L-94-268, Forwards COLR for Turkey Point Units 3 & 4
| ML17352A846 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/26/1994 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17352A847 | List: |
| References | |
| L-94-268, NUDOCS 9411010357 | |
| Download: ML17352A846 (3) | |
Text
P'H.jr:C)R.IT V (ACCELERATED RIDS PROCI'.SSIiG REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~
'CCESSION NBR:9411010357 DOC.DATE: 94/10/26 NOTARIZED: NO FACIL:50'-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light, C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "COLR for Turkey Point Units 3
6 4."
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR i
ENCLf SIZE:
TITLE: OR Submittal:
General Distribution NOTES DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA CROTEAU,R INTERNA~EILE CENTER Q1 ARR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1,1 1
'1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DE/EELB NRR/DRPW NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 NOTE TO ALL"RIDS'ECIPIENTS:
PLEASE HELP US TO REDUCE iVKSTE!CONTACT'11IE DOCI:WIENTCONTROL DESK, ROOAI PI-37 (EXT. 504-0083
) TO ELIiIINATEYOUR iAiIL'ROil DISTRIDU'I'IONLIS'I'S I'OR DOCI. 5!EN'I'S YOU DON"I'EI'.D!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 13 ENCL 12
OQ~T 86 1994 L-94-268 10 CFR 50.36 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket No. 50-250 and 50-251 Core 0 eratin Limits Re ort By letter dated October 12,
- 1994, the NRC issued Amendments 167/161 to Facility Operating License No.
DPR-31 and DPR-41 for Turkey Point Units 3 and 4, respectively.
The amendments consisted of changes to the Technical Specifications to relocate certain cycle-specific parameter limits from the Technical Specifications to a Core Operating Limits Report (COLR). In accordance with Technical Specification
'.9.1.7, the enclosed Coze Operating Limits Report is provided for Florida Power and Light Company Turkey Point Units 3 and 4.
These curves are applicable for the current operating cycles of Unit 3 Cycle 14 and for Unit 4 Cycle 15 which is currently in a refueling outage.
If you have any questions, please contact us.
Very 'truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/RJT/rt Attachment cc:
S.
D. Ebneter, Regional Administrator, Region II, USNRC T. P.
- Johnson, Sr. Resident Inspector, USNRC, Turkey Point an FPL Group company 9411010357 941026 PDR ADOCK 050002SO P
4