L-89-205, Forwards Rev 15 to Topical QA Rept, Dtd 890608.Changes Do Not Reduce Commitments Made in Program Previously Accepted by NRC
| ML17345A722 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 06/12/1989 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17345A723 | List: |
| References | |
| L-89-205, NUDOCS 8906190143 | |
| Download: ML17345A722 (3) | |
Text
ACCE1Z P>'TED D1GBUTION
])pMaqg~aq REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
COPIES LTTR EQUAL 1
1 1
RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME EDISON,G ACCESSION NBR:8906190143 DOC.DATE: 89/06/12 NOTARIZED: NO DOCKET FACIL:50-000 Generic Docket 05000000 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
05000335 50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
05000389 AUTH.NAME AUTHOR AFFILIATION WOODY,C.O.
Florida Power
& Light Co.
R RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
I
SUBJECT:
Forwards. Rev 15 to "Topical QA Rept."
D DISTRIBUTION CODE:
Q004D COPIES RECEIVED:LTR I
ENCLl SIZE: 7 ~ ~
ta*l>>'
\\
" /~V NOTES:
A.
INTERNAL: ACRS NRR/DLPQ/PEB 10 OC/LFMB RGN2 FILE EXTERNAL: LPDR 1
1 1
1 2
2 IRM/DCB (AMDTS)
OCS~~CT REG FILE NRC PDR 1
1, 1
1' 2
1 D
NOrE 'rO AZZ. "arCS RECZPZWrS.
PLEASE HELP US IQ REDUCE WASTE.'GHZACZ 'IHE ~EN1'ONTROL DESK, ROOM Pl-37 (EXT. 20079)
TO ELIMINATEKSR NAME HKH DISTEGBUTIGN LIP% FOR DOCUMEWXS YOU DGNiT NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL
P.O. Box14000, Juno Beach, FL 33408-0420 JUBB 1 2 1989 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 L-89-205 10 CFR 50.54(a)
Gentlemen:
Re:
Turkey Point Unit Nos.
3 and 4
Docket Nos.
50-250 and 50-251 St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3),
please find attached three enclosures representing the annual update of the Florida Power Light Company Topical Quality Assurance Report (Revision 15, dated June 8,
1989).
Enclosure I is a summary of the changes.
Enclosure II is the revised Topical Report Revision 15.
Changes are indicated on the affected pages by bold vertical print line drawn adjacent to the portion actually changed.
Enclosure III is a
pen and ink mark-up of changed pages to the current Topical Report Revision.
This year's update to the Topical Quality Assurance Report includes three revisions.
These three revisions were driven mainly by the evolution of Florida Power 6 Light Company's Nuclear Organization.
All changes have been reviewed by Quality Assurance and it is concluded that these changes do not reduce the commitments made in our program which has been previously accepted by the NRC.
Should there be any questions, please contact us.
Very truly your.,
~
~
~
~ Acti Senior Vice President Nuclear COW/RG/gp
'906190143 890612 Enclosures PDR ADOCK 05000250 p
PDC cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inpsector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant an FPL Group company l~
I i
!