L-85-227, Revised Application to Amend Licenses DPR-31 & DPR-41, Changing Tech Spec 3.3-2 Re Containment Air Lock
| ML17346B077 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/11/1985 |
| From: | Williams J FLORIDA POWER & LIGHT CO. |
| To: | Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17346B079 | List: |
| References | |
| L-85-227, NUDOCS 8506170108 | |
| Download: ML17346B077 (3) | |
Text
DOCKET' 05000250 05000251 REGULATORY I~RMATION DISTRIBUTION SYS1 (RIDS)
ACCESSION N:8506170108 DOC ~ DATE: 85/06/11 NOTARIZED:
NO FACIL:5p-0 Turkey Point Planti Unit 3r Florida Power and Light C
50-!51 Turkey Point Plant< Unit AP Florida Power and Light C
AUTH DNA E AuTHOR AF F ILI ATION NILI IAM EJ.>> ~
Florida Power 8 Light Co ~
RECIP AME RECIPIENT AFFILIATION VARGAE
~ AD Operating Reactors Branch 1
SUBJECT:
Revised application to amend License DPR-31 8
DPR"01'g changing Tech Spec 3,3 2 re containment air lock.
DISTRIBUTION CODE l AOOID COPIES RECEIVED:LTR J ENCL g SIZE:'.
- . f+g TITLE:
OR Submittal; General Distribution NOTES:
OL 0 07/19/72 OL: 00/10/73 05000250 05000251 REC IPIFNT ID CODE/NAME NRR ORBi BC 01 INTERNAl! ACRS 09 ELD/HDSP NRR/DL DIR NRR/DL/TSRG NRR/DSI/RAB RGN2 COPIES LTTR ENCL 7
7 6
6 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB METB F
QQ COPIES LTTR ENCL" 1
0 1
1 1
0 1
1 1
EXTERNAL: 2AX LPDR NSIC 03 05 1
1 1
1 1
1 EGE,G BRUSKEg S NRC PDR 02 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 28 ENCL 25
r l
F
~ &M
'I <
il fi x
'y FLORIDA POWER 8 LIGHTCOMPANY JLN 1
1 1985 L-85-227 Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch /jI Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Varga:
Re:
Turkey Point Units 3 and 0 Docket Nos. 50-250 and 50-25l Proposed License Amendment Containment Inte rit By letter dated January 28,
- 1985, and supplemented on March 2, 1985, FPL submitted proposed revisions to the Turkey Point Units 3
and 0 Technical Specifications related to containment systems.
In the January 28, 1985 submittal, FPL proposed certain changes to clarify the requirements for operability of the containment air lock during the performance of surveillance and/or other testing of the air lock.
To further clarify the intent of that specif ication (T.S.
3.3.0),
FPL has added "containment air lock" prior to "surveillance and/or testing requirements".
A revised page 3.3-2 reflecting this change is attached.
If you have any questions, please call us.
Very truly yours,
. W. Williams, Jr.
Group Vice President Nuclear Energy cc:
Harold F. Reis, Esquire Dr. J. Nelson Grace, NRC Region II JWW/TCG/js Attachment 8506i70108 8506ii FOR AOOCW 0SaoaasO P
PBR l
pool PEOPI E... SERVING PEOPLE