ML17336A026

From kanterella
Jump to navigation Jump to search
Application to Amend License DPR-67,revising Radiological Effluent Tech Specs
ML17336A026
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/13/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17212B607 List:
References
L-82-201, NUDOCS 8205200083
Download: ML17336A026 (8)


Text

g%'

ei REGULATORY FORMATION DISTRIBUTION SY 'M (RIOS)

AOCESSION NBR; 8205200083 DOC.DATE: 82/05/13 NOTARIZED: YES DOCKET FAG IL:50 BYNAME335 St. Lucie Planti Uni't ii Florida Power 8 Light Co. 05000335

'AUTH AUTHOR AFFILIATION UHRIGr R E,~ Flor ida Power L Light Co,

~R BC IP NAME

~ RECIPIENT AFFILIATION EISENHUTr D G ~ ~ Division of Licensing

SUBJECT:

Appl ication to amend License IPR 67>revising radiological ef f1 uent Tech DISTRIBUTION A001S Specs'ODE:

COPIES 'RECEIyED:LTR ENCL qgSIZE:.. 4~6o TITLE: Genera 1 Distribution for af ter Issuance of Operating License NOTES:

RECIPIENT COPIES RECIPIENT ,COPIES ID CODE/NAVE LTTR ENCI ID CODE/NAME LTTR ENCL ORB P3 BC 01 7 7 INTERNAI: ELD/HOS2 1 0 NRR/DHFS DEPY08 1 1 NRR/OL OIR 1 1 NR B 1 0 NRR/DSI/RAB 1 1 G 0rI 1 1 RGN2 1 1 EXTERNAL: ACRS 09 10 10 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 NTIS 1, 1 TOTAL NUMBER OF COP IES REQUIRED: L~TTR 28 ENCL 26

V 4 W I $ 1 WV V

~'

$ ~ WI I W W

P.O. BOX 529100 MIAMI,FL 33152 iyglf/g~

FLORIDA POWER S1 LIGHT COMPANY May 13, 1982 L-82-201 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Eisenhut:

Re: St. Luci e Unit 1 Docket No. 50-335 Proposed License Amendment Radiological Effluent Technical Specification In accordance with 10 CFR 50.90, Florida Power 8 Light Company submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating License DPR-67.

Florida Power 81 Light submitted proposed Amendments to Appendices A and 8 of St. Lucie Unit 1 Technical Specifications on March 15, 1979 (L-79-61) and August 23, 1979 (L-79-232). The proposed amendments were for changes to the facility's Radiological Effluent Technical Specifications (RETs) pursuant to NUREG 0472. On March 4 and 5; 1982 we met with representatives of the NRC and its contractors to review the proposed amendments. The attached is the results of our review transmitted for the review and approval by the NRC as agreed upon at that time.

We request that these proposed amendments be approved effective January 1, 1983. This will allow us to effectively coordinate the implementation of the new Environmental Protection Plan and the pendi ng Technical Specifications for St. Lucie Unit 2. The additional time will also be necessary to allow for procedure writing and personnel training.

The proposed amendment is described below and shown on the acompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.

~pe e 1-6 gaol Definitions 1.31 to 1.35.have been added.

Table 1.2 Two additional sampling frequencies have been added to the table.

ssossoooss ssos1s PDR *DOCK OSOeO.OSSS"';- PDR p PEOPLE... SERVING PEOPLE

Re: St. Lucie Unit 1 Oocket No. 50-335 Proposed License Amendment Radiological Effluent Technical Specification Pages 3/4 3-30, 3/4 3-31 and Table 4.3-5 The meteorological instrumentation on specification was modified to reflect the new requirements.

Pages 3/4 3-45 through 3-49 Radioactive liquid effluent instrumentation requirements have been added.

Pages 3/4 3-50 through 3-54 Radiological gaseous process and effluent monitoring instrumentation requirements have been added.

Pages 3/4 11-1 through 11-13 The release rate limits for liquid and gaseous effluents have been moved from Appendix 8 to Appendix A and modified to the RETs format.

Page 3/4 11-14 The explosive gas mixtur e requirements of the RETs have been added.

Page 3/4 11-15 The total curie content of the gas storage tank allowed for site boundary released considerations has been added.

Page 3/4 11-16 The process control program for solidification of radioactive waste has been added.

Pa es 3/4 12-1 thru 3/4 12-10 The offsite radiological environmental monitoring program has been relocated from Appendix 8 to Appendix A including requirements of RETs.

