Forwards Rev to Description of 920519 Application for Amends to Licenses DPR-31 & DPR-41,changing TS 6.0 Re Administrative Controls to Reflect Present Organizational Titles & Delete Specific Title Designations
ML17349A314
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/29/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17349A315 List:
References
L-92-208, NUDOCS 9208050290
Download: ML17349A314 (7)


Text

ACCELERATED DISTRIBUTION DEMONSTPATION SYSTEM REGULATE INPORMATION DISTRIBUTIONISTEM (RIDE)

ACCESSION NBR:9208050290 DOC.DATE: 92/07/29 NOTARIZED: YES DOCKET FACIE:80-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards rev to description of amend request & insert A of proposed TS previously submitted on 920519.

SIZE:

DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution J ENCL 4

NOTES NRR RAGHAVANP L 05000250 NRR RAGHAVAN,L 05000251 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 AULUCK,R 2 2 INTERNAL: NRR/DET/ESGB 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST/SELB 7E 1 1 NRR/DST/SICB8H7 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC 1 0 OGC/HDS3 1 0 EG UJ 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 15

P.O. Box 029100, Miami, FL, 33102-9100

~U(. 2 9 i99r L-92-208 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Proposed License Amendments Or anizational Titles and PNSC Com osition By letter L-92-136, dated May 19, 1992, Florida Power and Light Company (FPL) submitted a request to amend the Turkey Point Technical Specifications. In response to a discussion between FPL and the staff on June 23, 1992, a revision to the description of the amendments request and Insert (A) of the Proposed Technical Specifications is submitted. The original description of the amendments request (Attachment 1 of L-92-136) and Insert (A) of Attachment 3 of L-92-136 are superceded in their entirety.

Should there be any questions, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/RJT/rt Attachment CC: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Mr. Jacob Daniel Nash, Florida Department of Health and Rehabilitative Services

~/I:)OQ" 0 9208050290 920729 PDR '

ADOCK 05000280 P PDR )

an FPL Group company

<<4 r,'

h, 4~

STATE OF FLORIDA )

) ss.

COUNTY OF DADE )

T. F. Plunkett being first duly sworn, deposes and says:

That he is Vice President Turke Point Nuclear Plant, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

T. F. Plunkett Subscribed and sworn to before me this day of 1992.

Nunc'of Notary Public (Type or Print)

NO~TARY'PUBLIC, in and for the County of Dade, State of Florida

~ggyy pgSLC SEA% H PL@A CQfSQSOI lÃP SPV27,1QQR My Commission expi Commission No.

T. F. Plunkett is personally known to me.

g ~

S a) f4< i sk"".,"' 'i't;d (,- sw 0

ATTACHMENT TO L-92-208 DESCRIPTION OF AMENDMENTS RE UEST The pzoposed amendment revises Specification 6.0, "Administrative Controls", of the Turkey Point Units 3 and 4 Technical Specifications to (a) reflect the present organizational titles, (b) delete specific title designations for the Plant Nuclear Safety Committee (PNSC),

while at the same time not altering the required composition for areas of expertise, representation by management, or the quorum and (c) correct typographical errors. A description of these changes is provided below.

General Or anizational Titles As a result of a Florida Power and Light Company (FPL) Nuclear Division reorganization, organizational titles have been changed without altering the individuals'esponsibilities. The proposed changes are as follows:

0 Change the reference from "Plant Manager Nuclear" or "Plant Manager" to "Plant General Manager",

o Change the reference from "Operations Superintendent" to "Operations Manager",

o Change the reference from "Site Services Manager Nuclear" to "Services Manager",

o Change the reference from "health physics manager" to "Health Physics Supervisor",

o Change the zefezence from "Plant Supervisor Nuclear" or "Plant Supervisor Nuclear" to "Nuclear Plant Supervisor",

and o Change the reference from "Training Superintendent" to "Training Manager".

These titles are clearly identified at the plant to a specific individual(s), with specific work accountabilities and assignments.

Each individual shall meet or exceed the minimum qualification requirements as specified in Technical Specification 6.3, Facility Staff Qualifications.

In Specification 6.2.2, the wording "applicable department superintendent" is changed to "applicable department manager", since the title of "superintendent" has been eliminated and the title of "manager" substituted.

In Table 6.2-1, the abbreviation "PSN" should be changed to "NPS" to ensure consistency with the revised definition specified in Table 6.2-1 and the change in organizational title from "Plant Supervisor Nuclear" to "Nuclear Plant Supervisor."

ATTACHMENT TO L-92-208 CONT.

FPL Topical Quality Assurance Report (FPLTQAR 1-76A) was revised to reflect the organizational title definitions. Section 1.0 (TQR 1.0) of FPLTQAR 1-76A discusses FPL's organizational structure.

Organizational relationships and responsibilities will continue to be described in detail in FPL Topical Quality Assurance Report. Appendix B of 10 CFR 50 and 10 CFR 50.54 (a) (3) govern changes to the organizations described in the Topical Quality Assurance Report.

Changes to this progzam description which reduce commitments previously accepted by the USNRC will require USNRC approval prior to implementation.

Com osition of Plant Nuclear Safet Committee Specification 6.5.1.2 lists by title the members of the Plant Nuclear Safety Committee (PNSC). This list requires a revisi'on each time an organizational change occurs or when the titles of PNSC members are changed.

The proposed change eliminates the specific reference to an organizational title, and substitutes the composition of the PNSC to be representative of plant management from multi-plant disciplines.

These disciplines include Operations, Maintenance, Health Physics, Reactor Engineering, Services, Technical Support, Licensing, Quality Assurance/Control, and Instrument and Control.

The PNSC member shall meet the requirements as described in Sections 4.2, 4.3, or 4.4 of the ANSI N-18.1-1971, Selection and Training of Nuclear Power Plant Personnel.

Specification 6.5.1.6, Responsibilities, is not impacted by this change.

This amendment request is similar to a license amendment approved for Nebraska Public Power District Cooper Plant.

T o ra hical Errors In Specification 6.9.1.3, the entire word "Offsite Dose Calculation Manual" should be capitalized, to ensure consistency within Technical Specifications Section 6.0 and the Definitions of Section 1.0.

In Specification 6.10.3 o., the wording "Annual Radiological Environmental Monitoring Report(s) " should be changed to "Annual Radiological Environmental Operating Report(s)", to ensure consistency with Specification 6.9.1.3.

In Specification 6.F 1 e., the letters "h" and "p" in the title "health physics', should be capitalized to ensure consistency with Specification Section 6.3.2.