ML17341A702

From kanterella
Jump to navigation Jump to search
Application to Amend App a of Tech Specs for Licenses DPR-31 & DPR-41,removing Boron Injection Tank Requirements & Allowing for Eventual Removal of Tank from Sys
ML17341A702
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/30/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17341A703 List:
References
L-81-502, NUDOCS 8112110260
Download: ML17341A702 (6)


Text

i REGULA'TOR 'INFORMATION DISTRIBUTION S'r iTiEM 0R IDS)

AOCE,'SSION NBR:811'2110260 DOC ~ DATE: 81/11/30 NOTARIiZED; NO DOCKET FACIL::50 250 Turkey Point ~Planti lUnit 3r Flor ida ~Power -and Light C 05000250

'50 251 Tur key Point ~Plantr ',Uni,t Qi Florida ~Power and Light BYNAME 'C 05000251 "AUTH AUTHOR AFFILIATION UHRIG p'R ~ 6 ~ Florida ~Power 8 Light Co, REiC I'P ~ NAME; RECIPIENT, AFFILIATION EISENHUT~D ~ G ~ Di,vision of Licensing

SUBJECT:

Application Ito amend App A to Tech Speos =for Licenses DPR-31 8 DPR-Qignemoving boron injection ~tank nequirements 8, allowi.ng for eventual removal of;tank from ~sys ~

DISTRIBUTION >CODE: 'A009S )COPIES IREtCEIVED:LTiR, ENCL,g SIZE:,

TITLE: Thermal Shock Ito Reactor Vessel NQTEs: Q/g~gg 4 / /0+

RECIPIENT iCOPIES RECIPIENT COPIES ID CODE/NAME LTiT'R lENCL ID CODE/NAME LVTR ENCL ACTION:- ORB 41 BC Ql 7 7 INTERNAL': ACRS ABBOTT E 1 1 ACRS IGNEgE 1 1 AEOD 1 1 iCOM AUSTIN 1 1

'COM LIAYfg"B 1 1 >CROUSEgR 1 1

,ELD 12 1 '0 IE 07 2 2 IE NOODSg"R 1 1 JOHNSON g'C 1 1 NRR CLIFFORD 1 1 NRR DIR 1 1 NRR GOODNINq E 1 1 NRR HA'ZELTON 1 NRR KLECKER 1 1 NRR LOI S g L 1 1 NRR OREILLY,,P 1 1 NRR iRANDALL 1 1 NRR THROMgE 1 1 NRR VISSINGg G04 1 1 NRR/DE D IR 1 1 NRR/DHFS DHPY09 1 1 NR R/D HF S D IiR 1 1 NRR/DHF S/iP. TjR 8 1 NRR/DL D IiR 1 1 NRR/DL/ADSA 1 1 NRR/DL/ORAB 11 1 0 NRR/DSI DI'R 1 1 NRR/DSI/RAB 1 1 NRR/DSI/RSB 1 1 NR IR 1 1 NRR/DST/GIiB 1 1 F 05 1 1 RES 'BASDEKA'S 1 1 G INS g'M 1 1 'RES/DET 1 1 RES/DRA 1 EXTERNAL; ACRS 10 16 16 L'P DR 03 NRC PDR 02 1 1 NSIC 06 NTI'S 1 1 DEc 17 SH TOTAL NUMBER OF <<COPIES REQUIRED: L>TTR 65 .ENCL 63

.1

'll 'l IL J v

'l A ~

f R

~ t 1 I

I 'If Rf A

0 AA

'll I R I k I

,a, ff Il R II II tf' If

)t II I II JL I'

,I

,I I

j

~.O. BOX 529100 MIAMI,F L 33162 yQLlb~

FLORIDA POWER & LIGHT COMPANY November 30, 1981 L-81-502 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 4fg/p@

Dear Mr. Eisenhut:

Re: Turkey Point Units 3 8I 4 Docket No. 50-250, 50-251 Proposed License Amendment Removal of Boron Injection Tank In accordance with 10 CFR 50.90, Florida Power-5 Light Company submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating License DPR-31 and DPR-41.

This amendment is submitted to allow removal of the I equirement for the Boron Injection Tank (BIT) from the Technical Specifications, and to allow for the BIT's eventual removal from the system. This change will become effective following the installation of the Model 44F steam generators and startup of the Unit from the steam generator repair outage.

To facilitate the change, and to allow continued use ot a common Technical Specification for both units, the portions of the Technical Specifications affected are unchanged,. but are marked with an asterisk. The asterisk denotes the basis for deleting the BIT requirement by referencing to Bases 3.4.1.a.2.

The analytical basis for the removal of the BIT is presented in the attachments. None of the FSAR transients except for the main steamline break (MSLB) are effected by removing the BIT from service. Attachment II presents the core reactivity transients for the MSLB. Attachment III presents the containment pressure response to the MSLB. Both analyses assume the Model 44F steam generator with an integral flow restrictor. Although both analyses used a boron concentration of 2000 ppm in the RWST, Attachment IV verifies that the results are also valid at 1950 ppm, our current Technical Specification value, and also at zero ppm. Attachment V verifies that removal of the BIT's volume of heated water from the Pressurized Thermal Shock Analyses will not affect the results of those analyses.

I The following pages are to be changed:

b p(l(4<<~.goo I

.811fSO 81121102bO 05000250,.

PDR ADQCK '

P ~PDR.

PEOPLE SERVING PEOPLE

gl P

I' 1

C II 1 e~

1f g C

l

Pages 3.4-1 8 3.4-2 References to the BIT are marked with an asterisk and a footnote referencing to the Bases added.

Pa~e 4.5-2 The requi rement for BIT isolation valve tests are marked with an asterisk and a footnote referencing to the Bases added.

Table 4.1-2 Required tests for the BIT have been marked with an asterisk, and Fluoride (F) has been added to the table for consistency with Limiting Condition of Operations.

Bas~es Pa es B3.4-1 and B3.4-2 The requirement for utilization of the BIT as part of the Safety Injection and Residual Heat Rejection Systems is modified by an ast'erisk.

~Bases Pa e 33.6-1 The BIT is removed as a Limiting Condition of Operation for the Chemical and Volume Control System.

The proposed amendment is shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right ha'nd corner.

Enclosed please find a check for $ 4,400 in accordance with 10 CFR 170.22. It has been determined that this represents a Class I and III amendment.

The proposed amendment has been reviewed and approved by the Turkey Point Plant Nuclear Safety Committee and the Florida Power 8 Light Company Nuclear Review Board.

Very truly yours, Robert E. Uhr ig Vice President Advanced Systems 8 Technology REU/JEM/ras cc: .Mr. J. P. O'Reilly, Region II Harold F. Rei s, Esquire

0 I C U

l

\

L