L-94-076, Forwards COLR for Turkey Point Unit 3, Per TS 6.9.1.7. Curve Applicable for Upcoming Operating Cycle of Unit 3 Cycle 14.Unit 3 Scheduled to Begin Refueling Outage on 940404

From kanterella
(Redirected from ML17352A528)
Jump to navigation Jump to search
Forwards COLR for Turkey Point Unit 3, Per TS 6.9.1.7. Curve Applicable for Upcoming Operating Cycle of Unit 3 Cycle 14.Unit 3 Scheduled to Begin Refueling Outage on 940404
ML17352A528
Person / Time
Site: Turkey Point 
Issue date: 04/01/1994
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17352A529 List:
References
L-94-076, L-94-76, NUDOCS 9404120270
Download: ML17352A528 (3)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM Le REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION'BR:9404120270 DOC.DATE: 94/04/01 NOTARIZED: NO FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "COLR for Turkey Point Unit 3," per TS 6.9.1.7.

Curve applicable for upcoming operating cycle of Unit 3 Cycle 14.Unit 3 scheduled to begin refueling outage on 940404.

DISTRIBUTION CODE A001D COPIES RECEIVED LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:

DOCKET g

05000250 D

RECIPIENT ID CODE/NAME PD2-2 LA CROTEAU,R INTERNAL: NRR/DE/EELB NRR/DRCH/HXCB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB OC FD G FM 01 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 16 ENCL 14

APL AI'V@ t tgq<

L-94-076 10 CFR 50.36 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Re:

Turkey Point Unit 3 Docket No. 50-250 Core 0 eratin Limits Re ort In accordance with Technical Specification 6.9.1.7, the enclosed Core.

Operating Limits Report is provided for Florida Power and Light Company Turkey Point Unit 3.

This curve is applicable for the upcoming operating cycle of Unit 3 Cycle 14.

Unit 3 is scheduled to begin a refueling outage on April 4, 1994.

If you have any questions, please contact us

~

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/RJT/rt Attachment cc:

S.

D. Ebneter, Regional Administrator, Region II, USNRC T.

P.

Johnson, Sr. Resident Inspector, USNRC, Turkey Point r ~rWri 9404120270 940401 PDR ADOCK 05000250 P

PDR an FPL Group company

P/

~4 t 'I tie& <~f

~1 r"