Letter Sequence Request |
---|
EPID:L-2017-LLA-0435, License Amendment Request to Update Appendix B to the Renewed Facility Operating License to Incorporate 2017 Biological Opinion (Approved, Closed) |
|
|
|
---|
Category:Letter type:GO
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor2022-10-17017 October 2022 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-085, Docket No. 50-397, Evacuation Time Estimate Analysis2022-08-30030 August 2022 Docket No. 50-397, Evacuation Time Estimate Analysis GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-22-072, Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing2022-07-11011 July 2022 Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-22-062, Registration of Spent Fuel Cask Use2022-05-19019 May 2022 Registration of Spent Fuel Cask Use GO2-22-049, Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors2022-05-10010 May 2022 Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors GO2-22-054, Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report2022-05-0909 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report GO2-22-056, Registration of Spent Fuel Cask Use2022-04-21021 April 2022 Registration of Spent Fuel Cask Use GO2-22-055, 2021 Annual Environmental Operating Report2022-04-20020 April 2022 2021 Annual Environmental Operating Report GO2-22-048, 2021 Annual Radioactive Effluent Release Report2022-04-15015 April 2022 2021 Annual Radioactive Effluent Release Report GO2-22-045, Registration of Spent Fuel Cask Use2022-04-0606 April 2022 Registration of Spent Fuel Cask Use GO2-22-044, Level of Financial Protection - Annual Reporting Requirement2022-03-21021 March 2022 Level of Financial Protection - Annual Reporting Requirement GO2-22-038, Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462022-03-0909 March 2022 Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-22-031, Response to Audit Plan and Online Reference Portal Request2022-02-15015 February 2022 Response to Audit Plan and Online Reference Portal Request GO2-22-011, Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report2022-02-0808 February 2022 Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-02-0303 February 2022 License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-012, Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report2022-01-24024 January 2022 Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report 2024-01-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-02-0303 February 2022 License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-21-133, License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-11-0909 November 2021 License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GO2-21-016, License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits2021-10-13013 October 2021 License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits GO2-21-042, License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement2021-05-0808 May 2021 License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement GO2-20-104, On-Site Cooling System Sediment Disposal2020-12-21021 December 2020 On-Site Cooling System Sediment Disposal GO2-20-108, License Amendment Request to Adopt TSTF-439, Elinate Second Completion Times Limitng Time from Discovery of Failure to Meet an LCO2020-12-0202 December 2020 License Amendment Request to Adopt TSTF-439, Elinate Second Completion Times Limitng Time from Discovery of Failure to Meet an LCO GO2-20-095, Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements GO2-20-063, Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System2020-04-15015 April 2020 Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System GO2-20-052, Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems2020-04-15015 April 2020 Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems GO2-20-004, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-01-27027 January 2020 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR GO2-20-008, License Amendment Request to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-27027 January 2020 License Amendment Request to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process GO2-19-090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-08-15015 August 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program GO2-19-053, License Amendment Request to Remove Operating License Condition 2.C.(11) and Attachment 32019-03-27027 March 2019 License Amendment Request to Remove Operating License Condition 2.C.(11) and Attachment 3 GO2-19-027, License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System2019-02-25025 February 2019 License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System GO2-17-137, License Amendment Request to Update Appendix B to the Renewed Facility Operating License to Incorporate 2017 Biological Opinion2017-12-18018 December 2017 License Amendment Request to Update Appendix B to the Renewed Facility Operating License to Incorporate 2017 Biological Opinion GO2-17-181, License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-12-12012 December 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements GO2-17-038, License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-10-23023 October 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. GO2-17-028, License Amendment Request for Change to Technical Specification 3.5.1, ECCS-Operating.2017-07-25025 July 2017 License Amendment Request for Change to Technical Specification 3.5.1, ECCS-Operating. GO2-17-009, License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies2017-03-27027 March 2017 License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies GO2-17-062, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 22017-03-27027 March 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2 GO2-16-119, License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A2016-11-0808 November 2016 License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A ML16243A5152016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System ML16244A8332016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-1-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. ML16210A5282016-07-28028 July 2016 Request for Amendment to Emergency Plan GO2-16-087, License Amendment Request for Changes to Technical Specification 2.1.1, Reactor Core SLs2016-07-12012 July 2016 License Amendment Request for Changes to Technical