GO2-89-128, Forwards Instrument Air Sys Review Response to Generic Ltr 88-14, Per 890706 Commitment

From kanterella
(Redirected from ML17285A639)
Jump to navigation Jump to search
Forwards Instrument Air Sys Review Response to Generic Ltr 88-14, Per 890706 Commitment
ML17285A639
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/28/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17285A640 List:
References
GL-88-14, GO2-89-128, NUDOCS 8908030016
Download: ML17285A639 (3)


Text

ACCELE RATED ~ BUTlON DER ONSggTl ON SYSTEM 48 REGULATORY INFORMATXON DISTRXBUTXON SYSTEM (RIDS)

SUBJECT:

Forwards "Instrument Air Sys Review Response to Generic Ltr 88-14 DXSTRIBUTION CODE:

A048D COPIES'RECEIVED:LTR ENCL TITLE: OR/Licensing Submittal:

Equipment Qualification I

SIZE: /+

NOTES ACCESSION NBR:8908030016 DOC.DATE: 89/07/28 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATXON SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)

RECIPXENT XD CODE/NAME PD5 LA SAMWORTH<R INTERNAL: ACRS'RR/DEST/MEB 9H NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSXC COPIES LTTR ENCL 1

0 1

1 6

6 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD NRR/DEST/ADE 8H NRR/DEST/SGB 8D OC/MFMILE 01 NRC PDR COPXES LTTR ENCL 1

0 1

0 1

1 1

0 1

1 1

1 NCTE LO ALL "RIES" RIXIPIENIS:

PIZASE HELP US 'IO REDUCE %LSTRi CDHI'ACI'IHE DOCUMEÃZ CXÃIR3L DESK RDCN Pl-37 (EXT. 20079)

IO lKZMIlCQR KKR NAHB FSQM DIPHGBVXXQN LISTS POR DOCUMEHI'S MRJ DQNiT HEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 16 D

S

A II bl 1

H, 4

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 July 28, 1989 G02-89-128 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Mail Station Pl-137 Washington, D.C.

20555 Gentlemen:

Subject:

Reference:

SUPPLY SYSTEM NUCLEAR PLANT NO. 2 FINAL RESPONSE TO GENERIC LETTER 88-14 "INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT" Letter, G02-89-116, GC Sorensen (SS) to NRC same subject, dated July 6, 1989 As committed to in the reference, attached is the final summary of collected data and significant findings of the Instrument Air design and operations verification at WNP-2.

Although none of the findings identified are considered to jeopardize continued safe operation or impact the ability to safely shutdown the plant they are the subject of continued evaluation and will requir e final resolution.

This will require additional analysis and further interface with equipment vendors.

As a

result resolution is not anticipated until September 15, 1989.

At that time a

follow-up report will be submitted describing final determinations and schedule for any remaining analysis and/or plant modifications.

Very tr uly yours, G. C. Sorensen, Manager Regulatory Programs PLP/bk cc:

JB Martin -

NRC RV NS Reynolds - BCP8R RB Samworth -

NRC DL Williams - BPA/399 NRC Site Inspector 901A

-3 3909>3 39030-001 3ppp397 903 ACCCK 0 90C P