L-80-230, Application to Amend Licenses DPR-31 & DPR-41,changing Tech Specs Re RHR Sys Testing Frequency to 18 Months

From kanterella
(Redirected from ML17340A215)
Jump to navigation Jump to search
Application to Amend Licenses DPR-31 & DPR-41,changing Tech Specs Re RHR Sys Testing Frequency to 18 Months
ML17340A215
Person / Time
Site: Turkey Point  
Issue date: 07/22/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17340A216 List:
References
L-80-230, NUDOCS 8010010542
Download: ML17340A215 (4)


Text

RKGULATORY INFORMATION DISTRIBUTION 'SYSTEM (RIDS)

ACCESSION NBR:80'10010542 DOC ~ DATE: 80/07/22 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant~

Unit 3~ Flor)da Power and Light' 50-251 Turkey Point Planti Unit 4r Florida Power and Light C

AUTH ~ NAME AUTHOR AFF'IL~IATION UHRIG<RE.

Fl ori de Power 8 Light Co.

REC IP ~ NAME RECIPIENT AFF ILIA)ION EISENHUTr D ~

Division of Liicensing 05000251

SUBJECT:

Application to amend Licenses DPR-31 8

DPR-41 changing Tech Specs re RHR sys testing frequency to 18 months DISTRIBUTION CODE:

A001S

'COPIES.RECEIVED:LiTR

ENCL, SIZE:

TITLE: Generail Di st r ibut i on for af te'r Issuance of Operating L'ic NOTES:

'RECIPIENT I'D CODE/NAME ACTION:

VARGAiS ~

04 INTERNAL: D/DIRiHUM FAC08 NRC PDR 02 OR ASSESS BR 10 COP'IES LR:TR,ENCL 1'3 13 1

1 1

1 1

0 RECIPIENT ID CODE/NAME I8E OEL EG 06 1'1 01 COPIES LiTTR;ENCL~

2 2

1 0

1 1

EXTERNAL:

ACRS NSIC 09 05 16 16 1

1 LPDR 03 1

1 OCT 2 1980 37 TOTAL NUMBER OF COPIES REQUIRED: 'LTTR ~

ENCL

il

~ t II I~

y 1

It r

'I tt It lt

P.o. BOX 529100 MIAMI,FI 33152 FLORIDA POWER 8 LIGHTCOMPANY July 22, 1980 L-80-230 Office of Nuclear Reactor Regulation Attention:

ffr. Darrell Eisenhut, Director Division of Licensing U.

S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear fir. Eisenhut:

Re:

Turkey Point Units 3 and 4 Docket Nos.

50-250 and 50-251 Proposed Amendment to Facility 0 eratin Licenses DPR-31 and DPR-41 In accordance with 10 CFR '50.30, Florida Power 8 Light Company submits herewith three (3) signed originals and forty.(40) copies of a request to amend Appendix A of Facility Operating Licenses DPR-31 and DPR-41.

This proposal addresses testing of the RHR system "at least once per 18 months" instead of "annually" as presently required.

The proposed amendment is shown on the accompanying Technical Specification page bearing the date of this letter in the lower right hand corner.

The proposed a'mendment has been.reviewed by the Turkey Point Plant Nuclear Safety Committee and the Florida Power

& Light Company Nuclear Review Board.

They have concluded that it does not involve an unreviewed safety question.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/NS/paf Attachment cc:

J.

P. O'Reilly, Region II Harold Reis, Esquire Pool 5

ili 893[03,Q G

PEOPLE... SERVING PEOPLE

ii iO C

V