ML17354A493

From kanterella
Jump to navigation Jump to search
Forwards One Copy of Newly Issued EPIP O-EPIP-20132, Technical Support Ctr Activation & Operation & Recovery Plan.
ML17354A493
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/02/1997
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17354A494 List:
References
L-97-124, NUDOCS 9705070115
Download: ML17354A493 (4)


Text

vn.J DVVZC,L J.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9705070115 DOC.DATE: 97/05/02 NOTARIZED: NO DOCKET ¹ FACIL:50-.250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HOVEY,R.J. Florida Power & Light Co.

RECIP.NAME ;RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards one copy of newly issued EPIP O-EPIP-20132, "Technical Support Ctr Activation & Operation" &'Recovery Plan."

DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, C T NOTES: Ef RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID "CODE/NAME LTTR ENCL PD2-3 PD "1 1 CROTEAU,R 1 1 INTERNAL: AEOD/HAGAN,D 1 1 2 2 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 Y' EXTERNAL: NOAC 1 1 NRC PDR 1 1 p C N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

4a MAY L-97-124 i 1997 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission Attn: Docruncnt Control Desk Washington, D. C. 20555 Rc: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Rccovcrv Plan and Emer cncv Plan lm lementin Procedure In accordance svith thc requircmcnts of 10 CFR 50, Appcndiz E, enclosed is one copy of newly issued Emcrgcncy Plan Implcmcnting Proccdurc O-EPIP-20132, "Tcchnical Support Ccntcr (TSC) Activation and Operation." Thc prcdcccssor to this proccdurc divas EPIP-20132. Thc net procedure number is 0-EPIP-20132. Thc primary reason for the change divas to upgrade thc format of the old procedure. Thc new proccdurc also includes notification forms and svorkshccts, additional instructions for communicators and status board kccpcrs, and includes some editorial changes. Old procedure EPIP-20132 has been canceled.

Thc implcmcntation date for O-EPIP-20132, and thc cancellation date for EPIP-20132, is April 28, 1997.

Also cncloscd is onc copy ol'thc Turkey Point Rccovcry Plan. Thc Recovery Plan has bccn rewritten as a site specific document, and nosv includes an Offsitc Post-hurricane Checklist. Revision I of the Recovery Plan was reviewed and approved by the Plant Nuclear Safety Committee to ensure a formal review process. The Rccovcry Plan divas approved on May 1, 1997, and will be reviewed yearly.

FPL has dctcrmincd that thc changes described do not result in a dccrcase in thc effectiveness of the Emcrgcncy Plan.

Should there bc any questions, please contact us.

Very truly yours, R. J. Hovcy Vice Prcsidcnt Turkey Point Plant CLM Enclosure cc: Luis A Rcycs, Regional Administrator, Region II, USNRC (2 copies)

T. P. Johnson, Senior Rcsidcnt Inspector, USNRC, Turkey Point'Plant (iv/o enclosure) h +AQQ.

'ir705070ii5 970502 PDR ADOCK 05000250 F PDR IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII an FPL Group cornpanr

0