ML17279A591

From kanterella
Jump to navigation Jump to search
Forwards Rev 3b to Pump & Valve Inservice Test Program Plan. Rev Incorporates Changes in Plan Due to Recent Design Changes to Plant,Including Info Available as of 870930.Fee Paid
ML17279A591
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/12/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17279A592 List:
References
GO2-87-262, NUDOCS 8710210253
Download: ML17279A591 (6)


Text

. REGL; Y INFORMATl" N DISTR IBU 'YSTEM (RIDS>

DEACCESSION NBR: 8710210288 DOC. DATE: 87/10/12 NOTARIZED: NQ DOCKET FACIL: 50-397 WPPSS Nuclear Pro Jecti Unit 2i Washington Public Powe 050003'V7 AUTH. NAME AUTHOR AFFILIATION SORENSENi G. C. Washington Public Power Supply System RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

P@qZ00~) ia /0-Sg Forwards Rev 3b to "Pump h Valve Inservice Test Program n-~'UBJECT:

Plan. " Rev incorporates changes in plan due to recent design changes to planti including info available as of 870930. Fee paid.

DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR J ENCL J SIZE: ~++

TITLE: OR Submittal: Inservice Inspection/Testing NOTES:

REC IP lENT COPIES REClr IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 0 PD5 PD 5 SAMWORTHi R 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 AEOD/DSP/TPAB ARM/DAF/LFMB 1 0 NRR/DEST/MEB 1 NRR/DEST/MTB 1 1

/ILRB 1 1 OGC/HDS2 1 0 G FIL 01 1 RES/DE/EIB 1 1 EXTERNAL: LPDR NSIC 1,

1 1

1 NRC PDR 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 2'P ENCL 26

~4 0

f .P 41'4 1

I I

1 I

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 87102i0253 87iOi2 PDR ADOCK 05000397 P PDR October 12, 1987 G02-87-262 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 RE/VEST FOR INTERIM APPROVAL OF REVISION 3B TO THE WNP-2 PUMP AND VALVE INSERVICE TEST PROGRAM PLAN The Supply System has updated the WNP-2 Pump and Valve Inservice Test Program Plan (Revision 3b). The primary pur pose of this revision was to incorporate changes to the Program Plan due to recent design changes to the plant. Additional changes associated with technical evaluation activities as well as numerous editorial, clerical, and administrative changes are also included. This revision of the Plan incorporates the latest information available as of September 30, 1987 and provides added assurance of public safety and material quality. This revision of the Plan is submitted as the controlling document gover ning the inservice testing of certain safety related pumps and valves at WNP-2. The current revisions of the implementing surveillance test procedures are based on the test requirements specified in this revision of the Plan.

Revision 2 of the Plan received interim approval from the Commission in the WNP-2 Safety Evaluation Report, Supplement 4, NUREG-0892 dated December, 1983 pending completion of a comprehensive review of the Plan. Since a comprehensive review of the Plan is still incomplete, the Supply System requests the Commission to grant interim approval of Revision 3b of the Plan such that WNP-2 will continue to have a legitimate basis for its implementing procedures.

OO C

CV w8 Cr".

~f ~

Q~

C3 f>%

Page Two October 12, 1987 REQUEST FOR INTERIM APPROVAL OF REVISION 3B TO THE WNP-2 PUMP 8 VALVE INSERVICE TEST PROGRAM PLAN Enclosed for NRC review are five (5) copies of Revision 3b of the Plan.

Additional copies and drawings will be furnished upon request. Also, enclosed is an application fee'f One hundred fifty dollars ($ 150.00) in accordance with 10 CFR 170. 12(f). Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs RPW/tmh Attachments cc: JB Martin NRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams BPA - 399 NRC Site Inspector - 901A