Specification 2.1.1, Reactor Core SLs GO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate2016-06-28028 June 2016 License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate GO2-16-079, Erratum for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance2016-05-18018 May 2016 Erratum for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance GO2-16-046, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance2016-05-10010 May 2016 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance GO2-16-047, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 02016-03-0303 March 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0 GO2-15-070, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2015-09-0202 September 2015 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process GO2-16-112, License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg.2015-06-17017 June 2015 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. GO2-15-075, Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High.2015-05-15015 May 2015 Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. GO2-15-007, License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 32015-03-17017 March 2015 License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 ML14336A0062014-11-17017 November 2014 License Amendment Request for Technical Specification Change to Safety Limit Minimum Critical Power Ratio ML14268A2332014-09-0404 September 2014 Erratum for License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-14-126, License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink2014-08-22022 August 2014 License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink ML14234A4572014-08-12012 August 2014 License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-14-103, Proposed Revision to License Amendment Request to Adopt TSTF-493, Revision 4, Option a, and Response to Request for Additional Information2014-06-19019 June 2014 Proposed Revision to License Amendment Request to Adopt TSTF-493, Revision 4, Option a, and Response to Request for Additional Information ML14086A3892014-03-18018 March 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-535, Revision 0 ML13316A0092013-10-31031 October 2013 License Amendment Request for Change to Emergency Core Cooling Systems Surveillance Requirements GO2-13-138, License Amendment Request for Adoption of TSTF-493, Revision 4, Option a2013-10-0202 October 2013 License Amendment Request for Adoption of TSTF-493, Revision 4, Option a ML13247A6592013-07-25025 July 2013 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF 477, Revision 3 GO2-13-002, License Amendment Request to Implement Prnm/Arts/Mellla - Revised Reports2013-01-0707 January 2013 License Amendment Request to Implement Prnm/Arts/Mellla - Revised Reports GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License 2024-01-30
[Table view] |
Text
William G. Hettel Vice President, Operations P.O. Box 968, Mail Drop PE23 Richland, WA 99352-0968 Ph. 509-377-8311 F. 509-377-4674 wghettel@energy-northwest.com December 18, 2017 GO2-17-137 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LICENSE AMENDMENT REQUEST TO UPDATE APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE TO INCORPORATE 2017 BIOLOGICAL OPINION
Reference:
Letter dated March 23, 2017, J.J. Rikhoff (NRC) to M.E. Reddemann (Energy Northwest), Transmittal of the National Marine Fisheries Services March 10, 2017, Final Biological Opinion for Columbia Generating Station
Dear Sir or Madam:
In accordance with the provisions of 10 CFR 50.90, "Application of License or Construction Permit," Energy Northwest hereby requests an amendment to the Renewed Facility Operating License for Columbia Generating Station (Columbia).
The proposed change revises the Environmental Protection Plan (EPP) Section 4.2 to incorporate the terms and conditions (T&Cs) of the Incidental Take Statement included in the Biological Opinion (referenced above) issued to Energy Northwest by the National Marine Fisheries Service (NMFS) on March 10, 2017. Additionally, the proposed language in the EPP will clarify that Energy Northwest must adhere to the currently applicable Biological Opinion in order to preclude the need for a license amendment request in the event NMFS issues a new or revised Biological Opinion in the future. of this submittal provides a description of the change and a determination that this change involves no significant hazards consideration. The bases for these determinations are included in Enclosure 1 of this submittal. Enclosure 2 provides a marked up copy of Columbias EPP. Clean pages of the proposed EPP change are included as Enclosure 3 of this submittal.
G02-17-137 Page 2 of 2 No regulatory commitments are contained in this submittal. However, the Biological Opinion includes the Incidental Take Statement and T&Cs that NMFS has determined to be necessary or appropriate to minimize the amount or extent of incidental take. NRC approval of the license amendment request obligates Energy Northwest to comply with the Incidental Take Statement and T&Cs.
In accordance with 10 CFR 50.91, Energy Northwest is notifying the State of Washington of this amendment request by transmitting a copy of this letter and enclosures to the designated State Official.
Approval of the proposed amendment is requested within one year of the date of the submittal. Once approved, the amendment shall be implemented within 60 days.
If there are any questions or if additional information is needed, please contact Ms. L. L.
Williams, Licensing Supervisor, at 509-377-8148.
I declare under penalty of perjury that the foregoing is true and correct.
Executed this ~ Tt( day of J>~~~ 2017.
Respectfully, WG Hettel Vice President, Operations
Enclosures:
As stated cc: NRC RIV Regional Administrator NRC NRR Project Manager NRC Senior Resident lnspector/988C CD Sonoda - BPA/1399 (email)
EFSECutc.wa.gov- EFSEC (email)
RR Cowley - WDOH (email)
WA Horin -Winston & Strawn
GO2-17-137 Page 1 of 4 EVALUATION OF PROPOSED CHANGE 1.0
SUMMARY
DESCRIPTION On March 10, 2017, the National Marine Fisheries Service (NMFS) issued the 2017 Biological Opinion (Opinion) (Reference 1) to the Nuclear Regulatory Commission (NRC) related to Columbia Generating Station (Columbia). The Opinion was the result of formal consultation between the NRC and NMFS under Section 7 of the Endangered Species Act of 1973, as amended (ESA).
