, dated May 7,
- 1997, and Unit 4 Cycle 17, dated October 22, 1997.
Very truly yours, R. J.
Hovey Vice President Turkey Point Plant CLM Attachment cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector,
- USNRC, Turkey Point Plant 9804160404
'rr804%0 PDR ADOCK 05000250 R
t