Application for Amend to License NPF-21,revising Tech Specs to Clarify Operating Conditions for Radioactive Effluent Monitoring & Correct Clerical Error in Table 4.3.7.12-1
ML17278A339
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/12/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML17278A340 List:
References
GO2-85-445, TAC-59500, NUDOCS 8508190232
Download: ML17278A339 (7)


Text

r RESULAT +ORNATION DISTRISUTIOIi ~ YQN (RIDS)

ACCESSION NBR;8508190232 DOC ~ DATE: 85/08/12 NOTARIZED: YES DOCKET FACIL:50"397 BYNAME NPPSS Nuclear Projects Unit 2E washington Public Powe'5000397 AUTH AUTHOR AFFILIATION SORENSENEG.C. Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION BUTLEREN ~ RE Licensing Branch 2

SUBJECT:

Appl-ication for amend to License NPF-2}irevising Tech SpeCs to clarify operating. conditions for radioactive effluent-monitoring L correct clerical error in Table A.3+7> 12 1.

DISTRISUTI N CODE.: A001D COPIES RECEIVED:LTR ENCL. SIZE; TITLE: OR SUbmittal; General Distribution NOTES; OL: 12/20/83 ~/~ r S+r ~ ~pc~

05000397 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL' NRR LB2 BC 01 7 7 INTERNAL; ACRS 09 6 6 ADM/LFMB 0.

ELD/HDS2 1 0 NRR/DE/MTEB 1 1 NRA/DL DIR 1 1 NRR/DL/DRAB 1 0.

NRR/DL/TSRG 1 1 N METB 1- 1=

NRR/DSI/RAB 1 1 1 1 RGN5 1 1 EXTERNAL: 24X 1 1 EGLG BRUSKEES LPDR 03- 1- 1 NRC PDR 02 NSIC 05 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCI 25

nj i t~

t

'l h

~ ~

ASJ'f 0 I r

II H

~ ~

~~

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 August 12, 1985 G02-85-445 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. W. R. Butler, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Butler:

Subject:

NUCLEAR PLANT NO. 2 RE(UEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS FOR OFFGAS TREATMENT MONITORS (3. 11.2.7, 4. 11.2.7.1, TABLE 3.3.7. 12-1 AND TABLE 4.3.7. 12-1)

In accordance with the Code of Federal Regulations (CFR), Title 10, Parts 50.90 and 2. 101, the Supply System hereby requests an amendment to the subject Technical Specifications. Specifically, the Supply System is requesting a change to specifications: 3/4.3.7. 12 and 3/4. 11.2.7. The changes are identified by the attached revision proposals and are being requested to clarify the operating conditions for which radioactive effluent monitoring is required.

It is our belief that the requested change to Table 4.3.7. 12-1 corrects a clerical error because Table 3.3.7. 12-1 specifies applicability to be during offgas system operation only. The WNP-2 offgas system design requires plant operation or nuclear steam fol the system to operate.

This further supports our belief and negates the need to surveillance test the device during periods of reactor shutdown or offgas system inoperability. When the offg'as system is not in operation there is no process flow to sample. This proposed revision changes applicability to:

During Main Condenser Offgas Treatment System Operation (see pg. 3/4.3-93).

Table 3.3.7. 12-1; Action Statement 114 (pg. 3/4 3-92, attached) is being changed to address process related instrumentation. The turbine building vent noble gas monitor presently referred to in ACTION 114 does not monitor arid can not be placed in a configuration to monitor the activity from the main condenser offgas treatment system. The offgas post-treatment monitor is process related and can be aligned to monitor offgas flow prior to treatment. A single channel of the 2 of 2 post-treatment logic will be aligned to sample prior to treatment and functionally tripped to maintain the post-treatment isolation function operable. This main-tains the ability to moni tor the pre-treatment sample path and the correct functional relationship between the post and pre-treatment monitors.

flP PDgR 0~~> 8>o812 ADOCN 0500039y I I '

g g pe~~

P

~nag

W. R. Butler Page Two August'2, 1985 RE(UEST FOR AMENDMENT TO TECH. SPEC. FOR OFFGAS TREATMENT MONITORS In the event one of the two post-treatment monitors fails, a temporary pre-treatment monitor will be used to support the monitoring function required by LCO 3/4. 11.2.7 and 3/4.4.5. This approach is considered acceptable since the pre-treatment monitor provides no automatic function.

In general, these Technical Specification revisions are designed to;

1) structure"LCO's 3/4.11.2.7 and 3/4.3.7.12 to agree and represent the offgas system 'design, 2) provide for the surveillance requirements in LCO's 3/4. 11.2.7 and 3/4.4.5 and provide for component failure with the current structure of each LCO.

The Supply System has reviewed these changes per 10 CFR 50.59 and determined that no unreviewed safety questions will result from this amendment.

The Supply System has reviewed these changes per 10 CFR 50.92 and determined that they do not:

1) Involve a significant increase in the probability or consequences of an accident previously evaluated because the proposed change will require surveillance and monitoring only when offgas system is in service.
2) Create the possibility of a new or different kind of accident than previously evaluated because clarification of the operating conditions for which radioactive effluent monitoring is required is applicable only when the system is in service.
3) Involve a significant reduction in result in Surveillance Requirements a margin of safety because it will which will accurately reflect the design basis of the system.

The Supply System has evaluated this request in accordance with the criteria contained in 10 CFR 170.21 and has included a warrant for One hundred fifty dollars ($ 150.00) as initial payment for this application for amendment under Facility Category A (Power, Reactors). In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.

This Technical Specification change has been reviewed and approved by the WNP-2 Plant Operations Committee (POC) and the Supply System Corporate Nuclear Safety Review Board (CNSRB). Should you have any questions, please contact Mr. P. L. Powell, Manager, WNP.-2 Licensing.

Yery trul yours,

~ G. C. Sorensen, Manager Regulatory Programs S IS/MRW/tmh Attachments cc: JO Bradfute - NRC JB Mar tin - NRC RV WS Chin - BPA E Revell - BPA C Eschels - EFSEC AD Toth - NRC Site NS Reynolds - BLCP8R

~~ ~~

I Ui

Tech Spec Amendment STATE OF WASHINGTON Offgas Treatment Monitors

)

)

County of Benton I, R. B. GLASSCOCK, being duly sworn, subscribe to and say that I am the Director, Licensing 8 Assurance for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE , 1985 R. B. G asscoc , Director Licensing 8 Assurance On this day personally appeared before me R. B. Glasscock to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIYEN under my hand and seal this 't2. day of , 1985.

oary u sc sn orte State of Washington Residing a

~0 ~0 I

~ ~ lkgg~~ Jy II~~gg4 I' Q

n Qk e~

I r p ~

wqyyqqll'