The Opinion concluded that Columbias continued operation through the duration of the renewed facility operating license period is not likely to jeopardize the continued existence of Upper Columbia River (UCR) spring-run Chinook salmon or UCR steelhead or destroy or adversely modify either species designated critical habitat.
However, the Opinion provided an Incidental Take Statement related to Columbias operation. Incidental take is defined by regulation as takings that result from, but are not the purpose of, carrying out an otherwise lawful activity conducted by the Federal agency or applicant (50 CFR 402.02). ESA Section 7(b)(4) and section 7(o)(2) provide that taking that is incidental to an otherwise lawful agency action is not considered to be prohibited taking under the ESA if that action is performed in compliance with the terms and conditions (T&Cs) of the Incidental Take Statement. The Opinion also includes associated T&Cs that NMFS has determined to be necessary or appropriate to minimize the amount or extent of incidental take. The T&Cs are non-discretionary and compliance with the T&Cs must be a requirement of Columbias renewed license.
Therefore Appendix B, Environmental Protection Plan (EPP), of Columbias renewed facility operating license requires an amendment. Section 4.2 of Columbias EPP currently requires Energy Northwest to perform Environmental Monitoring on soil and vegetation for cooling tower drift. Energy Northwest proposes the addition of a section to the EPP that requires Columbias adherence to the specific requirements within the Incidental Take Statement associated with the Opinion. The addition allows Energy Northwest to take advantage of the protective coverage of ESA Section 7(o)(2) afforded by compliance with the Incidental Take Statement conditions. Energy Northwest wishes to exclude the date designation of the Opinion referenced in the EPP and instead to refer to the currently applicable Opinion to preclude the need for a new license amendment request in the event NMFS issues a new or revised Opinion in the future.
The specific requirements and Incidental Take Statement limits are specified in plant procedures and/or managed per routine change management tasks (i.e., licensee planned actions).
GO2-17-137 Page 2 of 4
- 2. DETAILED DESCRIPTION OF THE PROPOSED CHANGE The proposed amendment revises Columbias EPP Section 4.2, with the addition of Section 4.2.2 Aquatic Issues which is reproduced below in its entirety.
Section 4.2.2 Aquatic Issues In accordance with Section 7(a) of the Endangered Species Act, National Marine Fisheries Service (NMFS) issued a Biological Opinion that prescribes an Incidental Take Statement and mandatory terms and conditions.
Energy Northwest shall adhere to the specific requirements within the Incidental Take Statement in the currently applicable Biological Opinion.
Changes to the Incidental Take Statement or the terms and conditions must be preceded by consultation between the NRC, as the authorizing agency, and NMFS.
- 3. TECHNICAL EVALUATION Energy Northwests proposed change to Section 4.2, Environmental Monitoring of its EPP is more restrictive than the existing language and institutes the NMFS Biological Opinion related to Columbia. The NRC relies on NMFS guidance issued under ESA Section 7 for any issues related to endangered aquatic species. As stated above, the Opinion was issued after formal consultation between the NRC and NMFS.
The proposed change is exclusive to biological opinions issued by NMFS, therefore the general language related to the currently applicable Opinion applies only to NMFS and any opinions it may issue in the future related to Columbia.
- 4. REGULATORY EVALUATION 4.1 APPLICABLE REGULATORY REQUIREMENTS The regulatory basis for the establishment of the EPP is contained in 10 CFR 50.36b, Environmental conditions. This section provides that a license may include conditions to protect the environment during operation and decommissioning. Such conditions will be derived from information contained in the environmental report.
4.2 PRECEDENT In Reference 2, the NRC has approved a similar license amendment to provide generic reference to the currently applicable Biological Opinion in the EPP.
GO2-17-137 Page 3 of 4 4.3 SIGNIFICANT HAZARDS CONSIDERATION Energy Northwest requests an amendment to Renewed Facility Operating License No NPF-21, Appendix B, Environmental Protection Plan, for Columbia Generating Station.
Energy Northwest has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below.
- 1) Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The changes are administrative in nature and would in no way affect the initial conditions, assumptions, or conclusions of Columbias accident analyses. In addition, the proposed changes would not affect the operation or performance of any equipment assumed in the accident analyses.
Therefore there is no significant increase in the probability or consequences of an accident previously evaluated.
- 2) Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously analyzed?
Response: No.
The changes are administrative in nature and would in no way impact or alter the configuration or operation of the facility and would create no new modes of operation.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3) Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The changes are administrative in nature and would in no way affect plant or equipment operation or the accident analysis.
Therefore, the proposed change does not involve a significant reduction in the margin of safety.
GO2-17-137 Page 4 of 4 Based on the above, Energy Northwest concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
4.4 CONCLUSION
S Based on the considerations discussed above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the applicable regulations as identified herein, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
There are no environmental protection requirements established by other Federal, State, or local agencies that are being reduced by this license amendment request.