Page 8 3/4 3-4 The bases for the radiological liquid and gaseous effluent instrumentation has been added.

Page 8 3/4 3-4 The bases for the Radiological Liquid and Gaseous Effluent instrumentation was added.

Re: St. Lucie Unit 1 Docket Ho. 50-335 Proposed License Amendment Radiolo ical Effluent Technical S ecification Pa es 8 3/4 11-1 thru 11-4 Radiological effluent bases from Appendix 8 have been expanded and relocated to Appendix A.

Page 8 3/4 11-5 Additional bases have been added.

~P/4 1-Radiological Environmental Monitoring bases have been moved from Appendix 8 to Appendix A.

Page 6-7 Section 6.5. 1.6.e and 6.5. 1.7.c have a title change, Section 6.5.1.6.k and l have been added to require review by the Facility Review Group.

Page 6-13 Section 6.7.1.d contains a title change, procedures requirements for 6.8. l.g, h 5 i have been added.

Page 6-17 Section 6.9.1.12.j 5 k are added to provide prompt reportabi lity for the gas storage tank and instantaneous release rates.

~Pa e 6-18 Section 6.9.1.9.e have been moved from Appendix 8 to Appendix A to provide 30 day reportability for unplanned offsite releases.

Page 6-19 Section 6.9.2.k and l, m, n 5 o have been added to require additional reports.

Pages 6-20 Chru 6-23 Section 6.9. 3 has been added to require reports for annual radiological effluent monitoring and semiannual radiological effluent release reports.

Pages 6-24 and 6-25 Section 6. 10.2 n 8=o have been added to provide for record retention.

Section 6.12 has been expanded to more completely define high radiation area.

Re: St. Lucie Unit No. 50-335 1'ocket Proposed License Amendment Radiological Effluent Technical S ecification Pages 6-27 and 6-28 Section 6. 17 has been added to include the Process Control Program.

Section 6.18 has been added to include the Offsite Dose Calculation Manual.

In addi tion to the above changes, modifications are to be made to the Technical Specifications of Appendix 8. These changes reflect the relocation of the radiological monitoring requirements into Appendix A.

PAGE DESCRIPTION OF CHANGE Delete Sections 1. 14, 1.15, and 2.4 from the Table of Contents.

Delete Sections 3.2 from the Table of Contents.

Delete entire page. Tables have been moved to Appendix A.

iv This page renumbered iii. Delete 3.2-1 and 3.2-2 from the Li st of Fi gures.

Delete frequency definitions for "semi-annually" and "refueling".

Delete definitions 1.14 (Batch Releases) and 1.15 (Continuous Release).

2-3 Delete Section 2.4 (Radioactive Fffluents).

2-4 through 2-20 Delete these pages in their entirety (Section 2.4).

3-5 Delete Section 3.2 (Radi ological Envi ronmental Monitoring).

3-6 through 3-16 Delete Section 3.2 in its entirety.

The responsibility of the Vice President of Nuclear Energy is revised (Section 5.1 second paragraph).

Specification 5.3.3.8.9 is deleted.

5-5 Delete Section 5.6. l.b (Annual Radiological Environmental Monitoring Report).

Re: St. Lucie Unit 1 Docket No. 50-335 Proposed License Amendment Radiolo ical Effluent Technical S ecification PAGE DESCRIPTION OF CHANGE 5-6 Delete entire page (Section 5.6. l.b.).

5-7 Delete Section 5.6.1.c (Semiannual Radioactive Effluent Release Report). The remaining material is moved to the bottom of page 5-5.

5-8 through 5-14 Delete these pages in their entirety (Section 5.6.1.c).

5-15 Delete Section 5.6.2.b (Radioactive Effluent Reports),

and renumber as page 5-6.

5-16 Delete the remainder of Section 5.6.2.b, and delete Section 5.6.2.c (Radiological Environmental Surveil lance Reports). Renumber as page 5-7.

5-17 Delete Section 5.7.2.c (records of radioactivity levels) and renumber Section 5.7.2.d as 5.7.2.c.

Correct typogr aphical error in Section 5.7.1.a. The reference at the end of the sentence should be "5.3.3.F. 5".

Move the remaining contents of this page to renumbered page 5-7.

The proposed amendment has been reviewed and aproved by the St. Lucie Facility Review Group and the Florida Power 8 Light Company Nuclear Review Board.

Very truly yours, Robert E Uhrig Vice President Advanced Systems 8 Technology REU/JEM/mbd Attachment cc: J.P. O'Reilly, Region II Harold F. Reis, Esquire