Application for Amend to License NPF-21,revising Tech Spec Surveillance Requirement 4.8.1.1.2.e.7 So That Tech Specs Consistent W/Design of Automatic Bypass Function of Diesel Generator Trips.Fee Paid
ML17285A132
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/02/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17285A134 List:
References
GO2-88-257, TAC-71390, NUDOCS 8812200185
Download: ML17285A132 (7)


Text

P-C CKlZRATED Dl BU'EON I}EMONSTP WON SYSTEM REGULAT NFORMATION DISTRIBUTIO TEM (RIDS)

ACCESSION NBR:8812200185 DOC.DATE: 88/12/02 NOTARIZED: YES DOCKET FACIL:50-397'PPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION BOUCHEY,G.D. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to License NPF-2l,revising Tech Spec Surveillance Requirement 4.8.1.1.2.e.7.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR I ENCL J SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDS LA 1 0 PD5 PD 2 2 SAMWORTH,R 1 1 h INTERNAL: ACRS 6 6 ARM/DAF/LFMB 1 0 NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SICB 1 1 NRR/DOEA/TSB 11 1 1 NRR/PMAS/ILRB12 1 1 NU TRACT 1 1 OGC/HDS2 1 0 EG FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 h

NOTE IO ALL 'KIDS" RE'CZPIENTS:

PIZASE HELP US TO REZQCE WASTE! CONI'ACT IHE DOCUMEPI'ONTEKL DESK, ROON P1-37 (EXT. 20079) m ELIMINATE RKR NAME FBCH DIPHtIBUTIGN LIST8 POR DOCUMENIS KRJ DGNiT NEEDf TOTAL NUMBER OF COPIES REQUIRED:. LTTR 26 ENCL 23

ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 December 2, 1988 G02"88-257 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Nail Station Pl-137 Washington, D. C. 20555

Subject:

. NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 4.8.1.1.2.e.7 In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and

2. 101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications. Specifically, the Supply System is requesting that surveillance 4.8. 1. 1.2.e.7 be revised (as attached). This is being revised so that the technical specifications are consistent with the design of the automatic bypass function of the diesel generator trips.

The design description discussed in the WNP-2 Final Safety Analysis Report sections 8.3.1. 1.8. 1.8 and 8.3.1. 1.8.2.8 states that for Divisions 1, 2 and 3 upon accident signal (low reactor water level, high drywell pressure) only the following diesel generator trips are effective:

o Engine overspeed o Generator differential relay action o Incomplete sequence .',

o Emergency stop pushbutton These changes were an oversight in the preparation of the WNP-2 technical specifications as the FSAR descriptions were issued in amendments 23 and 31 (February 1982 and June 1983) before issuance of the WNP-2 Operating License (December 1983) and should have been reflected in the technical specifications.

Currently the subject Technical Specification omits verification of the incomplete star ting sequence trip bypass upon an ECCS actuation signal for Division 3. It also inaccurately states that the automatic bypass function occurs upon a loss of voltage signal for Divisions 1, 2 and 3 concur rent with the accident signal. It occurs with the accident signal alone.

8812200l85 881202 PDR ADOCN; 05000397 P PNU

80 Page Two NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 .

REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCE RE()UIREMENT 4.8.1.1.2.e.7 The Supply System has reviewed this request per 10CFR50.59 and concluded that it does not involve an unreviewed safety question. The Supply System has also evaluated this request per 10CFR50.92 and pr ovides the following in support of a finding for no significant hazards consideration. This change does not:

1) Involve a significant increase in the probability or consequences of an accident previously evaluated because there is no change in system function.

The accident analyses performed for this equipment are based on the FSAR description and have not been changed. This change only corrects the inconsistency between the FSAR and technical specification description.

2) Create the possibility of a new or different kind of accident from an accident previously evaluated because there is no change to the actual design and system function is unchanged. The changes requested are strictly within the original safety analysis report and do not represent any new or different features.
3) Involve a significant reduction in a margin of safety because the omissions being corrected support the margin of safety originally evaluated in the FSAR and should have been carried into the technical specifications. Hence, the correction of these omissions does not impact a margin of safety.

As discussed above, the Supply System considers that this change does not involve a significant hazards consideration, nor is there a potential for significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor does it involve a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10CFR51.22(c)(9) and therefore, per 10CFR51.22(b), an environmental assessment of the change is not required.

This Technical Specification change has been reviewed and approved by the WNP-2 Plant Operations Committee (POC) and the Supply System Corporate Nuclear Safety Review Board (CNSRB).

In accordance with 10CFR170.21, an application fee of one hundred fifty dollars

($ 150.00) accompanies this request. In accordance with 10CFR50.91, the State of Washington has been provided a copy of this letter.

Very truly your s, G. C. Sorensen, ager Regulatory Programs Attachment cc: JB t1artin NRC RV NS Reynolds BCP8R RB Samworth NRC D Williams BPA/399 NRC Site Inspector - 901A

lf 1

14

STATE OF WASHINGTON)

Subject:

) 4.8.1.1.2.e.7 COUNTY OF BENTON )

I, G. D. Bouchey,, being duly sworn, subscribe to and say that I am the Director, Licensing 8 Assurance or the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE ~ , 1988 G. D. Bouchey, Di o Licensing 8 Assurance On this day personally appeared before me G. D. Bouchey to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIYEN under my hand and seal this ~~~< day of 988.

otar u ic sn n or SAE OF WASHINGTON Residing at

r~

P I'