The criteria set out in 10 CFR 51.22(c)(10) provides for identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. Issuance of an amendment to a permit or license pursuant to Part 50 is eligible for categorical exclusion if (i) it changes surety, insurance, and/or indemnity requirements, or (ii) it changes recordkeeping, reporting, or administrative procedures or requirements . . . .
The proposed license amendment revises Columbias Renewed Facility Operating License to implement the requirements in the currently applicable NMFS Biological Opinion. The proposed license amendment changes administrative requirements and therefore, meets the criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10).
Energy Northwest has determined, pursuant to 10 CFR 51.22(b), that an environmental impact statement or environmental assessment need not be prepared in connection with issuance of this amendment.
6.0 REFERENCES
- 1. Letter from J.J. Rikhoff (NRC) to M.E. Reddemann (Energy Northwest),
Transmittal of the National Marine Fisheries Services March 10, 2017, Final Biological Opinion for Columbia Generating Station, dated March 23, 2017, (ADAMS Accession Number ML17072A270).
- 2. Letter from P.H. Buckberg (NRC) to M. Nazar (FPL), "St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments to Update Appendix B to the Renewed Facility Operating Licenses to Incorporate the 2016 Biological Opinion (CAC Nos.
MF7661 and MF7662), dated December 5, 2016, (ADAMS Accession Number ML16251A128).
GO2-17-137 Enclosure 2 Proposed Columbia Appendix B Environmental Protection Plan Changes (Mark-Up)
4.0 Environmental Conditions 4.1 Unusual or Important Environmental Events Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to plant operation shall be recorded and reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> followed by a written report per Subsection 5.4.2. The following are examples: excessive bird impaction events, onsite plant or animal disease outbreaks, mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973, fish kills, increase in nuisance organisms or conditions, and a significant, unanticipated or emergency discharge of waste water or chemical substances.
No routine monitoring programs are required to implement this condition.
4.2 Environmental Monitoring 4.2.1 Cooling Tower Drift Study A terrestrial monitoring program shall be conducted to verify the level of effect from cooling tower drift. Soil and vegetation samples will be collected at locations subject to drift deposition and at control stations and analyzed for relevant chemical and physical parameters. Samples will be collected once per year during the seasonal peak of plant growth commencing no later than 18 months after issuance of a full power (100%) license. This program shall be terminated when data from three growing seasons after commencement of full power operation have been collected, provided the data support hypotheses of no adverse effects. Results and interpretation shall be included as part of the Annual Environmental Operating Report (Subsection 5.4.1).
4.2.2 Aquatic Issues In accordance with Section 7(a) of the Endangered Species Act, National Marine Fisheries Service (NMFS) issued a Biological Opinion that prescribes an Incidental Take Statement and mandatory terms and conditions.
Energy Northwest shall adhere to the specific requirements within the Incidental Take Statement in the currently applicable Biological Opinion. Changes to the Incidental Take Statement or the terms and conditions must be preceded by consultation between the NRC, as the authorizing agency, and NMFS.
4-1 Amendment No. 225
GO2-17-137 Enclosure 3 Proposed Columbia Appendix B Environmental Protection Plan Change (Re-typed)
4.0 Environmental Conditions 4.1 Unusual or Important Environmental Events Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to plant operation shall be recorded and reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> followed by a written report per Subsection 5.4.2. The following are examples: excessive bird impaction events, onsite plant or animal disease outbreaks, mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973, fish kills, increase in nuisance organisms or conditions, and a significant, unanticipated or emergency discharge of waste water or chemical substances.
No routine monitoring programs are required to implement this condition.
4.2 Environmental Monitoring 4.2.1 Cooling Tower Drift Study A terrestrial monitoring program shall be conducted to verify the level of effect from cooling tower drift. Soil and vegetation samples will be collected at locations subject to drift deposition and at control stations and analyzed for relevant chemical and physical parameters. Samples will be collected once per year during the seasonal peak of plant growth commencing no later than 18 months after issuance of a full power (100%) license. This program shall be terminated when data from three growing seasons after commencement of full power operation have been collected, provided the data support hypotheses of no adverse effects. Results and interpretation shall be included as part of the Annual Environmental Operating Report (Subsection 5.4.1).
4.2.2 Aquatic Issues In accordance with Section 7(a) of the Endangered Species Act, National Marine Fisheries Service (NMFS) issued a Biological Opinion that prescribes an Incidental Take Statement and mandatory terms and conditions.
Energy Northwest shall adhere to the specific requirements within the Incidental Take Statement in the currently applicable Biological Opinion. Changes to the Incidental Take Statement or the terms and conditions must be preceded by consultation between the NRC, as the authorizing agency, and NMFS.
4-1 Amendment No. 225